... | @@ -124,6 +124,18 @@ |
... | @@ -124,6 +124,18 @@ |
|
objects](http://www.dlr.de/tp/en/desktopdefault.aspx/tabid-7107/11750_read-27635/)
|
|
objects](http://www.dlr.de/tp/en/desktopdefault.aspx/tabid-7107/11750_read-27635/)
|
|
(January 2015)
|
|
(January 2015)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [EISCAT](http://www.eiscat.se/), Sweden
|
|
|
|
- [High Performance Time-based
|
|
|
|
Synchronization](https://www.eiscat3d.se/sites/default/files/WP8_Final_report.pdf#page=56),
|
|
|
|
section 4.1 of EISCAT 3D Preparatory Phase Project - Deliverable
|
|
|
|
8.5: Report on all WP8 activities, Sept.2014
|
|
|
|
- [EISCAT 3D Preparatory Phase Project, Deliverable 8.1: Report on
|
|
|
|
the evaluation of possible synchronization/calibration
|
|
|
|
solutions](https://www.eiscat3d.se/sites/default/files/eiscat3d_deliverable_8.1.pdf),
|
|
|
|
Oct.2012
|
|
|
|
|
|
<!-- end list -->
|
|
<!-- end list -->
|
|
|
|
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en), Spain
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en), Spain
|
... | @@ -410,7 +422,6 @@ |
... | @@ -410,7 +422,6 @@ |
|
## Thinking
|
|
## Thinking
|
|
|
|
|
|
- [ESS Lund](http://ess-scandinavia.eu/), Sweden
|
|
- [ESS Lund](http://ess-scandinavia.eu/), Sweden
|
|
- [EISCAT](http://www.eiscat.se/), Sweden
|
|
|
|
- [SuperB](http://superb.infn.it), Italy
|
|
- [SuperB](http://superb.infn.it), Italy
|
|
- [LNLS](http://www.lnls.br/) (Brazilian Synchrotron Light
|
|
- [LNLS](http://www.lnls.br/) (Brazilian Synchrotron Light
|
|
Laboratory), Brazil
|
|
Laboratory), Brazil
|
... | @@ -475,5 +486,5 @@ choose White Rabbit as a main time distribution system. (JINR, 7/10/14) |
... | @@ -475,5 +486,5 @@ choose White Rabbit as a main time distribution system. (JINR, 7/10/14) |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
22 January 2015
|
|
26 January 2015
|
|
|
|
|