|3| Proposal of WRS-4 main board architecture | Seven Solutions | Competed |
|
|
|3| Proposal of WRS-4 main board architecture | Seven Solutions | Competed |
|
|
|4| Verification of 1Gb and 10Gb transceiver | CERN | Ongoing |
|
|
|4| Verification of 1Gb and 10Gb transceiver | CERN | Ongoing |
|
|
|5| Schematics design | Seven Solutions | Starts July 2020 |
|
|
|5| Schematics design | Seven Solutions | Starts July 2020 |
|
|
|5.1| [Clocking FMC design](https://ohwr.org/project/wr-switch-hw-v4/wikis/Clocking-FMC) (schematics, layout) |Seven Solutions | ongoing|
|
|
|5.1| [Clocking FMC design](https://ohwr.org/project/wr-switch-hw-v4/wikis/Clocking-FMC) (schematics, layout, production) |Seven Solutions | done|
|
|
|6| PCB layout design (DEM) | CERN | |
|
|
|6| PCB layout design (DEM) | CERN | |
|
|
|7| Enclosure design | Seven Solutions | Starts Sept 2020 |
|
|
|7| Enclosure design | Seven Solutions | ongoing |
|
|
|8| Proper WR support for GTH | CERN | |
|
|
|8| Proper WR support for GTH | CERN | |
|
|
|9| Production Test Suite (PTS) | | |
|
|
|9| Production Test Suite (PTS) | | |
|
|
|10| Board Support Package (SW) | | |
|
|
|10| Board Support Package (SW) | | |
|
... | | ... | |