... | @@ -3,7 +3,12 @@ |
... | @@ -3,7 +3,12 @@ |
|
## Committed
|
|
## Committed
|
|
|
|
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
|
|
- Upgrade of CERN Timing and Control systems
|
|
- CNGS Timing for neutrino measurements (May 2012)
|
|
- CNGS Timing for neutrino measurements (May 2012)
|
|
|
|
- [*Performance results of the first White Rabbit installation for
|
|
|
|
CNGS time
|
|
|
|
transfer*](https://www.ohwr.org/project/white-rabbit/repository/entry/trunk/documentation/publications/ISPCS2012/WhiteRabbit.pdf)
|
|
|
|
(pdf)
|
|
- [CERN to Gran Sasso Time
|
|
- [CERN to Gran Sasso Time
|
|
Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
- [DESY](http://tunka-hrjrg.desy.de)
|
|
- [DESY](http://tunka-hrjrg.desy.de)
|
... | @@ -15,6 +20,18 @@ |
... | @@ -15,6 +20,18 @@ |
|
GmbH](https://www.gsi.de)
|
|
GmbH](https://www.gsi.de)
|
|
- [General Machine Timing System at
|
|
- [General Machine Timing System at
|
|
FAIR](https://www-acc.gsi.de/wikis/Timing/WebHome)
|
|
FAIR](https://www-acc.gsi.de/wikis/Timing/WebHome)
|
|
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en)
|
|
|
|
- After an extensive study, White Rabbit has been chosen as the
|
|
|
|
most promising option for the synchronization network at ESS
|
|
|
|
Bilbao, a light ion linear accelerator. Therefore, first
|
|
|
|
[SPEC](https://www.ohwr.org/project/spec/wiki) to SPEC tests
|
|
|
|
have been performed. Now, with a White Rabbit switch a new set
|
|
|
|
up will be tested to provide synchronization signals for ESS
|
|
|
|
Bilbao's hydrogen positive ion source (ISHP) in the near future.
|
|
|
|
For 2013 ESS Bilbao is willing to test PXI SPECs
|
|
|
|
([SPEXI](https://www.ohwr.org/project/spexi/wiki)) which is the
|
|
|
|
most suitable platform for the integration of White Rabbit into
|
|
|
|
ESS Bilbao's general control system. (Oct.2012)
|
|
- LHAASO
|
|
- LHAASO
|
|
- [A Future Project at Tibet: The Large High Altitude Air Shower
|
|
- [A Future Project at Tibet: The Large High Altitude Air Shower
|
|
Observatory
|
|
Observatory
|
... | @@ -61,7 +78,6 @@ |
... | @@ -61,7 +78,6 @@ |
|
- [*The White Rabbit Project Technical introduction and status
|
|
- [*The White Rabbit Project Technical introduction and status
|
|
report*](https://www.ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf)
|
|
report*](https://www.ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf)
|
|
presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/)
|
|
presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/)
|
|
- [ESS Bilbao](http://www.essbilbao.com/)
|
|
|
|
- [ITER](http://www.iter.org/) timing system (F. Di Maio, Feb 2012)
|
|
- [ITER](http://www.iter.org/) timing system (F. Di Maio, Feb 2012)
|
|
- [KM3NET](http://km3net.org/home.php)
|
|
- [KM3NET](http://km3net.org/home.php)
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
... | @@ -86,5 +102,5 @@ |
... | @@ -86,5 +102,5 @@ |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
1 October 2012
|
|
2 October 2012
|
|
|
|
|