|
# [White Rabbit](/) -\> Users of White Rabbit Technology
|
|
# [White Rabbit](/) -\> Users of White Rabbit Technology
|
|
|
|
|
|
|
|
---
|
|
-----
|
|
|
|
|
|
|
|
## Committed
|
|
## Committed
|
|
|
|
|
|
- [Arkus, Japan](http://www.arkus.co.jp) (Japanese only)
|
|
- [Arkus, Japan](http://www.arkus.co.jp) (Japanese only)
|
|
- Fixed latency trigger distribution system (April 2014, F.de
|
|
- Fixed latency trigger distribution system (April 2014, F.de Guzman)
|
|
Guzman)
|
|
- [Baikal Deep Underwater Neutrino Telescope - BDUNT](https://en.wikipedia.org/wikis/Baikal_Deep_Underwater_Neutrino_Telescope), Russia
|
|
|
|
- Runs since March 2018 on WR at 1000 m water depth in lake Baikal/Siberia. It uses the same SPEC-TDC that DESY developed for HiSCORE/Siberia. (Oct.2018)
|
|
<!-- end list -->
|
|
- [UC Berkeley](https://www.berkeley.edu/), [UC San Diego](https://www.ucsd.edu/), USA
|
|
|
|
- [PANOSETI](https://oirlab.ucsd.edu/PANOSETI.html), SETI (search for extraterrestrial intelligence) project (November 2018)
|
|
- [Baikal Deep Underwater Neutrino Telescope -
|
|
- A telescope which will be looking for nanosecond-level coincidence between optical events in a system of several hundred nodes; will use White Rabbit technology to distribute precision timing signals throughout the network.
|
|
BDUNT](https://en.wikipedia.org/wikis/Baikal_Deep_Underwater_Neutrino_Telescope),
|
|
- [Panoramic optical and near-infrared SETI instrument: overall specifications and science program](http://export.arxiv.org/pdf/1808.05772)
|
|
Russia
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
- Runs since March 2018 on WR at 1000 m water depth in lake
|
|
- ATLAS
|
|
Baikal/Siberia. It uses the same SPEC-TDC that DESY developed
|
|
- Seismic measurements (M.Guinchard, Nov-Dec.2015)
|
|
for HiSCORE/Siberia. (Oct.2018)
|
|
- _As it was plan in the best schedule, the first set of vibration measurements was performed this afternoon during core drilling operation at point 1. We took measurements for several depths 10,20,30,40,50 and 60m. Seismic sensors connected to spectrum analyzer in UJ16 were perfectly synchronized with the same equipment at the surface. (12 Nov. 2015)_
|
|
|
|
- General Machine Timing system upgrade in the Antiproton Decelerator and the ELENA ring (Jean-Claude Bau, January 2013)
|
|
<!-- end list -->
|
|
- Beam Instrumentation
|
|
|
|
- Time-stamp events based on a reference clock that will be received by WR. ([BE-BI](https://be-dep-bi.web.cern.ch/), April 2017)
|
|
- [UC Berkeley](https://www.berkeley.edu/), [UC San
|
|
- BTrain upgrade: a system to distribute the value of the bending magnetic field in synchrotrons in real-time
|
|
Diego](https://www.ucsd.edu/), USA
|
|
- [Reference WR-BTrain Node designs](https://gitlab.cern.ch/BTrain-TEAM/Btrain-over-WhiteRabbit/wikis/home) on CERN gitlab and [information about the upgrade](https://wikis.cern.ch/display/HT/Btrain+over+White+Rabbit) on CERN CO wikis (CERN access only)
|
|
- [PANOSETI](https://oirlab.ucsd.edu/PANOSETI.html), SETI (search
|
|
- Magnetic field measurement and distribution of the data in real-time (M. Buzio, [TE-MSC](https://te-dep.web.cern.ch/te-dep/structure/MSC/MM/index.html), January 2013)
|
|
for extraterrestrial intelligence) project (November 2018)
|
|
- Successful validation of B-field distribution via White Rabbit (March 2014)
|
|
- A telescope which will be looking for nanosecond-level
|
|
- Electrical Power Converter system (J-L. Gomez Costa, [TE-EPC](http://cern.ch/te-dep-epc/nw_general/welcome.stm), June 2013. Tested succesfully May 2014)
|
|
coincidence between optical events in a system of several
|
|
- POPS: Power converter for PS Ring Main Dipole
|
|
hundred nodes; will use White Rabbit technology to distribute
|
|
- Receive the measurement Bfield from Btrain: POPS Converter receives a Field Reference and it will use the measured Bfield as a correction on the Converter regulation loop.
