... | ... | @@ -359,17 +359,17 @@ |
|
|
- Plan to use White Rabbit in order to serve a common timestamps
|
|
|
for the whole facility - except for the lasers, which need a
|
|
|
femtosecond level synchronization.
|
|
|
- [ELI: Electronic Timing System (ETS) at Facility
|
|
|
Level](http://www.mrf.fi/dmdocuments/TIMING_WORKSHOP/02-PavelBastl/ELI-BL-4442-PRE-00000116-B.ppt)
|
|
|
- [Synchronization issues at
|
|
|
ELI-ALPS](http://www.eli-alps.hu/sites/default/files/tangows/20150225-1100-ELI-ALPS-Synchronization-ImreKiss.pdf),
|
|
|
I.Kiss, 25 February, 2015, SZEGED
|
|
|
- [ELI-BEAMS](http://www.eli-beams.eu/), Czech Republic
|
|
|
- evaluate WR as a potential facility level electronic timing
|
|
|
system.
|
|
|
- have 2 switches, 2 SPEC cards with DIO and Fine Delay FMCs to do
|
|
|
jitter measurements (Bastl, Apr.2015)
|
|
|
- interested in Micro TCA platform for control system
|
|
|
- [Synchronization issues at
|
|
|
ELI-ALPS](http://www.eli-alps.hu/sites/default/files/tangows/20150225-1100-ELI-ALPS-Synchronization-ImreKiss.pdf),
|
|
|
I.Kiss, 25 February, 2015, SZEGED
|
|
|
- [ELI: Electronic Timing System (ETS) at Facility
|
|
|
Level](http://www.mrf.fi/dmdocuments/TIMING_WORKSHOP/02-PavelBastl/ELI-BL-4442-PRE-00000116-B.ppt)
|
|
|
- [ESRF](http://www.esrf.eu), France
|
|
|
- Upgrade program of it's storage ring. First analysis of several
|
|
|
existing systems is done and arrived to the conclusion that, at
|
... | ... | |