... | @@ -79,6 +79,13 @@ |
... | @@ -79,6 +79,13 @@ |
|
- [*The White Rabbit Project Technical introduction and status
|
|
- [*The White Rabbit Project Technical introduction and status
|
|
report*](https://www.ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf)
|
|
report*](https://www.ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf)
|
|
presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/)
|
|
presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/)
|
|
|
|
- China Spallation Neutron Source Institute of High Energy Physics
|
|
|
|
Chinese Academy of Sciences, Beijing (Oct 2012)
|
|
|
|
- Target and instrument control
|
|
|
|
- China Synchrotron Radiation Laboratory,University of Science and
|
|
|
|
Technology of China (Oct 2012)
|
|
|
|
- upgrade of the timing and control systems of accelerators. Will
|
|
|
|
build demo to assess the feasibility.
|
|
- [ITER](http://www.iter.org/) timing system (F. Di Maio, Feb 2012)
|
|
- [ITER](http://www.iter.org/) timing system (F. Di Maio, Feb 2012)
|
|
- [KM3NET](http://km3net.org/home.php)
|
|
- [KM3NET](http://km3net.org/home.php)
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
... | | ... | |