... | ... | @@ -118,6 +118,11 @@ |
|
|
- [Timing System
|
|
|
Documents](https://www-acc.gsi.de/wikis/Timing/TimingSystemDocuments)
|
|
|
(papers, technical documents)
|
|
|
- [KM3NET](http://km3net.org/home.php)
|
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
|
|
telescope
|
|
|
- Central Logic Boards that go in the sea will host optical
|
|
|
modules with WR. The WR switch will be inside the Shore-Station.
|
|
|
- LHAASO ([Tsinghua University,
|
|
|
China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
... | ... | @@ -188,9 +193,6 @@ |
|
|
- Target and instrument control
|
|
|
- [Cosylab](http://cosylab.com/) WR timing system test
|
|
|
- [ITER](http://www.iter.org/) timing system (F. Di Maio, Feb 2012)
|
|
|
- [KM3NET](http://km3net.org/home.php)
|
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
|
|
telescope
|
|
|
- [Michigan State University](http://frib.msu.edu/)
|
|
|
- [National Synchrotron Radiation
|
|
|
Laboratory](http://en.nsrl.ustc.edu.cn), University of Science and
|
... | ... | @@ -261,5 +263,5 @@ paper 1158](http://www.ifh.de/~wischnew/talks/cta/icrc2013/icrc2013-1158-final.p |
|
|
|
|
|
-----
|
|
|
|
|
|
6 November 2013
|
|
|
17 December 2013
|
|
|
|