... | ... | @@ -34,7 +34,7 @@ |
|
|
|03-09-2010|Frequency response of the anti-aliasing filter will be verified and possibly corrected. Needs development of software that shows frequency response.|
|
|
|
|07-09-2010|Both I2C buses are working. Accessing memory, setting the sampling frequency and making temperature measurements are now possible.|
|
|
|
|08-09-2010|Issue with linearity in the 30-90 kHz region caused by offset compensation circuit being investigated.|
|
|
|
|20-09-2010|The schematic has been updated. All the differences for the second version are given here :[PDF](https://www.ohwr.org/project/fmc-adc-100m14b4cha/uploads/708190067665268ac6ef5356ea116860/FmcAdc100m14b4cha_v1_changes.pdf)|
|
|
|
|20-09-2010|The schematic has been updated. All the differences for the second version are given here :[PDF](https://ohwr.org/project/fmc-adc-100m14b4cha/uploads/708190067665268ac6ef5356ea116860/FmcAdc100m14b4cha_v1_changes.pdf)|
|
|
|
|29-09-2010|Updates to PCB made (EDA-02063-V2). Ten boards ordered. Designer left CERN.|
|
|
|
|22-10-2010|Found inconsistencies in BOM. Requires modifications to schematics and production files.|
|
|
|
|08-12-2010|Production of ten boards of V2 will arrive before 17 December. Update 16-12-2010: will become 7 January.|
|
... | ... | |