Add test points for power supplies and ground posts
This will make both debugging and production testing easier
This will make both debugging and production testing easier
No child items are currently assigned. Use child items to break down this issue into smaller parts.
Link issues together to show that they're related. Learn more.
Any preferences on side? Bottom side (the side with the FMC connectors) or top side?
I think top side would be more convenient when doing measurements in µTCA crate.
assigned to @tprzywoz
changed milestone to %AFC v4.0
marked #107 (closed) as a duplicate of this issue
Added TS for each PS on schematics.
Solved in c961a747
closed