... | ... | @@ -1016,6 +1016,9 @@ S15](http://msu.euramet.org/si_broader_scope_2015/SRTs/SRT-s15.pdf). |
|
|
|
|
|
# Quotes
|
|
|
|
|
|
_We’re working on an End Node and have successfully completed the calibration procedure between one End Node designated the “Calibrator” and another End Node designated the “Slave”. <...>
|
|
|
These are working very well with extremely small <50ps skew between the “Calibrator” & “Slave” after calibration with both short (2m) and very long (10km) fibres. We’re very impressed!_, UK, 21/4/21
|
|
|
|
|
|
_I wanted to thank you for all of the tremendous information you provided the <...> folks! That was amazing and I’m sure you helped shave perhaps a year in the time they will need to start getting good data. THANK YOU._, USA, 22/3/21
|
|
|
|
|
|
_This project is really amazing by the amount of work and the quality. And thank for every people helping me to understand the WR structure._, France, 15/6/20
|
... | ... | |