... | ... | @@ -4,8 +4,23 @@ |
|
|
|
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
|
- Upgrade of CERN Timing and Control systems
|
|
|
- Electrical Power Converter system (J-L. Gomez Costa, TE-EPC,
|
|
|
June 2013)
|
|
|
- POPS: Power converter for PS Ring Main Dipole
|
|
|
- Receive the measurement Bfield from Btrain: POPS
|
|
|
Converter receives a Field Reference and it will use the
|
|
|
measured Bfield as a correction on the Converter
|
|
|
regulation loop.
|
|
|
- Send PS Ring Main Dipole current (Im) to Btrain and PFW
|
|
|
devices: We take advantage of the White-Rabbit
|
|
|
infrastructure to distribute this signal so no extra
|
|
|
cabling is needed. This transmission is done @ 1KHz.
|
|
|
- PFW: Phase Loop Windings Converters for PS Ring Main Dipoles
|
|
|
- Receive the measurement Bdot from Btrain and PS Ring
|
|
|
Main Dipole Current (Im) from POPS:PFW Converters uses
|
|
|
those signals to compensate for the effect of the Main
|
|
|
Dipole current on the PFW windings.
|
|
|
- CNGS Timing for neutrino measurements (May 2012)
|
|
|
- Electrical Power Converters group (TE-EPC, June 2013)
|
|
|
- [*Performance results of the first White Rabbit installation
|
|
|
for CNGS time
|
|
|
transfer*](https://www.ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf)
|
... | ... | |