... | @@ -116,7 +116,7 @@ |
... | @@ -116,7 +116,7 @@ |
|
ProtoDUNE-DP](https://indico.cern.ch/event/493989/contributions/2005320/1254851)
|
|
ProtoDUNE-DP](https://indico.cern.ch/event/493989/contributions/2005320/1254851)
|
|
(search for Rabbit or WR)
|
|
(search for Rabbit or WR)
|
|
- [Images of system in 2017 of WA105
|
|
- [Images of system in 2017 of WA105
|
|
subdetector](https://www.ohwr.org/project/white-rabbit/uploads/6b077ec7b68ccfd80bc38bc99c4331e7/Protodune20170509.pdf)
|
|
subdetector](https://ohwr.org/project/white-rabbit/uploads/6b077ec7b68ccfd80bc38bc99c4331e7/Protodune20170509.pdf)
|
|
- “The CERN Beam Instrumentation group, together with
|
|
- “The CERN Beam Instrumentation group, together with
|
|
physicists from the protoDUNE collaboration, is
|
|
physicists from the protoDUNE collaboration, is
|
|
investigating a sub nanosecond time-of-flight system based
|
|
investigating a sub nanosecond time-of-flight system based
|
... | @@ -151,7 +151,7 @@ |
... | @@ -151,7 +151,7 @@ |
|
|
|
|
|
- [CNGS](https://en.wikipedia.org/wikis/CERN_Neutrinos_to_Gran_Sasso) Timing for neutrino measurements (2012-2014), Italy
|
|
- [CNGS](https://en.wikipedia.org/wikis/CERN_Neutrinos_to_Gran_Sasso) Timing for neutrino measurements (2012-2014), Italy
|
|
- *We are running now 9 SPECs for our gamma-ray array prototype.* (November 2013)
|
|
- *We are running now 9 SPECs for our gamma-ray array prototype.* (November 2013)
|
|
- [*Performance results of the first White Rabbit installation for CNGS time transfer*](https://www.ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf) (pdf)
|
|
- [*Performance results of the first White Rabbit installation for CNGS time transfer*](https://ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf) (pdf)
|
|
- [CERN to Gran Sasso Time Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
- [CERN to Gran Sasso Time Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
|
|
|
|
- [CTA - Cherenkov Telescope Array](http://www.cta-observatory.org/), [32
|
|
- [CTA - Cherenkov Telescope Array](http://www.cta-observatory.org/), [32
|
... | @@ -160,7 +160,7 @@ |
... | @@ -160,7 +160,7 @@ |
|
WhiteRabbit](http://www.ifh.de/~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
|
WhiteRabbit](http://www.ifh.de/~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
|
(14 May 2012)
|
|
(14 May 2012)
|
|
- [*The White Rabbit Project Technical introduction and status
|
|
- [*The White Rabbit Project Technical introduction and status
|
|
report*](https://www.ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf)
|
|
report*](https://ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf)
|
|
presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/)
|
|
presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/)
|
|
(2011)
|
|
(2011)
|
|
- [*The ASTRI Mini-Array Software
|
|
- [*The ASTRI Mini-Array Software
|
... | @@ -187,7 +187,7 @@ |
... | @@ -187,7 +187,7 @@ |
|
setting. Uses Xilinx Aurora streaming (no packets) at 1.25Gbps,
|
|
setting. Uses Xilinx Aurora streaming (no packets) at 1.25Gbps,
|
|
latency 0.5us.
|
|
latency 0.5us.
