Skip to content

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Sign in
DIOT reliability studies project
DIOT reliability studies project
  • Project
    • Project
    • Details
    • Activity
    • Cycle Analytics
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
    • Charts
  • Issues 1
    • Issues 1
    • List
    • Board
    • Labels
    • Milestones
  • Merge Requests 2
    • Merge Requests 2
  • CI / CD
    • CI / CD
    • Pipelines
    • Jobs
    • Schedules
    • Charts
  • Wiki
    • Wiki
  • Snippets
    • Snippets
  • image/svg+xml
    Discourse
    • Discourse
  • Members
    • Members
  • Collapse sidebar
  • Activity
  • Graph
  • Charts
  • Create a new issue
  • Jobs
  • Commits
  • Issue Boards
  • Projects
  • DIOT reliability studies projectDIOT reliability studies project
  • Wiki
  • Home

Home

Last edited by Volker Schramm Nov 16, 2022
Page history

Distributed I/O Tier Reliability/Dependability

Main project: DI/OT

Project description

The Distributed I/O Tier (DI/OT) hardware kit is currently being developed to serve within a variety of accelerator control systems including critical applications. To ensure a high level of dependability in these applications a methodological approach is pursued defining a variety of activities during several life cycle phases.

Methodology

Documents

Main Document - DI/OT Dependability Strategy

DIOT_DependabilityMainDoc_V1.1 (Approved 11/2021)

Analysis Reports

  • Top Level Analysis Report
  • COTS PSU Selection (restricted access)
  • RaToPUS Analysis Report
  • Radtol System Board Analysis Report
  • nanoFIP FMC Analysis Report
  • MoniMods Analysis Report
  • Nonrad System Board Analysis Report
  • DIOT Crate Analysis report

Isograph Model Files

  • Isograph repository (various)
  • Radtol variant FTA (Status 11/2022, to be updated for future versions)
  • Isograph user manual (Status 11/2022)

Testing Reports

  • Radtol SB Validation Testing Report (Rev. 0.2)
  • Nonrad SB Validation Testing Report (Rev. 0.1)

Presentations

Reliability Engineering and its Adoption for the DI/OT, BE-CO Technical Meeting, 08.10.2020 (CERN access only)
R2E: Strategy for DI/OT Dependability Studies, R2E BE/CO status and plans, 25.06.2020; Ensuring high-reliability for the DI/OT hardware kit, R2E Annual Meeting - 2021, 03.02.2021
Designing, Validating and Demonstrating High Reliability for the DI/OT Hardware Kit RAS WG meeting, 25.03.2021
DI/OT Design and Qualification for High Reliability, DI/OT Technical Review, 16.03.2022 (CERN access only)

Contacts

  • Volker Schramm - (not at CERN anymore)
  • Rudy Ferraro - CERN

Status

Date Event
06/2020 Start of the project
06/2021 Main dependability strategy doc V1 sent for review
11/2021 Main dependability strategy doc approved; First analysis report uploaded (RaToPUS)
10/2022 Radiation-tolerant DI/OT crate version all modules analysed and modelled in Isograph
11/2022 First validation testing report (radtol SB Rev. 0.2) uploaded
11/2022 Files archive given to G. Daniluk + tasks, recommendation, and references table + handover meeting slides
12/2022 Handover of the dependability project to R. Ferraro
Clone repository
  • Home
  • dependability-meetings
    • Diot testing strategy kickoff
    • Emc consultancy (sy rf)
    • Ratopus eol & testing strategy (sy epc)
    • Ratopus thermal performance
    • Diot emc review meeting 1
    • Emc consultancy (ep ese)
More Pages

New Wiki Page

Tip: You can specify the full path for the new file. We will automatically create any missing directories.