... | @@ -32,6 +32,15 @@ |
... | @@ -32,6 +32,15 @@ |
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
|
FMC card.
|
|
FMC card.
|
|
|
|
- The LHAASO project has passed the technical review on the WR
|
|
|
|
timing distribution plan consists of *4 layers of WR switches
|
|
|
|
(461 in total) covering 6880 nodes* of KM2A. It would be able to
|
|
|
|
provide both a timing
|
|
|
|
link and synchronous data acquisition network to every detector
|
|
|
|
front-end for a trigger-less scheme. For 2013 it is planned to
|
|
|
|
deploy a small portion of array (40-50 nodes) in Tibet using
|
|
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
|
|
(Sept.2012)
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- [SuperGPS through optical
|
|
- [SuperGPS through optical
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
... | @@ -76,5 +85,5 @@ |
... | @@ -76,5 +85,5 @@ |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
26 September 2012
|
|
29 September 2012
|
|
|
|
|