|
|
- [Piece by piece: Real-Time Protection
|
|
- [Piece by piece: Real-Time Protection
|
|
System](https://www.ohwr.org/project/white-rabbit/uploads/af02fbf4b9686206187751817925ceca/mastwire10.pdf),
|
|
System](https://ohwr.org/project/white-rabbit/uploads/af02fbf4b9686206187751817925ceca/mastwire10.pdf),
|
|
MASTwire magazine, Page 2
|
|
MASTwire magazine, Page 2
|
|
|
|
|
|
<!-- end list -->
|
|
<!-- end list -->
|
... | @@ -200,7 +200,7 @@ |
... | @@ -200,7 +200,7 @@ |
|
- [Array Time Synchronization - First Tests with
|
|
- [Array Time Synchronization - First Tests with
|
|
WhiteRabbit](http://www.ifh.de/~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
|
WhiteRabbit](http://www.ifh.de/~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
|
- [First Results from the HiSCORE/Siberia WR-setup; plans for
|
|
- [First Results from the HiSCORE/Siberia WR-setup; plans for
|
|
CTA](https://www.ohwr.org/project/white-rabbit/uploads/e29dee4b4458916fd593b55c875e2585/Martin-HiScore.pdf)
|
|
CTA](https://ohwr.org/project/white-rabbit/uploads/e29dee4b4458916fd593b55c875e2585/Martin-HiScore.pdf)
|
|
slideshow, Martin Brückner (Nov.2011)
|
|
slideshow, Martin Brückner (Nov.2011)
|
|
- [A White Rabbit setup for sub-nsec synchronization,
|
|
- [A White Rabbit setup for sub-nsec synchronization,
|
|
timestamping and time calibration in large scale
|
|
timestamping and time calibration in large scale
|
... | @@ -250,7 +250,7 @@ |
... | @@ -250,7 +250,7 @@ |
|
- [High Precision Time - White Rabbit - Pilot](https://www.eurexchange.com/exchange-en/resources/initiatives/technical-changes/high-precision-time-white-rabbit-pilot)
|
|
- [High Precision Time - White Rabbit - Pilot](https://www.eurexchange.com/exchange-en/resources/initiatives/technical-changes/high-precision-time-white-rabbit-pilot)
|
|
(July 2018)
|
|
(July 2018)
|
|
- [White Rabbit in Financial
|
|
- [White Rabbit in Financial
|
|
Markets](https://www.ohwr.org/project/white-rabbit/uploads/420142f7965b7b2f6a87582bb2b877b7/wr-in-finance-20181006.pdf),
|
|
Markets](https://ohwr.org/project/white-rabbit/uploads/420142f7965b7b2f6a87582bb2b877b7/wr-in-finance-20181006.pdf),
|
|
presented at [10th WR Workshop](/oct2018meeting) (Oct.2018)
|
|
presented at [10th WR Workshop](/oct2018meeting) (Oct.2018)
|
|
- *White Rabbit and Beyond*, presented at [STAC summit - High
|
|
- *White Rabbit and Beyond*, presented at [STAC summit - High
|
|
Technology in Finance](https://stacresearch.com/fall2018LON)
|
|
Technology in Finance](https://stacresearch.com/fall2018LON)
|
... | @@ -508,7 +508,7 @@ |
... | @@ -508,7 +508,7 @@ |
|
- 7Solutions](http://indico.cern.ch/getFile.py/access?contribId=6&resId=1&materialId=slides&confId=283476)
|
|
- 7Solutions](http://indico.cern.ch/getFile.py/access?contribId=6&resId=1&materialId=slides&confId=283476)
|
|
(Dec.2013)
|
|
(Dec.2013)
|
|
- [White
|
|
- [White
|
|
RabbitandKM3NeT](https://www.ohwr.org/project/white-rabbit/uploads/635abe92104c2b25d05615c80e730b51/121128_WR_Workshop_7_KM3NeT.pdf)
|
|
RabbitandKM3NeT](https://ohwr.org/project/white-rabbit/uploads/635abe92104c2b25d05615c80e730b51/121128_WR_Workshop_7_KM3NeT.pdf)
|
|
presented at the [Seventh White Rabbit
|
|
presented at the [Seventh White Rabbit
|
|
Workshop](https://www.ohwr.org/project/white-rabbit/wikis/Nov2012Meeting),
|
|
Workshop](https://www.ohwr.org/project/white-rabbit/wikis/Nov2012Meeting),
|
|
Madrid (Spain), 27-28 November 2012
|
|
Madrid (Spain), 27-28 November 2012
|
... | @@ -584,7 +584,7 @@ |
... | @@ -584,7 +584,7 @@ |
|
- Goal 2: time dissemination to civil society. Plans to deploy at
