... | ... | @@ -64,10 +64,10 @@ project](https://www.ohwr.org/project/white-rabbit/wiki). |
|
|
|2| Analysis of FPGA resource utilization | Creotech | Competed |
|
|
|
|3| Proposal of WRS-4 main board architecture | Seven Solutions | Competed |
|
|
|
|4| Verification of 1Gb and 10Gb transceiver | CERN | Ongoing |
|
|
|
|5| Schematics design | Seven Solutions | Starts July 2020 |
|
|
|
|5.1| [Clocking FMC design](https://ohwr.org/project/wr-switch-hw-v4/wikis/Clocking-FMC) (schematics, layout, production) |Seven Solutions | done|
|
|
|
|5| Schematics design | Seven Solutions | Competed |
|
|
|
|5.1| [Clocking FMC design](https://ohwr.org/project/wr-switch-hw-v4/wikis/Clocking-FMC) (schematics, layout, production) |Seven Solutions | Competed|
|
|
|
|6| PCB layout design (DEM) | CERN | |
|
|
|
|7| Enclosure design | Seven Solutions | ongoing |
|
|
|
|7| Enclosure design | Seven Solutions | Competed |
|
|
|
|8| Proper WR support for GTH | CERN | |
|
|
|
|9| Production Test Suite (PTS) | | |
|
|
|
|10| Board Support Package (SW) | | |
|
... | ... | @@ -129,6 +129,7 @@ project](https://www.ohwr.org/project/white-rabbit/wiki). |
|
|
|11-04-2021| [Enclosure mechanical review](https://ohwr.org/project/wr-switch-hw-v4/wikis/enclosure) |
|
|
|
|08-10-2021| Presentation at [11th WR Workshop](/project/white-rabbit/wikis/Oct2021Meeting): "Next generation White Rabbit Switch version 4" ([pdf](/project/white-rabbit/wikis/uploads/9b3e06e57f29cc272709055140110ce8/Next_generation_WR_Switch_v4.pdf))|
|
|
|
|26-01-2022| Final and public review of the [WRSv4 Main Board schematics](https://ohwr.org/project/wr-switch-hw-v4/wikis/wrs-v4-main-board-schematics), see [page](https://ohwr.org/project/wr-switch-hw-v4/wikis/wrs-v4-main-board-schematics)|
|
|
|
|08-04-2022| Schematics design [v1.0 ready](https://ohwr.org/project/wr-switch-hw-v4/wikis/wrs-v4-main-board-schematics#design-files)|
|
|
|
|
|
|
|
|
|
|
... | ... | |