... | @@ -10,20 +10,24 @@ SPEC7. |
... | @@ -10,20 +10,24 @@ SPEC7. |
|
|
|
|
|
#### NIKHEF/JRP, CERN: as high-precision PCIe and stand-alone White Rabbit design
|
|
#### NIKHEF/JRP, CERN: as high-precision PCIe and stand-alone White Rabbit design
|
|
|
|
|
|
\* Aim: the JRP want to disseminate UTC from metrology partners to
|
|
\* Aim: White Rabbit node with target frequency instability of 1e-13
|
|
European research institutes and industry partners with a target
|
|
over 100 sec.
|
|
frequency instability of 1e-13 over 100 sec.
|
|
|
|
|
|
|
|
\* Users will be first: research institutes, metrology institutes.
|
|
\* Users will be first: research institutes and metrology institutes
|
|
Later: high performance users, telecom, ....
|
|
with the aim to disseminate UTC from metrology partners to European
|
|
|
|
research institutes and industry partners. Later: high performance
|
|
|
|
users, telecom, ....
|
|
|
|
|
|
* All users profit from an inherent high performance, relatively
|
|
* All users profit from an inherent high performance, relatively
|
|
cheap, design without the bother of buying an expensive stable external
|
|
cheap (?), design without the bother of buying an expensive stable
|
|
oscillator that the metrology users need.
|
|
external oscillator that the metrology users need.
|
|
|
|
|
|
\* Other possible user for 1 GSPS ADC cards requiring HPC FMC
|
|
\* Other possible user for 1 GSPS ADC cards requiring HPC FMC? Needs to
|
|
|
|
be worked out as fast ADCs nowadays use many serial links and have no
|
|
|
|
parallel readout.
|
|
|
|
|
|
\* Quantity: 100 in 5 years for metrology
|
|
\* Quantity: 100 in 5 years for metrology and research needing high
|
|
|
|
timing performance.
|
|
|
|
|
|
\* Priority
|
|
\* Priority
|
|
|
|
|
... | @@ -32,7 +36,11 @@ oscillator that the metrology users need. |
... | @@ -32,7 +36,11 @@ oscillator that the metrology users need. |
|
|
|
|
|
#### CERN: as SPEC replacement
|
|
#### CERN: as SPEC replacement
|
|
|
|
|
|
\* Aim: smooth replacement of existing SPEC (cheap and simple)
|
|
\* Aim: smooth replacement of existing SPEC that is a cheap FMC carrier
|
|
|
|
with WR support.
|
|
|
|
|
|
|
|
* The existing SPEC with WRS are the two flagship OH projects and the
|
|
|
|
SPEC7 therefore may not fail as project.
|
|
|
|
|
|
\* Used by
|
|
\* Used by
|
|
|
|
|
... | | ... | |