... | ... | @@ -2,6 +2,12 @@ |
|
|
|
|
|
## Committed
|
|
|
|
|
|
- [Arkus, Japan](http://www.arkus.co.jp) (Japanese only)
|
|
|
- Fixed latency trigger distribution system (April 2014, F.de
|
|
|
Guzman)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
|
- ATLAS
|
|
|
- Seismic measurements (M.Guinchard, Nov-Dec.2015)
|
... | ... | @@ -80,23 +86,6 @@ |
|
|
Rabbit](https://wikis.cern.ch/display/HT/SPS+RF+distribution+over+White+Rabbit)
|
|
|
on CERN CO wikis (CERN access only)
|
|
|
|
|
|
* CNGS Timing for neutrino measurements (2012-2014)
|
|
|
|
|
|
*\* *We are running now 9 SPECs for our gamma-ray array prototype.*
|
|
|
(November 2013)
|
|
|
|
|
|
*\* [*Performance results of the first White Rabbit installation for
|
|
|
CNGS time
|
|
|
transfer*](https://www.ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf)
|
|
|
(pdf)
|
|
|
|
|
|
*\* [CERN to Gran Sasso Time
|
|
|
Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
|
|
|
|
- [Arkus, Japan](http://www.arkus.co.jp) (Japanese only)
|
|
|
- Fixed latency trigger distribution system (April 2014, F.de
|
|
|
Guzman)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- " Cherenkov Telescope Array":http://www.cta-observatory.org/
|
... | ... | @@ -134,7 +123,19 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
- 700 measurement nodes will be installed at three independent
|
|
|
locations. (M.Emke, Feb.2015)
|
|
|
|
|
|
<!-- end list -->
|
|
|
* [CNGS](https://en.wikipedia.org/wikis/CERN_Neutrinos_to_Gran_Sasso)
|
|
|
Timing for neutrino measurements (2012-2014)
|
|
|
|
|
|
*\* *We are running now 9 SPECs for our gamma-ray array prototype.*
|
|
|
(November 2013)
|
|
|
|
|
|
*\* [*Performance results of the first White Rabbit installation for
|
|
|
CNGS time
|
|
|
transfer*](https://www.ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf)
|
|
|
(pdf)
|
|
|
|
|
|
*\* [CERN to Gran Sasso Time
|
|
|
Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
|
|
|
|
- [Culham Centre for Fusion Energy](http://www.ccfe.ac.uk/) (G.
|
|
|
Naylor, S.Hall, B.Huang, Jan.2013-Apr.2015)
|
... | ... | @@ -208,6 +209,18 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
objects](http://www.dlr.de/tp/en/desktopdefault.aspx/tabid-7107/11750_read-27635/)
|
|
|
(January 2015)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [EISCAT](http://www.eiscat.se/), Sweden
|
|
|
- [High Performance Time-based
|
|
|
Synchronization](https://www.eiscat3d.se/sites/default/files/WP8_Final_report.pdf#page=56),
|
|
|
section 4.1 of EISCAT 3D Preparatory Phase Project - Deliverable
|
|
|
8.5: Report on all WP8 activities, Sept.2014
|
|
|
- [EISCAT 3D Preparatory Phase Project, Deliverable 8.1: Report on
|
|
|
the evaluation of possible synchronization/calibration
|
|
|
solutions](https://www.eiscat3d.se/sites/default/files/eiscat3d_deliverable_8.1.pdf),
|
|
|
Oct.2012
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [EPFL](http://epfl.ch)
|
... | ... | @@ -225,18 +238,6 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
- [EPFL Smart Grid - The Vision](http://smartgrid.epfl.ch/)
|
|
|
- White Rabbit based Time Synchronization for PMUs (Nov 2016)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [EISCAT](http://www.eiscat.se/), Sweden
|
|
|
- [High Performance Time-based
|
|
|
Synchronization](https://www.eiscat3d.se/sites/default/files/WP8_Final_report.pdf#page=56),
|
|
|
section 4.1 of EISCAT 3D Preparatory Phase Project - Deliverable
|
|
|
8.5: Report on all WP8 activities, Sept.2014
|
|
|
- [EISCAT 3D Preparatory Phase Project, Deliverable 8.1: Report on
|
|
|
the evaluation of possible synchronization/calibration
|
|
|
solutions](https://www.eiscat3d.se/sites/default/files/eiscat3d_deliverable_8.1.pdf),
|
|
|
Oct.2012
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en), Spain
|
... | ... | @@ -345,11 +346,13 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
RabbitandKM3NeT](https://www.ohwr.org/project/white-rabbit/uploads/635abe92104c2b25d05615c80e730b51/121128_WR_Workshop_7_KM3NeT.pdf)
|
|
|
presented at the [Seventh White Rabbit
|
|
|
Workshop](https://www.ohwr.org/project/white-rabbit/wikis/Nov2012Meeting),
|
|
|
Madrid (Spain), 27-28 November 2012
|
|
|
Madrid (Spain), 27-28 November
|
|
|
2012
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- LHAASO ([Tsinghua University,
|
|
|
- [LHAASO](http://physicsworld.com/cws/article/news/2016)
|
|
|
([Tsinghua University,
|
|
|
China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
|
Observation) project Deploying 10,000 detectors over 1 square km
|
... | ... | @@ -470,8 +473,8 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics, The
|
|
|
Netherlands
|
|
|
- [Vrije Universiteit Amsterdam, dept of Physics and
|
|
|
Astronomics](https://www.nat.vu.nl/en/index.aspx), The Netherlands
|
|
|
- [SuperGPS through optical
|
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
|
|
- [Workshop on Optical Networks for Accurate Time and Frequency
|
... | ... | |