WP6 Hardware Testing
Description
The work package 6 includes
- development of the Production Test Suite for the masterFIP FMC
- automated Calibration Suite, if needed
The deliverables are
- masterFIP PTS
- masterFIP Calibration
The estimated duration is
- Eight manweeks
Outcome
E.Gousiou, July 2014