... | ... | @@ -89,6 +89,15 @@ |
|
|
(search for Rabbit or WR)
|
|
|
- [Images of system in 2017 of WA105
|
|
|
subdetector](https://www.ohwr.org/project/white-rabbit/uploads/6b077ec7b68ccfd80bc38bc99c4331e7/Protodune20170509.pdf)
|
|
|
- “The CERN Beam Instrumentation group, together with
|
|
|
physicists from the protoDUNE collaboration, is
|
|
|
investigating a sub nanosecond time-of-flight system based
|
|
|
on scintillating fibres read-out with fast PMT. The SVEC
|
|
|
FMC-TDC has been chosen as it has the required timing
|
|
|
performance and it integrates White Rabbit, which is
|
|
|
required to timestamp the events in a common time reference
|
|
|
shared by the beam instrumentation and the protoDUNE
|
|
|
detectors.” (Feb 2017, I.Ortega)
|
|
|
- SM-18: Magnetic field measurement and distribution of the data
|
|
|
in real-time (M. Charrondiere, TE-MSC, April 2016)
|
|
|
- [SPS RF distribution over White
|
... | ... | @@ -880,5 +889,5 @@ Experience is excellent (\!\!). (DESY, 28/10/13) |
|
|
|
|
|
-----
|
|
|
|
|
|
19 July 2017
|
|
|
20 July 2017
|
|
|
|