... | @@ -96,7 +96,7 @@ The Production Test defines a protocol for the following procedures: |
... | @@ -96,7 +96,7 @@ The Production Test defines a protocol for the following procedures: |
|
|
|
|
|
### Production Test Suite (PTS)
|
|
### Production Test Suite (PTS)
|
|
|
|
|
|
- (link to PTS program written in 2017)
|
|
- [WR Switch PTS sources and documentation](wrs-pts)
|
|
|
|
|
|
The PTS procedure needs specific, modified, loopback SFPs to be inserted
|
|
The PTS procedure needs specific, modified, loopback SFPs to be inserted
|
|
in the switch.
|
|
in the switch.
|
... | | ... | |