... | @@ -4,15 +4,15 @@ |
... | @@ -4,15 +4,15 @@ |
|
packet-based network with sub-ns accuracy. The protocol results from the
|
|
packet-based network with sub-ns accuracy. The protocol results from the
|
|
combination of IEEE1588-2008 (*Precision Time Protocol*, PTP) with two
|
|
combination of IEEE1588-2008 (*Precision Time Protocol*, PTP) with two
|
|
further extensions: automatic precise measurement of the link delay and
|
|
further extensions: automatic precise measurement of the link delay and
|
|
clock syntonization over the physical layer with Synchronous Ethernet
|
|
clock syntonization over the physical layer (similar to SyncE).
|
|
(SyncE).
|
|
|
|
|
|
|
|
White Rabbit evolved into an extension of the Precision Time Protocol
|
|
White Rabbit evolved into an extension of the Precision Time Protocol
|
|
(PTP) and is therefore referred to as WRPTP. WRPTP is fully compatible
|
|
(PTP) and is therefore referred to as WRPTP. WRPTP is fully compatible
|
|
with PTP and is currently defined as a PTP Profile.
|
|
with PTP and is currently defined as a PTP Profile.
|
|
|
|
|
|
The extensions included in WRPTP are now being evaluated by P1588
|
|
The solutions included in WRPTP are now being evaluated by P1588 Working
|
|
Working Group to be included into the PTP standard.
|
|
Group":https://ieee-sa.centraldesktop.com/1588public/ to be included
|
|
|
|
into the PTP standard in its next revision.
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
... | @@ -84,11 +84,13 @@ Option/Profile* |
... | @@ -84,11 +84,13 @@ Option/Profile* |
|
([presentation](https://www.ohwr.org/project/white-rabbit/uploads/442e2b2eca547f69b85c28ff465ce240/WRspecialSession_Maciej_ISPCS2012.pdf),
|
|
([presentation](https://www.ohwr.org/project/white-rabbit/uploads/442e2b2eca547f69b85c28ff465ce240/WRspecialSession_Maciej_ISPCS2012.pdf),
|
|
[document](https://www.ohwr.org/project/white-rabbit/uploads/b0c0f513bf8734bc856f6860fa693201/ISPCS2012-specialSession-final.pdf))
|
|
[document](https://www.ohwr.org/project/white-rabbit/uploads/b0c0f513bf8734bc856f6860fa693201/ISPCS2012-specialSession-final.pdf))
|
|
at the Special Session of
|
|
at the Special Session of
|
|
[ISPCS2012](http://www.ispcs.org/2012/index.html).
|
|
[ISPCS2012](http://www.ispcs.org/2012/index.html). This Special Session
|
|
|
|
showed an interest and need for reasonably broad IEEE1588 revision. The
|
|
The Special Session showed an interest and need for reasonably broad
|
|
first step in revising PTP was the preparation of Project Authorization
|
|
IEEE1588 revision. The first step in revising PTP was the preparation of
|
|
Request (PAR) by a Study Group at the beginning of 2013. The PAR states
|
|
Project Authorization Request by a Study Group at the beginning of 2013.
|
|
that the revised protocol "enhances support for synchronization to
|
|
|
|
better than 1 nanosecond" which reflects the enthusiasm to evaluate
|
|
|
|
White Rabbit extensions.
|
|
|
|
|
|
The revision process of the IEEE1588 Precision Time Protocol (PTP)
|
|
The revision process of the IEEE1588 Precision Time Protocol (PTP)
|
|
standard started in mid-2013. The revision work is done by the [P1588
|
|
standard started in mid-2013. The revision work is done by the [P1588
|
... | | ... | |