|
|
precision timing signals throughout the network.
|
|
- Send PS Ring Main Dipole current (Im) to Btrain and PFW devices: We take advantage of the White-Rabbit infrastructure to distribute this signal so no extra cabling is needed. This transmission is done @ 1KHz.
|
|
- [Panoramic optical and near-infrared SETI instrument: overall
|
|
- PFW: Phase Loop Windings Converters for PS Ring Main Dipoles
|
|
specifications and science
|
|
- Receive the measurement Bdot from Btrain and PS Ring Main Dipole Current (Im) from POPS:PFW Converters uses those signals to compensate for the effect of the Main Dipole current on the PFW windings.
|
|
program](http://export.arxiv.org/pdf/1808.05772)
|
|
- Radio-Frequency Group, Feedbacks and beam control (M.Sundal, [BE-RF-FB](https://espace.cern.ch/be-dep/RF/FB/default.aspxm), June 2013)
|
|
|
|
- Module in the PS that will receive information about the B-train over White Rabbit and calculate the RF frequency. Part of the upgrade of the RF program in the PS. Prototyping with [SPEC](https://www.ohwr.org/spec/wiki) and [WR Starting Kit](https://www.ohwr.org/project/wr-starting-kit/wiki). Final system will use the [SVEC](https://www.ohwr.org/project/svec/wiki).
|
|
<!-- end list -->
|
|
- Radio-Frequency Group, Servos and Control interface (Simonin, [BE-RF-CS](https://espace.cern.ch/be-dep/RF/CS/default.aspx), Apr 2015)
|
|
|
|
- WR used for B-train reception to work on [VXS Switch board.](https://www.ohwr.org/project/vxs-dsp-fmc-carrier/wiki). To be used in ELENA by end 2015.
|
|
- [CERN](http://public.web.cern.ch/public/)
|
|
- Beam Instrumentation group (P.Odier 10/2015)
|
|
- ATLAS
|
|
- Normalising Beta of the DCCT transformers
|
|
- Seismic measurements (M.Guinchard, Nov-Dec.2015)
|
|
- [LHC Instabilities Trigger Distribution](https://www.ohwr.org/project/wr-node-core/wikis/LHC-Instability-Trigger)
|
|
- *As it was plan in the best schedule, the first set of
|
|
- [_Instability diagnostics_](https://indico.cern.ch/event/434129/contributions/1917184/1269938), T. Levens et al.
|
|
vibration measurements was performed this afternoon
|
|
- ProtoDUNE - [CERN Prototype of DUNE](https://dune.bnl.gov/wikis/CERN_Prototype)
|
|
during core drilling operation at point 1. We took
|
|
- WA105 subdetector
|
|
measurements for several depths 10,20,30,40,50 and 60m.
|
|
- Global uTCA DAQ architecture integrated with White Rabbit Time and Trigger distribution network + White Rabbit slaves nodes in uTCA crates
|
|
Seismic sensors connected to spectrum analyzer in UJ16
|
|
- [Opportunities with ProtoDUNE-DP](https://indico.cern.ch/event/493989/contributions/2005320/1254851) (search for Rabbit or WR)
|
|
were perfectly synchronized with the same equipment at
|
|
- [Images of system in 2017 of WA105 subdetector](https://ohwr.org/project/white-rabbit/uploads/6b077ec7b68ccfd80bc38bc99c4331e7/Protodune20170509.pdf)
|
|
the surface. (12 Nov. 2015)*
|
|
- “The CERN Beam Instrumentation group, together with physicists from the protoDUNE collaboration, is investigating a sub nanosecond time-of-flight system based on scintillating fibres read-out with fast PMT. The SVEC FMC-TDC has been chosen as it has the required timing performance and it integrates White Rabbit, which is required to timestamp the events in a common time reference shared by the beam instrumentation and the protoDUNE detectors.” (Feb 2017, I.Ortega)
|
|
- General Machine Timing system upgrade in the Antiproton
|
|
- SM-18: Magnetic field measurement and distribution of the data in real-time (M. Charrondiere, TE-MSC, April 2016)
|
|
Decelerator and the ELENA ring (Jean-Claude Bau, January 2013)
|
|
- [SPS RF distribution over White Rabbit](https://wikis.cern.ch/display/HT/SPS+RF+distribution+over+White+Rabbit) on CERN CO wikis (CERN access only)
|
|
- Beam Instrumentation
|
|
- [China Spallation Neutron Source Institute of High Energy Physics Chinese Academy of Sciences - CSNS](http://csns.ihep.ac.cn/english/), Beijing, China (Oct 2012, April 2017)
|
|
- Time-stamp events based on a reference clock that will be
|
|
- Timing system of the spectrometer. Target and instrument control
|
|
received by WR. ([BE-BI](https://be-dep-bi.web.cern.ch/),
|
|
- Experimental control of the neutron spectrometer during the construction of the project.
