... | @@ -5,6 +5,13 @@ |
... | @@ -5,6 +5,13 @@ |
|
- [CERN](http://public.web.cern.ch/public/)
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
- ATLAS
|
|
- ATLAS
|
|
- Seismic measurements (M.Guinchard, Nov-Dec.2015)
|
|
- Seismic measurements (M.Guinchard, Nov-Dec.2015)
|
|
|
|
- *As it was plan in the best schedule, the first set of
|
|
|
|
vibration measurements was performed this afternoon
|
|
|
|
during core drilling operation at point 1. We took
|
|
|
|
measurements for several depths 10,20,30,40,50 and 60m.
|
|
|
|
Seismic sensors connected to spectrum analyzer in UJ16
|
|
|
|
were perfectly synchronized with the same equipments at
|
|
|
|
the surface thanks to BE-CO team. (12 Nov. 2015)*
|
|
- General Machine Timing system upgrade in the Antiproton
|
|
- General Machine Timing system upgrade in the Antiproton
|
|
Decelerator and the ELENA ring (Jean-Claude Bau, January 2013)
|
|
Decelerator and the ELENA ring (Jean-Claude Bau, January 2013)
|
|
- BTrain upgrade: a system to distribute the value of the bending
|
|
- BTrain upgrade: a system to distribute the value of the bending
|
... | @@ -662,5 +669,5 @@ and a successful one. (EH, The Netherlands, 13/10/2015) |
... | @@ -662,5 +669,5 @@ and a successful one. (EH, The Netherlands, 13/10/2015) |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
9 November 2015
|
|
13 November 2015
|
|
|
|
|