... | @@ -345,15 +345,21 @@ |
... | @@ -345,15 +345,21 @@ |
|
Chinese Academy of Sciences, Beijing, China (Oct 2012)
|
|
Chinese Academy of Sciences, Beijing, China (Oct 2012)
|
|
- Target and instrument control
|
|
- Target and instrument control
|
|
- [Cosylab](http://cosylab.com/) WR timing system test, Slovenia
|
|
- [Cosylab](http://cosylab.com/) WR timing system test, Slovenia
|
|
- [ELI-ALPS](http://www.eli-alps.hu/?q=en)
|
|
- [ELI-ALPS](http://www.eli-alps.hu/?q=en), Hungary
|
|
- laser research facility. Testing ease of use and accuracy. (Feb
|
|
- laser research facility. Testing ease of use and accuracy.
|
|
2015)
|
|
(Kiss, Feb 2015)
|
|
- have 3 switches, a GPS reference and FMC cards.
|
|
- have 3 switches, a GPS reference and FMC cards.
|
|
- Plan to use White Rabbit in order to serve a common timestamps
|
|
- Plan to use White Rabbit in order to serve a common timestamps
|
|
for the whole facility - except for the lasers, which need a
|
|
for the whole facility - except for the lasers, which need a
|
|
femtosecond level synchronization.
|
|
femtosecond level synchronization.
|
|
- [ELI: Electronic Timing System (ETS) at Facility
|
|
- [ELI: Electronic Timing System (ETS) at Facility
|
|
Level](http://www.mrf.fi/dmdocuments/TIMING_WORKSHOP/02-PavelBastl/ELI-BL-4442-PRE-00000116-B.ppt)
|
|
Level](http://www.mrf.fi/dmdocuments/TIMING_WORKSHOP/02-PavelBastl/ELI-BL-4442-PRE-00000116-B.ppt)
|
|
|
|
- [ELI-BEAMS](http://www.eli-beams.eu/), Czech Republic
|
|
|
|
- evaluate WR as a potential facility level electronic timing
|
|
|
|
system.
|
|
|
|
- have 2 switches, 2 SPEC cards with DIO and Fine Delay FMCs to do
|
|
|
|
jitter measurements (Bastl, Apr.2015)
|
|
|
|
- interested in Micro TCA platform for control system
|
|
- [ESRF](http://www.esrf.eu), France
|
|
- [ESRF](http://www.esrf.eu), France
|
|
- Upgrade program of it's storage ring. First analysis of several
|
|
- Upgrade program of it's storage ring. First analysis of several
|
|
existing systems is done and arrived to the conclusion that, at
|
|
existing systems is done and arrived to the conclusion that, at
|
... | @@ -536,5 +542,5 @@ choose White Rabbit as a main time distribution system. (JINR, 7/10/14) |
... | @@ -536,5 +542,5 @@ choose White Rabbit as a main time distribution system. (JINR, 7/10/14) |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
28 April 2015
|
|
29 April 2015
|
|
|
|
|