|
|
April 2017)
|
|
- [The time synchronization of CSNS neutron instrument](http://ieeexplore.ieee.org/document/7543087/), Real Time Conference (RT), 2016 IEEE-NPSS, J.Zhuang et al.
|
|
- BTrain upgrade: a system to distribute the value of the bending
|
|
- [CHIRON-IT](http://chiron-it.nl/), The Netherlands
|
|
magnetic field in synchrotrons in real-time
|
|
- Measurement system for high-voltage tests, using [SPEC](https://www.ohwr.org/project/spec/wiki) and modified [ADC cards](https://www.ohwr.org/project/fmc-adc-100m14b4cha/wiki).
|
|
- [Reference WR-BTrain Node
|
|
- 700 measurement nodes will be installed at three independent locations. (M.Emke, Feb.2015)
|
|
designs](https://gitlab.cern.ch/BTrain-TEAM/Btrain-over-WhiteRabbit/wikis/home)
|
|
- [CNGS](https://en.wikipedia.org/wikis/CERN_Neutrinos_to_Gran_Sasso) Timing for neutrino measurements (2012-2014), Italy
|
|
on CERN gitlab and [information about the
|
|
- _We are running now 9 SPECs for our gamma-ray array prototype._ (November 2013)
|
|
upgrade](https://wikis.cern.ch/display/HT/Btrain+over+White+Rabbit)
|
|
- [_Performance results of the first White Rabbit installation for CNGS time transfer_](https://ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf) (pdf)
|
|
on CERN CO wikis (CERN access only)
|
|
- [CERN to Gran Sasso Time Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
- Magnetic field measurement and distribution of the data in
|
|
- [CTA - Cherenkov Telescope Array](http://www.cta-observatory.org/), [32 countries](https://en.wikipedia.org/wikis/Cherenkov_Telescope_Array#cta_consortium_members_and_ctao_shareholders)
|
|
real-time (M. Buzio,
|
|
- [Array Time Synchronization - First Tests with WhiteRabbit](http://www.ifh.de/\~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf) (14 May 2012)
|
|
[TE-MSC](https://te-dep.web.cern.ch/te-dep/structure/MSC/MM/index.html),
|
|
- [_The White Rabbit Project Technical introduction and status report_](https://ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf) presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/) (2011)
|
|
January 2013)
|
|
- [_The ASTRI Mini-Array Software System_](http://media.wix.com/ugd/9aff89_0833faa1994343a3a4e3d77011d5bee8.pdf) (G.Tosti et al, 2013)
|
|
- Successful validation of B-field distribution via White
|
|
- [TiCkS: a flexible White-Rabbit based time-stamping board](http://accelconf.web.cern.ch/AccelConf/icalepcs2017/papers/tupha090.pdf)\
|
|
Rabbit (March 2014)
|
|
_C. Champion et al, CTA Consortium, ICALEPCS 2017_
|
|
- Electrical Power Converter system (J-L. Gomez Costa,
|
|
- [Culham Centre for Fusion Energy](http://www.ccfe.ac.uk/) (G. Naylor, S.Hall, B.Huang, Jan.2013-Apr.2015), UK
|
|
[TE-EPC](http://cern.ch/te-dep-epc/nw_general/welcome.stm),
|
|
- Real-Time Protection System that will prevent the MAST-U machine’s magnetic coils from damage. The White Rabbit collects the signals read from the coils and measure the level of electrical current passing through them during a plasma pulse. If the current gets too high, the Real-Time Protection System automatically kicks in – gradually winding down the power supplies so the pulse can be stopped without harming the machine.
|
|
June 2013. Tested succesfully May 2014)
|
|
- This particular version of the switch has been adapted from one used for data synchronization at CERN, so MAST-U is getting a device with tried-and-tested performance in a ‘big science’ setting. Uses Xilinx Aurora streaming (no packets) at 1.25Gbps, latency 0.5us.
