Skip to content

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Sign in
O
OHR Support
  • Project
    • Project
    • Details
    • Activity
    • Cycle Analytics
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
    • Charts
  • Issues 97
    • Issues 97
    • List
    • Board
    • Labels
    • Milestones
  • Merge Requests 0
    • Merge Requests 0
  • Wiki
    • Wiki
  • image/svg+xml
    Discourse
    • Discourse
  • Members
    • Members
  • Collapse sidebar
  • Activity
  • Graph
  • Charts
  • Create a new issue
  • Commits
  • Issue Boards
  • Projects
  • OHR Support
  • Issues
  • #373

Closed
Open
Opened May 06, 2019 by Evangelia Gousiou@egousiou
  • Report abuse
  • New issue
Report abuse New issue

[white-rabbit] wiki issues

main page

  • at the "White Rabbit Users" section, both links "(full list)" and "Users of White Rabbit Technology" link to the same page
  • remove "11 October 2018" at the bottom of the page

Overview page

  • the "White Rabbit -> Overview" is not needed i believe, as just above one can see "Projects -> White Rabbit -> Wiki -> Overview"
  • in "Documentation" section there is an empty line
  • remove "24 October 2017" at the bottom of the page
  • the "Contacts section appears too long; could be shrunk in a couple of lines

White Rabbit Users page

  • the page has very interesting information, but is way too long to be easily readable:-o what about splitting in domains of use cases?
  • the "White Rabbit -> Users of White Rabbit Technology" is not needed i believe, as just above one can see "Projects -> White Rabbit -> Wiki -> WRUsers"
  • broken link: Arkus, Japan
  • broken wikipedia link: Baikal Deep Underwater Neutrino Telescope - BDUNT
  • broken link: TE-EPC
  • broken link: BE-RF-FB
  • broken link: SPEC
  • broken link: BE-RF-CS
  • broken link: LHC Instabilities Trigger Distribution
  • broken link: Instability diagnostics
  • broken link: CERN Prototype of DUNE
  • broken link: Opportunities with ProtoDUNE-DP
  • broken wikipedia link: CNGS
  • some sentences starting with "**":
    • ** We are running now 9 SPECs for our gamma-ray array prototype.
    • ** Performance results of the first White Rabbit installation for CNGS time transfer
    • ** CERN to Gran Sasso Time Transfer
    • ** Selected Research Topic S15.
    • ** Looking for partners (deadline 5 October 2015)
  • broken link Results from the WhiteRabbit sub-nsec time synchronization setup at HiSCORE-Tunka
  • broken link EISCAT 3D Preparatory Phase Project, Deliverable 8.1: Report on the evaluation of possible synchronization/calibration solutions
  • broken link Synchronization issues at ELI-ALPS
  • broken link Fermilab
  • broken link General Machine Timing System at FAIR
  • broken link White Rabbit Technology as Basis for the FAIR Timing System
  • broken link Timing System Documents
  • broken link White Rabbit Facility
  • broken link Digital Optical Modules
  • broken link LHAASO
  • broken link White Rabbit at SYRTE
  • broken link Allied Partners
  • broken link Overview of Data Acquisition and Central Control System of Steady state Superconducting Tokamak -SST-1
  • broken link Electrical-Optical / Optical-Electrical - EO/OE - Calibration
  • sentence starting with "_": "_The aim of the.."
  • broken link Project Outline and all the EUREKA links
  • broken link SuperB
  • broken link ICRC2013 paper 1158
  • opening of two parenthesis in link: (blog(Particle-collider technology to help NI build time-aware systems)
  • remove "6 March 2019" at the bottom of the page

WR presentations page

  • same as before, I believe this could be skipped: "White Rabbit -> Overview -> Presentations"
  • broken link RSI: Swiss Italian TV
  • broken link ISPCS2016
  • broken link ISPCS2014
  • broken link EFTS 2014(2014 European Frequency and Time Seminar)
  • broken link HPSPSA workshop,
  • broken link abstract: presentation
  • broken link Invited talk.
  • broken link poster
  • broken link The New White Rabbit Based Timing System for the FAIR Facility
  • remove "6 November 2018" at the bottom of the page

WR publications page

  • same as before, I believe this could be skipped: "White Rabbit -> Overview -> Papers"
  • broken link The White Rabbit Project
  • broken link White Rabbit Applications for FAIR Experiments
  • broken link Paving the Way for the FAIR General Machine Timing System
  • broken link How to create successful open hardware projects - about White Rabbits and open fields
  • broken link White Rabbit Technology as Basis for the FAIR Timing System
  • broken link White Rabbit – Sensor/Actuator Protocol for the CERN LHC Particle Accelerator
  • remove "15 November 2018" at the bottom of the page

WR testing page

  • broken link White Rabbit RFC 2889 Benchmarking Methodology for LAN Switching Devices
  • stray "": LFF:, HLF:*
  • remove "14 November 2018" at the bottom of the page

