... | ... | @@ -10,8 +10,8 @@ |
|
|
during core drilling operation at point 1. We took
|
|
|
measurements for several depths 10,20,30,40,50 and 60m.
|
|
|
Seismic sensors connected to spectrum analyzer in UJ16
|
|
|
were perfectly synchronized with the same equipments at
|
|
|
the surface thanks to BE-CO team. (12 Nov. 2015)*
|
|
|
were perfectly synchronized with the same equipment at
|
|
|
the surface. (12 Nov. 2015)*
|
|
|
- General Machine Timing system upgrade in the Antiproton
|
|
|
Decelerator and the ELENA ring (Jean-Claude Bau, January 2013)
|
|
|
- BTrain upgrade: a system to distribute the value of the bending
|
... | ... | @@ -667,6 +667,10 @@ Thanks for the call and the extra information. This (level of |
|
|
commitment) shows the difference between a normal open source project
|
|
|
and a successful one. (EH, The Netherlands, 13/10/2015)
|
|
|
|
|
|
Seismic sensors connected to spectrum analyzer in UJ16 were perfectly
|
|
|
synchronized with the same equipments at the surface thanks to BE-CO
|
|
|
team. (MG, Switzerland, 12/11/2015)
|
|
|
|
|
|
-----
|
|
|
|
|
|
13 November 2015
|
... | ... | |