... | ... | @@ -4,8 +4,9 @@ |
|
|
|
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
|
- Upgrade of CERN Timing and Control systems
|
|
|
- Electrical Power Converter system (J-L. Gomez Costa, TE-EPC,
|
|
|
June 2013)
|
|
|
- Electrical Power Converter system (J-L. Gomez Costa,
|
|
|
[TE-EPC](http://cern.ch/te-dep-epc/nw_general/welcome.stm), June
|
|
|
2013)
|
|
|
- POPS: Power converter for PS Ring Main Dipole
|
|
|
- Receive the measurement Bfield from Btrain: POPS
|
|
|
Converter receives a Field Reference and it will use the
|
... | ... | @@ -20,6 +21,9 @@ |
|
|
Main Dipole Current (Im) from POPS:PFW Converters uses
|
|
|
those signals to compensate for the effect of the Main
|
|
|
Dipole current on the PFW windings.
|
|
|
- Radio-Frequency Group, Feedbacks and beam control (M.Sundal,
|
|
|
[BE-RF-FB](https://espace.cern.ch/be-dep/RF/FB/default.aspxm),
|
|
|
June 2013)
|
|
|
- CNGS Timing for neutrino measurements (May 2012)
|
|
|
- [*Performance results of the first White Rabbit installation
|
|
|
for CNGS time
|
... | ... | |