|
|
- POPS: Power converter for PS Ring Main Dipole
|
|
- [Piece by piece: Real-Time Protection System](https://ohwr.org/project/white-rabbit/uploads/af02fbf4b9686206187751817925ceca/mastwire10.pdf), MASTwire magazine, Page 2
|
|
- Receive the measurement Bfield from Btrain: POPS
|
|
- [DESY](http://tunka-hrjrg.desy.de), Germany
|
|
Converter receives a Field Reference and it will use
|
|
- [HiSCORE-EA Gamma-Ray and Cosmic-Ray experiment](http://tunka-hrjrg.desy.de/e98279/index_eng.html) at the Tunka-133 Cherenkov EAS-Array (2012/13). (R. Wischnewski, Feb 2012)
|
|
the measured Bfield as a correction on the Converter
|
|
- [Array Time Synchronization - First Tests with WhiteRabbit](http://www.ifh.de/\~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
|
regulation loop.
|
|
- [First Results from the HiSCORE/Siberia WR-setup; plans for CTA](https://ohwr.org/project/white-rabbit/uploads/e29dee4b4458916fd593b55c875e2585/Martin-HiScore.pdf) slideshow, Martin Brückner (Nov.2011)
|
|
- Send PS Ring Main Dipole current (Im) to Btrain and
|
|
- [A White Rabbit setup for sub-nsec synchronization, timestamping and time calibration in large scale astroparticle physics experiments](http://www.ifh.de/\~wischnew/talks/cta/icrc2013/icrc2013-1146_final.pdf) (July 2013)
|
|
PFW devices: We take advantage of the White-Rabbit
|
|
- _We conclude, that this White Rabbit system is ready to be applied under field conditions in large-scale astroparticle physics experiments - for time synchronization with nanosecond precision between individual detectors, distributed over km-scale._
|
|
infrastructure to distribute this signal so no extra
|
|
- [Results from the WhiteRabbit sub-nsec time synchronization setup at HiSCORE-Tunka](http://www.ifh.de/\~wischnew/talks/cta/icrc2013/icrc2013-1158-final.pdf) (July 2013)
|
|
cabling is needed. This transmission is done @ 1KHz.
|
|
- \_We mention that the White architecture guarantees that the clocks in each WR-node is synchronized with full precision\
|
|
- PFW: Phase Loop Windings Converters for PS Ring Main
|
|
at any time. This is an essential difference compared to most proprietary time-synchronization solutions in experiments,\
|
|
Dipoles
|
|
based on corrections applied offline (or with significant delay).\_
|
|
- Receive the measurement Bdot from Btrain and PS Ring
|
|
- [Status of the HiSCORE experiment](http://www.ifh.de/\~wischnew/talks/cta/icrc2013/icrc2013-1164_final.pdf) (July 2013)
|
|
Main Dipole Current (Im) from POPS:PFW Converters
|
|
- _...we trigger and read out ... with waveform sampling at 1 GHz, and time-synchronization at sub-ns level with a White-Rabbit (WR) based system (time stamping and triggering). Waveform sampling and time-stamping proved to be very stable. The ns-trigger timestamps, obtained from the timing system allow clear Cerenkov air-shower detection._
|
|
uses those signals to compensate for the effect of
|
|
- [_A Time Stamping TDC for SPEC and ZEN Platforms Based on White Rabbit_](http://accelconf.web.cern.ch/AccelConf/icalepcs2017/papers/thpha088.pdf), M.Brückner et al., PSI & DESY, ICALEPCS 2017
|
|
the Main Dipole current on the PFW windings.
