... | ... | @@ -489,7 +489,7 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
- [ELI: Electronic Timing System (ETS) at Facility
|
|
|
Level](http://www.mrf.fi/dmdocuments/TIMING_WORKSHOP/02-PavelBastl/ELI-BL-4442-PRE-00000116-B.ppt)
|
|
|
- [ESRF](http://www.esrf.eu), France
|
|
|
- Upgrade program of it's storage ring. First analysis of several
|
|
|
- Upgrade program of its storage ring. First analysis of several
|
|
|
existing systems is done and arrived to the conclusion that, at
|
|
|
the lights of the architecture and features of the product, it
|
|
|
is worth to consider White Rabbit as the most attractive
|
... | ... | |