WR status page

  • same as before, I believe this could be skipped: White Rabbit -> Status""
  • broken link WR switch PTP compliance tested in ISPCS 2010 plugfest.
  • broken link ISPCS
  • broken link 45 improvements and extensions made
  • on "Major events table" the line 30-08-2017 is a bit messed up
  • remove "18 December 2017" at the bottom of the page

newsletter-2018-09 page

  • broken link central controller
  • broken link operational since 2015.
  • several references like the following are not easily readable:
    • "[1]":https://indico.cern.ch/event/493989/contributions/2005320/1254851
    • "[1]":http://inspirehep.net/record/1483337/files/PoS(ICRC2015)1041.pdf
    • "[2]":https://www.asterics2020.eu/article/testing-white-rabbit-hardware-field-conditions-siberia))
    • "[1]":http://inspirehep.net/record/1483337/files/PoS(ICRC2015)1041.pdf.
  • space before .: was studied .
  • not proper link: WR-LEN"":http://sevensols.com/index.php/products/wr-len/
  • broken link NIST has successfully evaluated WR for distribution of NIST's UTC realization across campus.
  • broken link Deutsche Börse
  • broken link a high precision time synchronization pilot project using the White Rabbit protocol.
  • subtitles appear with a * in the end, like:
    • At GSI, WR is used for time-triggered control and timestamping.*
    • At ESRF, WR is used for RF-synchronous clock and trigger distribution, and timestamping in WR or RF clock domain.*
    • At JINR, WR is used for time/frequency distribution and timestamping.*
  • remove "5 September 2018" at the bottom of the page

WR companies page

  • same as before, I believe this could be skipped: "White-Rabbit -> Companies involved in White Rabbit"; also the White-Rabbit is a broken link
  • missing link to "The IEEE 1588v2 (Precision Time Protocol, PTP) is implemented on MegaBEE platform using White Rabbit (WR) ..."
  • broken link Block diagram showing White Rabbit
  • broken link WP 14 and Timing Sync Eiscat Technical meeting 20131105,
  • broken link High Performance Time-based Synchronization
  • broken link (search PXI-6685 on ni.com)
  • "disabled" page ADQ7AC
  • remove "6 march 2019" at the bottom of the page

WR projects page

  • same as before, I believe this could be skipped: "White-Rabbit -> White Rabbit projects"; also the White-Rabbit is a broken link
  • broken link White Rabbit Network Robustness
  • broken link Cleopatra
  • link /Maciej does not link to Maciej's id
  • remove "31 March 2017" at the bottom of the page

oct2018meeting page

  • remove "11 October 2018" at the bottom of the page

WR workshops

  • same as before, I believe this could be skipped: "White-Rabbit -> Workshops"; also the White-Rabbit is a broken link

Workshop3 page

  • link [[http://building.web.cern.ch/map/building?bno=864][864-1-c02]]
  • broken link 6-2-024
  • remove "-- Main.JavierSerrano - 08 Jun 2009" at the bottom of the page

Dec2010Meeting page

  • broken links to meeting rooms
  • remove . from "Agenda."

Dec2010Meeting page

  • broken link http://www.gsi.de/informationen/kurier/archiv/2011-20/
  • broken link http://en.wikipedia.org/wikis/Schuko .
  • agenda table completely messed up
  • broken link http://www.gsi.de/portrait/index_e.html
  • broken link http://www.gsi.de/informationen/users/verkehr/GSI_Flyer_Lageplan_2008.pdf
  • broken link http://www.rmv.de/airport/startseite.do
  • broken link https://www.rmv.de/coremedia/generator/Bilder/0Abbildungen/PlaeneNetzplaene/PLA__Schienennetzplan_3Dgr,property=image.gif
  • broken link https://www.rmv.de/coremedia/generator/Bilder/0Abbildungen/PlaeneNetzplaene/PLA__Schienennetzplan_3Dgr,property=image.gif
  • broken link http://www.iwcip.org/2005/darmstadt.gif

Sep2011Meeting page

  • broken links to meeting rooms and phonebook

Mar2012Meeting page

  • several * ath the end of words, like
    • Getting to GSI*..etc
  • Preliminary agenda table for Friday, 23 March, 2012 completely messed up
  • broken link Official Info by GSI
  • broken link Information about accommodation

Nov2012Meeting page

  • broken link White Rabbit
  • for some talks there is no link to the material
  • remove "30 November 2012" at the bottom of the page

Mar2016Meeting page

  • broken link White Rabbit
  • there is a separate link here to the list of participants; i find this better than the pages of all the previous workshops, where the list is in the same page as the talks
  • not properly linked to Javier Serrano
  • broken link to indico Follow this link to join the meeting

Oct2017Meeting page

  • broken link WR Streamers

Jun2018Meeting page

  • broken link Participant list
  • Workshop agenda has no information
  • Workshop Poster has no information
  • remove "11 October 2018" at the bottom of the page
Assignee
Assign to
None
Milestone
None
Assign milestone
Time tracking
None
Due date
No due date
0
Labels
None
Assign labels
  • View project labels
Reference: project/ohr-support#373