|
|
- [Deutsche Börse](http://deutsche-boerse.com/dbg-en/), Germany
|
|
- Radio-Frequency Group, Feedbacks and beam control (M.Sundal,
|
|
- [Ultra-accurate time distribution for Deutsche Börse’s trading network](https://deutsche-boerse.com/dbg-en/products-services/insights-innovation-new-technologies-en/Ultra-accurate-time-distribution-for-Deutsche-B-rse-s-trading-network-246490) (October 2017)
|
|
[BE-RF-FB](https://espace.cern.ch/be-dep/RF/FB/default.aspxm),
|
|
- [When every nanosecond counts](https://deutsche-boerse.com/dbg-en/products-services/insights-innovation-new-technologies-en/When-every-nanosecond-counts--141444) (Jan.2018)
|
|
June 2013)
|
|
- [High Precision Time - White Rabbit - Pilot](https://www.eurexchange.com/exchange-en/resources/initiatives/technical-changes/high-precision-time-white-rabbit-pilot) (July 2018)
|
|
- Module in the PS that will receive information about the
|
|
- [White Rabbit in Financial Markets](https://ohwr.org/project/white-rabbit/uploads/420142f7965b7b2f6a87582bb2b877b7/wr-in-finance-20181006.pdf), presented at [10th WR Workshop](/oct2018meeting) (Oct.2018)
|
|
B-train over White Rabbit and calculate the RF
|
|
- _White Rabbit and Beyond_, presented at [STAC summit - High Technology in Finance](https://stacresearch.com/fall2018LON) (Nov.2018)
|
|
frequency. Part of the upgrade of the RF program in the
|
|
- [DLR](http://www.dlr.de/dlr/en/) (German Aerospace Center, Institute for Technical Physics), Germany
|
|
PS. Prototyping with
|
|
- [Laser ranging to space-debris objects](http://www.dlr.de/tp/en/desktopdefault.aspx/tabid-7107/11750_read-27635/) (January 2015)
|
|
[SPEC](https://www.ohwr.org/spec/wiki) and [WR Starting
|
|
- [EISCAT](http://www.eiscat.se/), Sweden
|
|
Kit](https://www.ohwr.org/project/wr-starting-kit/wiki).
|
|
- [High Performance Time-based Synchronization](https://www.eiscat3d.se/sites/default/files/WP8_Final_report.pdf#page=56), section 4.1 of EISCAT 3D Preparatory Phase Project - Deliverable 8.5: Report on all WP8 activities, Sept.2014
|
|
Final system will use the
|
|
- [EISCAT 3D Preparatory Phase Project, Deliverable 8.1: Report on the evaluation of possible synchronization/calibration solutions](https://www.eiscat3d.se/sites/default/files/eiscat3d_deliverable_8.1.pdf), Oct.2012
|
|
[SVEC](https://www.ohwr.org/project/svec/wiki).
|
|
- [ELI-ALPS](http://www.eli-alps.hu/?q=en), Hungary
|
|
- Radio-Frequency Group, Servos and Control interface
|
|
- laser research facility. Testing ease of use and accuracy. (Kiss, Feb 2015)
|
|
(Simonin,
|
|
- have 3 switches, a GPS reference and FMC cards.
|
|
[BE-RF-CS](https://espace.cern.ch/be-dep/RF/CS/default.aspx),
|
|
- Plan to use White Rabbit in order to serve a common timestamps for the whole facility - except for the lasers, which need a femtosecond level synchronization.
|
|
Apr 2015)
|
|
- [Synchronization issues at ELI-ALPS](http://www.eli-alps.hu/sites/default/files/tangows/20150225-1100-ELI-ALPS-Synchronization-ImreKiss.pdf), I.Kiss, 25 February, 2015, SZEGED
|
|
- WR used for B-train reception to work on [VXS Switch
|
|
- Acquire triggers from the lasers and redistribute them over white rabbit towards the experimental areas (Nelissen, Gyulai, July 2017)
|
|
board.](https://www.ohwr.org/project/vxs-dsp-fmc-carrier/wiki).
|
|
- have switches and ZEN boards
|
|
To be used in ELENA by end 2015.
|
|
- [ELI-BEAMS](http://www.eli-beams.eu/), Czech Republic
|
|
- Beam Instrumentation group (P.Odier 10/2015)
|
|
- evaluate WR as a potential facility level electronic timing system.
|
|
- Normalising Beta of the DCCT transformers
|
|
- have 2 switches, 2 SPEC cards with DIO and Fine Delay FMCs to do jitter measurements (Bastl, Apr.2015)
|
|
- [LHC Instabilities Trigger
|
|
- interested in Micro TCA platform for control system
|
|
Distribution](https://www.ohwr.org/project/wr-node-core/wikis/LHC-Instability-Trigger)
|
|
- [ELI: Electronic Timing System (ETS) at Facility Level](http://www.mrf.fi/dmdocuments/TIMING_WORKSHOP/02-PavelBastl/ELI-BL-4442-PRE-00000116-B.ppt)
|
|
- [*Instability
|
|
- [EPFL](http://epfl.ch), Switzerland
|
|
diagnostics*](https://indico.cern.ch/event/434129/contributions/1917184/1269938),
|
|
- [EPFL-STI-IEL-DESL-ELL, Distributed Electrical Systems Laboratory](http://desl-pwrs.epfl.ch/)
