... | ... | @@ -148,91 +148,29 @@ Projects](https://www.ohwr.org/project/fmc-projects). |
|
|
|
|
|
## Status
|
|
|
|
|
|
<table>
|
|
|
<tbody>
|
|
|
<tr class="odd">
|
|
|
<td><strong>Date</strong></td>
|
|
|
<td><b> Event </b></td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>22-06-2010</td>
|
|
|
<td>Start of project. Design is done by an external company, based on the <a href="https://www.ohwr.org/project/fmc-pci-carrier">FMC PCIe Carrier</a>.<br />
|
|
|
Reviewing will be done by CERN.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>29-06-2010</td>
|
|
|
<td>Main features reviewed by JS, PA, MC & EB. Design can start.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>12-07-2010</td>
|
|
|
<td>First schematics published. Ready for review.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>10-09-2010</td>
|
|
|
<td>Review comments integrated. Start of PCB layout.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>05-10-2010</td>
|
|
|
<td>PCB layout review held.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>05-11-2010</td>
|
|
|
<td>Design finished.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>19-01-2011</td>
|
|
|
<td>Three prototypes arrived at CERN.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>18-04-2011</td>
|
|
|
<td>First V1.1 prototypes received, start testing them.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>01-07-2011</td>
|
|
|
<td>Three V2 boards received. One fully tested OK. Two only shortly tested.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>17-07-2011</td>
|
|
|
<td>Order placed for 70 SPEC cards at Seven Solutions.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>23-08-2011</td>
|
|
|
<td>V4 released. Solves a minor mechanical problem with the SFP connector.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>14-03-2012</td>
|
|
|
<td>CERN accepted the 10 preseries boards that were received on 7 March.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>12-06-2012</td>
|
|
|
<td>SPEC boards passed most restrictive EMC tests for industrial and domestic classes. [Test report](https://www.ohwr.org/project/spec/wikis/Documents/EMC-Test-report).</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>13-06-2012</td>
|
|
|
<td>Board available from three commercial producers.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>03-12-2013</td>
|
|
|
<td>Labview Driver available for <a href="https://www.ohwr.org/project/fmc-delay-1ns-8cha/wiki">FMC DEL 1ns 4cha</a> and [FMC TDC 1ns 5cha](https://www.ohwr.org/project/fmc-tdc/wiki).</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>30-03-2015</td>
|
|
|
<td><a href="Fan-design">Fan design</a> released in EDMS (V4-1).</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>02-12-2016</td>
|
|
|
<td>PCIe bridge component (Gennum GN4124) obsolete and not available anymore. A new card should be designed.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>11-01-2018</td>
|
|
|
<td>Start of study of <a href="https://www.ohwr.org/project/spec7/wiki">a new design</a>. Contact <a href="mailto:Erik.van.der.Bij@cern.ch">Erik van der Bij</a> - CERN</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>19-12-2018</td>
|
|
|
<td>Over 2000 SPEC boards produced by industry.</td>
|
|
|
</tr>
|
|
|
</tbody>
|
|
|
</table>
|
|
|
|**Date**|**Event**|
|
|
|
|----|----|
|
|
|
|22-06-2010|Start of project. Design is done by an external company, based on the [FMC PCIe Carrier](https://www.ohwr.org/project/fmc-pci-carrier).
|
|
|
Reviewing will be done by CERN.|
|
|
|
|29-06-2010|Main features reviewed by JS, PA, MC & EB. Design can start.|
|
|
|
|12-07-2010|First schematics published. Ready for review.|
|
|
|
|10-09-2010|Review comments integrated. Start of PCB layout.|
|
|
|
|05-10-2010|PCB layout review held.|
|
|
|
|05-11-2010|Design finished.|
|
|
|
|19-01-2011|Three prototypes arrived at CERN.|
|
|
|
|18-04-2011|First V1.1 prototypes received, start testing them.|
|
|
|
|01-07-2011|Three V2 boards received. One fully tested OK. Two only shortly tested.|
|
|
|
|17-07-2011|Order placed for 70 SPEC cards at Seven Solutions.|
|
|
|
|23-08-2011|V4 released. Solves a minor mechanical problem with the SFP connector.|
|
|
|
|14-03-2012|CERN accepted the 10 preseries boards that were received on 7 March.|
|
|
|
|12-06-2012|SPEC boards passed most restrictive EMC tests for industrial and domestic classes. [Test report](https://www.ohwr.org/project/spec/wikis/Documents/EMC-Test-report).|
|
|
|
|13-06-2012|Board available from three commercial producers.|
|
|
|
|03-12-2013|Labview Driver available for [FMC DEL 1ns 4cha](https://www.ohwr.org/project/fmc-delay-1ns-8cha/wiki) and [FMC TDC 1ns 5cha](https://www.ohwr.org/project/fmc-tdc/wiki).|
|
|
|
|30-03-2015|[Fan design](Fan-design) released in EDMS (V4-1).|
|
|
|
|02-12-2016|PCIe bridge component (Gennum GN4124) obsolete and not available anymore. A new card should be designed.|
|
|
|
|11-01-2018|Start of study of [a new design](https://www.ohwr.org/project/spec7/wiki). Contact [Erik van der Bij](mailto:Erik.van.der.Bij@cern.ch) - CERN|
|
|
|
|19-12-2018|Over 2000 SPEC boards produced by industry.|
|
|
|
|
|
|
|
|
|
[Complete status](complete-status)
|
|
|
|
... | ... | @@ -248,4 +186,4 @@ Erik van der Bij, Matthieu Cattin, Tomasz Wlostowski - 19 December 2018 |
|
|
* [spec_v1.1_top.JPG](/uploads/23a127884e2820d707e58c6119cde69d/spec_v1.1_top.JPG)
|
|
|
* [spec_v1.1_bottom.JPG](/uploads/2240e46a37d3fab76b4e4953ebcc7e9a/spec_v1.1_bottom.JPG)
|
|
|
* [SPEC_top_high_res.jpg](/uploads/036da7721683445ec3e5d5d0a8a855c8/SPEC_top_high_res.jpg)
|
|
|
* [SPEC_bottom_high_res.jpg](/uploads/0e72fd9272d29cd6e0e67de39924cb78/SPEC_bottom_high_res.jpg) |
|
|
\ No newline at end of file |
|
|
* [SPEC_bottom_high_res.jpg](/uploads/0e72fd9272d29cd6e0e67de39924cb78/SPEC_bottom_high_res.jpg) |