... | ... | @@ -25,9 +25,10 @@ |
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
|
Observation) project Deploying 10,000 detectors over 1 square km
|
|
|
at Tibet.
|
|
|
- Abstract [*Sub-nanosecond Timing System Design and
|
|
|
Development for LHAASO
|
|
|
Project*](http://www.esrf.eu/icalepcs2011/html/auth0335.htm),
|
|
|
- *Sub-nanosecond Timing System Design and Development for
|
|
|
LHAASO Project*
|
|
|
[Slides](http://www.esrf.eu/icalepcs2011/html/auth0444.htm),
|
|
|
[Article](http://accelconf.web.cern.ch/accelconf/icalepcs2011/papers/webhmult04.pdf):
|
|
|
[ICALEPCS 2011 conference](http://icalepcs2011.esrf.eu)
|
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
... | ... | @@ -85,5 +86,5 @@ |
|
|
|
|
|
-----
|
|
|
|
|
|
29 September 2012
|
|
|
1 October 2012
|
|
|
|