|
|
T. Levens et al.
|
|
- [EPFL Smart Grid - The Vision](http://smartgrid.epfl.ch/)
|
|
- ProtoDUNE - [CERN Prototype of
|
|
- White Rabbit based Time Synchronization for PMUs (Nov 2016)
|
|
DUNE](https://dune.bnl.gov/wikis/CERN_Prototype)
|
|
- [_A white rabbit synchronized PMU_](https://ieeexplore.ieee.org/document/8260178/), Innovative Smart Grid Technologies Conference Europe (ISGT-Europe), 2017 IEEE PES
|
|
- WA105 subdetector
|
|
- Articles showing the importance of timing in electric grids
|
|
- Global uTCA DAQ architecture integrated with White
|
|
- [_DFT-based Synchrophasor Estimation Algorithms and their Integration in Advanced Phasor Measurement Units for the Real-time Monitoring of Active Distribution Networks_](https://infoscience.epfl.ch/record/215321/files/EPFL_TH6906.pdf), Paolo Romano (notably Chapter 2)
|
|
Rabbit Time and Trigger distribution network + White
|
|
- [_Time Synchronization in the Electric Power System_](https://www.naspi.org/sites/default/files/reference_documents/tstf_electric_power_system_report_pnnl_26331_march_2017_0.pdf), NASPI Technical Report, NASPI Time Synchronization Task Force
|
|
Rabbit slaves nodes in uTCA crates
|
|
- [EPFL ESPLAB](http://esplab.epfl.ch/), Switzerland
|
|
- [Opportunities with
|
|
- White Rabbit Wireless Extension research project: establish synchronization using radio devices that support SyncE and 1000Base-X connections. (M. Rico, June 2015)
|
|
ProtoDUNE-DP](https://indico.cern.ch/event/493989/contributions/2005320/1254851)
|
|
- Designing special backplane for use with WR switch SCB boards to test baseband communication (July 2015)
|
|
(search for Rabbit or WR)
|
|
- [_Ns-level time transfer over a microwave link using the PTP-WR protocol_](http://ieeexplore.ieee.org/document/7138936/?arnumber=7138936)
|
|
- [Images of system in 2017 of WA105
|
|
|
|
subdetector](https://ohwr.org/project/white-rabbit/uploads/6b077ec7b68ccfd80bc38bc99c4331e7/Protodune20170509.pdf)
|
|
|
|
- “The CERN Beam Instrumentation group, together with
|
|
|
|
physicists from the protoDUNE collaboration, is
|
|
|
|
investigating a sub nanosecond time-of-flight system based
|
|
|
|
on scintillating fibres read-out with fast PMT. The SVEC
|
|
|
|
FMC-TDC has been chosen as it has the required timing
|
|
|
|
performance and it integrates White Rabbit, which is
|
|
|
|
required to timestamp the events in a common time reference
|
|
|
|
shared by the beam instrumentation and the protoDUNE
|
|
|
|
detectors.” (Feb 2017, I.Ortega)
|
|
|
|
- SM-18: Magnetic field measurement and distribution of the data
|
|
|
|
in real-time (M. Charrondiere, TE-MSC, April 2016)
|
|
|
|
- [SPS RF distribution over White
|
|
|
|
Rabbit](https://wikis.cern.ch/display/HT/SPS+RF+distribution+over+White+Rabbit)
|
|
|
|
on CERN CO wikis (CERN access only)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [China Spallation Neutron Source Institute of High Energy Physics
|
|
|
|
Chinese Academy of Sciences - CSNS](http://csns.ihep.ac.cn/english/), Beijing, China (Oct 2012, April 2017)
|
|
|
|
- Timing system of the spectrometer. Target and instrument control
|
|
|
|
- Experimental control of the neutron spectrometer during the construction of the project.
|
|
|
|
- [The time synchronization of CSNS neutron instrument](http://ieeexplore.ieee.org/document/7543087/), Real
|
|
|
|
Time Conference (RT), 2016 IEEE-NPSS, J.Zhuang et al.
|
|
|
|
|
|
|
|
|
|
|
|
- [CHIRON-IT](http://chiron-it.nl/), The Netherlands
|
|
|
|
- Measurement system for high-voltage tests, using
|
|
|
|
[SPEC](https://www.ohwr.org/project/spec/wiki) and modified [ADC
|
|
|
|
cards](https://www.ohwr.org/project/fmc-adc-100m14b4cha/wiki).
