Skip to content

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Sign in
DIOT reliability studies project
DIOT reliability studies project
  • Project
    • Project
    • Details
    • Activity
    • Cycle Analytics
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
    • Charts
  • Issues 1
    • Issues 1
    • List
    • Board
    • Labels
    • Milestones
  • Merge Requests 2
    • Merge Requests 2
  • CI / CD
    • CI / CD
    • Pipelines
    • Jobs
    • Schedules
    • Charts
  • Wiki
    • Wiki
  • Snippets
    • Snippets
  • image/svg+xml
    Discourse
    • Discourse
  • Members
    • Members
  • Collapse sidebar
  • Activity
  • Graph
  • Charts
  • Create a new issue
  • Jobs
  • Commits
  • Issue Boards
  • Projects
  • DIOT reliability studies projectDIOT reliability studies project
  • Wiki
    • Dependability meetings
  • Emc consultancy (sy rf)

Emc consultancy (sy rf)

Last edited by Volker Schramm Nov 05, 2021
Page history

03.11.2021

Participants: G. Daniluk, S. Danzeca, V. Schramm, D. Valuch

Slides

20211102_EMC_meeting_RF.pdf

Notes

  • Tests which can be performed with the equipment of the 864/R-B02 lab and which are recommended:
    • ESD (recommended; potentially an ESD gun is to be purchased)
    • EFT/Burst (recommended)
    • Surge (recommended)
    • Radiated immunity (to be checked with users whether necessary)
    • Conducted disturbances (recommended)
    • Voltage dips, drops and interruptions (recommended)
    • Magnetic field (easy to test, but TBC whether necessary)
  • Emission testing may not be necessary for the installation regions of the DI/OT.
  • Approach to test until failure and to evaluate the obtained immunity level. If necessary design optimisations are to be implemented.
  • 3-step-strategy to perform an 1) EMC Design Review, followed by 2) Pre-Compliance Testing, and final 3) Approval Testing alongside the DI/OT design process (see slide 10).
  • All three process steps can be performed at CERN. Unless a certification is needed, no need is seen to perform EMC testing outside of CERN.
  • A CERN EMC expert panel can be available to review the design regarding EMC.
  • Assistance to perform the tests is also available.

Major Outcomes & Actions

  • Once available, DI/OT design files to be sent for EMC design review to expert panel
  • DI/OT EMC strategy to be defined and to be reviewed by expert panel during design review
Clone repository
  • Home
  • dependability-meetings
    • Diot testing strategy kickoff
    • Emc consultancy (sy rf)
    • Ratopus eol & testing strategy (sy epc)
    • Ratopus thermal performance
    • Diot emc review meeting 1
    • Emc consultancy (ep ese)
More Pages

New Wiki Page

Tip: You can specify the full path for the new file. We will automatically create any missing directories.