Skip to content

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Sign in
C
Conv TTL RS485 - Testing
  • Project
    • Project
    • Details
    • Activity
    • Cycle Analytics
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
    • Charts
  • Issues 3
    • Issues 3
    • List
    • Board
    • Labels
    • Milestones
  • Merge Requests 0
    • Merge Requests 0
  • Wiki
    • Wiki
  • image/svg+xml
    Discourse
    • Discourse
  • Members
    • Members
  • Collapse sidebar
  • Activity
  • Graph
  • Charts
  • Create a new issue
  • Commits
  • Issue Boards
  • Projects
  • Conv TTL RS485 - Testing
  • Wiki
  • Conv ttl rs485 v4_0 tests

Conv ttl rs485 v4_0 tests

Last edited by Denia Bouhired-Ferrag Jul 10, 2018
Page history

CONV-TTL-RS485 v4.0 tests

Prior to launching production for 320 CONV-TTL-RS485 boards, tests were carried out with the two possible RTMs, the CONV-TTL-RTM-RS485-OPT and the CONV-RS485-OPT-RTM boards.

For GMT (General Machine Timing) reception, the main criteria for testing was to ascertain correct reception of these frames by the CTRV (the CERN VME timing receiver board). The CTRV is able to check the timing frames received, and signals errors in terms of missed timing messages, and in terms of its own PLL being able to lock to the signal received.

Signal distribution in optical

Test description*

  • Lab bench measurements
  • Optical distribution of timing frames through 10km fibre.

Test results* CTRV signals no errors in received frames and no PLL errors after about a week of continuous reception.

Signal distribution in copper

Test description*

  • Soft lab measurements
  • Copper distribution of SPS timing frames through 1.15km copper VH4 cable.

Test results* CTRV signals no errors in received frames and no PLL errors after about a week of continuous reception.


Taken on July 10th, this screenshot above shows no pll errors or missed GMT frames have been recorded with long cable distribution

Mixed copper/optical distribution

Test description*

  • CERN installations, with existing distribution network including multiple hardware modules and legacy repeater hardware.

Test results* CTRV signals no errors in received frames and no PLL errors after about 7 weeks of continuous reception (From May 22/05/2018)

Conclusions

The conv-ttl-rs485 board is in its 4th version. It has been tested in various configurations even before the tests detailed before. Though more tests are required for the optical RTM, the motherboard itself has performed well during testing and no more modifications in hardware are needed. Production can therefore be launched.


Denia Bouhired - July 10th, 2018

Files

  • ctrtest-snapshot.PNG
Clone repository
  • Conv ttl rs485 v4_0 tests
  • Documents
  • Home
  • Rtm
  • Documents
    • Cern installations
    • Front module documentation
    • Gateware guide for the conv ttl rs485 pts
    • Pts hardware guide
    • Project attachments
More Pages

New Wiki Page

Tip: You can specify the full path for the new file. We will automatically create any missing directories.