|
|
|
|
- 700 measurement nodes will be installed at three independent
|
|
|
|
locations. (M.Emke, Feb.2015)
|
|
|
|
|
|
|
|
- [CNGS](https://en.wikipedia.org/wikis/CERN_Neutrinos_to_Gran_Sasso) Timing for neutrino measurements (2012-2014), Italy
|
|
|
|
- *We are running now 9 SPECs for our gamma-ray array prototype.* (November 2013)
|
|
|
|
- [*Performance results of the first White Rabbit installation for CNGS time transfer*](https://ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf) (pdf)
|
|
|
|
- [CERN to Gran Sasso Time Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
|
|
|
|
|
|
- [CTA - Cherenkov Telescope Array](http://www.cta-observatory.org/), [32
|
|
|
|
countries](https://en.wikipedia.org/wikis/Cherenkov_Telescope_Array#cta_consortium_members_and_ctao_shareholders)
|
|
|
|
- [Array Time Synchronization - First Tests with
|
|
|
|
WhiteRabbit](http://www.ifh.de/~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
|
|
|
(14 May 2012)
|
|
|
|
- [*The White Rabbit Project Technical introduction and status
|
|
|
|
report*](https://ohwr.org/project/white-rabbit/uploads/eb3c628cca0e6d783862ec5c175227b6/wr_cta_talk.pdf)
|
|
|
|
presented at [CTA Madrid 2011](http://www.ctamadrid2011.es/)
|
|
|
|
(2011)
|
|
|
|
- [*The ASTRI Mini-Array Software
|
|
|
|
System*](http://media.wix.com/ugd/9aff89_0833faa1994343a3a4e3d77011d5bee8.pdf)
|
|
|
|
(G.Tosti et al, 2013)
|
|
|
|
- [TiCkS: a flexible White-Rabbit based time-stamping
|
|
|
|
board](http://accelconf.web.cern.ch/AccelConf/icalepcs2017/papers/tupha090.pdf)
|
|
|
|
*C. Champion et al, CTA Consortium, ICALEPCS 2017*
|
|
|
|
|
|
|
|
|
|
|
|
- [Culham Centre for Fusion Energy](http://www.ccfe.ac.uk/) (G.
|
|
|
|
Naylor, S.Hall, B.Huang, Jan.2013-Apr.2015), UK
|
|
|
|
- Real-Time Protection System that will prevent the MAST-U
|
|
|
|
machine’s magnetic coils from damage. The White Rabbit
|
|
|
|
collects the signals read from the coils and measure the level
|
|
|
|
of electrical current passing through them during a plasma
|
|
|
|
pulse. If the current gets too high, the Real-Time Protection
|
|
|
|
System automatically kicks in – gradually winding down the power
|
|
|
|
supplies so the pulse can be stopped without harming the
|
|
|
|
machine.
|
|
|
|
- This particular version of the switch has been adapted from one
|
|
|
|
used for data synchronization at CERN, so MAST-U is getting a
|
|
|
|
device with tried-and-tested performance in a ‘big science’
|
|
|
|
setting. Uses Xilinx Aurora streaming (no packets) at 1.25Gbps,
|
|
|
|
latency 0.5us.
|
|
|
|
- [Piece by piece: Real-Time Protection
|
|
|
|
System](https://ohwr.org/project/white-rabbit/uploads/af02fbf4b9686206187751817925ceca/mastwire10.pdf),
|
|
|
|
MASTwire magazine, Page 2
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [DESY](http://tunka-hrjrg.desy.de), Germany
|
|
|
|
- [HiSCORE-EA Gamma-Ray and Cosmic-Ray
|
|
|
|
experiment](http://tunka-hrjrg.desy.de/e98279/index_eng.html) at
|
|
|
|
the Tunka-133 Cherenkov EAS-Array (2012/13). (R. Wischnewski,
|
|
|
|
Feb 2012)
|
|
|
|
- [Array Time Synchronization - First Tests with
|
|
|
|
WhiteRabbit](http://www.ifh.de/~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
|
|
|
- [First Results from the HiSCORE/Siberia WR-setup; plans for
|
|
|
|
CTA](https://ohwr.org/project/white-rabbit/uploads/e29dee4b4458916fd593b55c875e2585/Martin-HiScore.pdf)
|
|
|
|
slideshow, Martin Brückner (Nov.2011)
|
|
|
|
- [A White Rabbit setup for sub-nsec synchronization,
|
|
|
|
timestamping and time calibration in large scale
|
|
|
|
astroparticle physics
|
|
|
|
experiments](http://www.ifh.de/~wischnew/talks/cta/icrc2013/icrc2013-1146_final.pdf)