|
|
- Goal 2: time dissemination to civil society. Plans to deploy at
|
|
a national scale
|
|
a national scale
|
|
- [White Rabbit to disseminate time on an active telecom
|
|
- [White Rabbit to disseminate time on an active telecom
|
|
network?](https://www.ohwr.org/project/white-rabbit/uploads/7077824a45dcee9c550ae44e159e7a79/5_WR4TFdisseminationNational-PEPottie.pdf)
|
|
network?](https://ohwr.org/project/white-rabbit/uploads/7077824a45dcee9c550ae44e159e7a79/5_WR4TFdisseminationNational-PEPottie.pdf)
|
|
(March 2016)
|
|
(March 2016)
|
|
- [*Time and frequency transfer over a 500 km cascaded White
|
|
- [*Time and frequency transfer over a 500 km cascaded White
|
|
Rabbit network*](http://ieeexplore.ieee.org/document/8088808/)
|
|
Rabbit network*](http://ieeexplore.ieee.org/document/8088808/)
|
... | @@ -601,7 +601,7 @@ |
... | @@ -601,7 +601,7 @@ |
|
- [White Rabbit at MIKES](mikes) OHR wiki page
|
|
- [White Rabbit at MIKES](mikes) OHR wiki page
|
|
- [Evaluating WR for comparison and synchronization of
|
|
- [Evaluating WR for comparison and synchronization of
|
|
geographically distant atomic
|
|
geographically distant atomic
|
|
clocks](https://www.ohwr.org/project/white-rabbit/uploads/c6b0314e91a7ce93ad556ee7afaeaa47/MIKES-CSC_WR_time_link.pdf)
|
|
clocks](https://ohwr.org/project/white-rabbit/uploads/c6b0314e91a7ce93ad556ee7afaeaa47/MIKES-CSC_WR_time_link.pdf)
|
|
- 1000 km (thousand kilometer) link up and running\! (12/8/2013)
|
|
- 1000 km (thousand kilometer) link up and running\! (12/8/2013)
|
|
- [SIB02 JRP-Publishable Summary
|
|
- [SIB02 JRP-Publishable Summary
|
|
Nov 2013](http://www.ptb.de/emrp/neatft_project.html?&no_cache=1&cid=2519&did=8341&sechash=6bf28c69)
|
|
Nov 2013](http://www.ptb.de/emrp/neatft_project.html?&no_cache=1&cid=2519&did=8341&sechash=6bf28c69)
|
... | @@ -669,7 +669,7 @@ |
... | @@ -669,7 +669,7 @@ |
|
- Partners
|
|
- Partners
|
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3))
|
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3))
|
|
- [Slides of
|
|
- [Slides of
|
|
plans](https://www.ohwr.org/project/white-rabbit/uploads/40120120076ce7618e8a88d410350e95/130715_VSL.pdf).
|
|
plans](https://ohwr.org/project/white-rabbit/uploads/40120120076ce7618e8a88d410350e95/130715_VSL.pdf).
|
|
5 km link working (14/8/2013)
|
|
5 km link working (14/8/2013)
|
|
- 120 km link from Delft to Amsterdam working. Two WR
|
|
- 120 km link from Delft to Amsterdam working. Two WR
|
|
links, both using *dark channels* at 1470nm and 1490nm
|
|
links, both using *dark channels* at 1470nm and 1490nm
|
... | @@ -913,7 +913,7 @@ S15](http://msu.euramet.org/si_broader_scope_2015/SRTs/SRT-s15.pdf). |
... | @@ -913,7 +913,7 @@ S15](http://msu.euramet.org/si_broader_scope_2015/SRTs/SRT-s15.pdf). |
|
distribution service via optical fibre over the Madrid
|
|
distribution service via optical fibre over the Madrid
|
|
region](https://navisp.esa.int/project/details/36/show)
|
|
region](https://navisp.esa.int/project/details/36/show)
|
|
- [*TOWR: A Time Service over White Rabbit for the Region of
|
|
- [*TOWR: A Time Service over White Rabbit for the Region of
|
|
Madrid*](https://www.ohwr.org/project/white-rabbit/uploads/82947a5cb9f812e26dcdf201be104d0d/TOWR_prez_WR-workshop-2018.pdf),
|
|
Madrid*](https://ohwr.org/project/white-rabbit/uploads/82947a5cb9f812e26dcdf201be104d0d/TOWR_prez_WR-workshop-2018.pdf),
|
|
Presented at [WR workshop 2018](/oct2018meeting)
|
|
Presented at [WR workshop 2018](/oct2018meeting)
|
|
|
|
|
|
<!-- end list -->
|
|
<!-- end list -->
|
... | | ... | |