... | @@ -16,6 +16,10 @@ |
... | @@ -16,6 +16,10 @@ |
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
Observation) project Deploying 10,000 detectors over 1 square km
|
|
Observation) project Deploying 10,000 detectors over 1 square km
|
|
at Tibet.
|
|
at Tibet.
|
|
|
|
- Abstract [*Sub-nanosecond Timing System Design and
|
|
|
|
Development for LHAASO
|
|
|
|
Project*](http://www.esrf.eu/icalepcs2011/html/auth0335.htm),
|
|
|
|
[ICALEPCS 2011 conference](http://icalepcs2011.esrf.eu)
|
|
|
|
|
|
## Thinking
|
|
## Thinking
|
|
|
|
|
... | | ... | |