... | ... | @@ -284,7 +284,7 @@ |
|
|
Chinese Academy of Sciences, Beijing, China (Oct 2012)
|
|
|
- Target and instrument control
|
|
|
- [Cosylab](http://cosylab.com/) WR timing system test, Slovenia
|
|
|
- [ESRF](www.esrf.eu/), France
|
|
|
- [ESRF](http://www.esrf.eu), France
|
|
|
- Upgrade program of it's storage ring. First analysis of several
|
|
|
existing systems is done and arrived to the conclusion that, at
|
|
|
the lights of the architecture and features of the product, it
|
... | ... | |