|
|
|
|
(July 2013)
|
|
|
|
- *We conclude, that this White Rabbit system is ready to
|
|
|
|
be applied under field conditions in large-scale
|
|
|
|
astroparticle physics experiments - for time
|
|
|
|
synchronization with nanosecond precision between
|
|
|
|
individual detectors, distributed over km-scale.*
|
|
|
|
- [Results from the WhiteRabbit sub-nsec time synchronization
|
|
|
|
setup at
|
|
|
|
HiSCORE-Tunka](http://www.ifh.de/~wischnew/talks/cta/icrc2013/icrc2013-1158-final.pdf)
|
|
|
|
(July 2013)
|
|
|
|
- \_We mention that the White architecture guarantees that
|
|
|
|
the clocks in each WR-node is synchronized with full
|
|
|
|
precision
|
|
|
|
at any time. This is an essential difference compared to
|
|
|
|
most proprietary time-synchronization solutions in
|
|
|
|
experiments,
|
|
|
|
based on corrections applied offline (or with
|
|
|
|
significant delay).\_
|
|
|
|
- [Status of the HiSCORE
|
|
|
|
experiment](http://www.ifh.de/~wischnew/talks/cta/icrc2013/icrc2013-1164_final.pdf)
|
|
|
|
(July 2013)
|
|
|
|
- *...we trigger and read out ... with waveform sampling
|
|
|
|
at 1 GHz, and time-synchronization at sub-ns level with
|
|
|
|
a White-Rabbit (WR) based system (time stamping and
|
|
|
|
triggering). Waveform sampling and time-stamping proved
|
|
|
|
to be very stable. The ns-trigger timestamps, obtained
|
|
|
|
from the timing system allow clear Cerenkov air-shower
|
|
|
|
detection.*
|
|
|
|
- [*A Time Stamping TDC for SPEC and ZEN Platforms Based on
|
|
|
|
White
|
|
|
|
Rabbit*](http://accelconf.web.cern.ch/AccelConf/icalepcs2017/papers/thpha088.pdf),
|
|
|
|
M.Brückner et al., PSI & DESY, ICALEPCS 2017
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [Deutsche Börse](http://deutsche-boerse.com/dbg-en/), Germany
|
|
|
|
- [Ultra-accurate time distribution for Deutsche Börse’s trading
|
|
|
|
network](https://deutsche-boerse.com/dbg-en/products-services/insights-innovation-new-technologies-en/Ultra-accurate-time-distribution-for-Deutsche-B-rse-s-trading-network-246490)
|
|
|
|
(October 2017)
|
|
|
|
- [When every nanosecond counts](https://deutsche-boerse.com/dbg-en/products-services/insights-innovation-new-technologies-en/When-every-nanosecond-counts--141444)
|
|
|
|
(Jan.2018)
|
|
|
|
- [High Precision Time - White Rabbit - Pilot](https://www.eurexchange.com/exchange-en/resources/initiatives/technical-changes/high-precision-time-white-rabbit-pilot)
|
|
|
|
(July 2018)
|
|
|
|
- [White Rabbit in Financial
|
|
|
|
Markets](https://ohwr.org/project/white-rabbit/uploads/420142f7965b7b2f6a87582bb2b877b7/wr-in-finance-20181006.pdf),
|
|
|
|
presented at [10th WR Workshop](/oct2018meeting) (Oct.2018)
|
|
|
|
- *White Rabbit and Beyond*, presented at [STAC summit - High
|
|
|
|
Technology in Finance](https://stacresearch.com/fall2018LON)
|
|
|
|
(Nov.2018)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [DLR](http://www.dlr.de/dlr/en/) (German Aerospace Center, Institute
|
|
|
|
for Technical Physics), Germany
|
|
|
|
- [Laser ranging to space-debris
|
|
|
|
objects](http://www.dlr.de/tp/en/desktopdefault.aspx/tabid-7107/11750_read-27635/)
|
|
|
|
(January 2015)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [EISCAT](http://www.eiscat.se/), Sweden
|
|
|
|
- [High Performance Time-based
|
|
|
|
Synchronization](https://www.eiscat3d.se/sites/default/files/WP8_Final_report.pdf#page=56),
|
|
|
|
section 4.1 of EISCAT 3D Preparatory Phase Project - Deliverable
|
|
|
|
8.5: Report on all WP8 activities, Sept.2014
|
|
|
|
- [EISCAT 3D Preparatory Phase Project, Deliverable 8.1: Report on
|
|
|
|
the evaluation of possible synchronization/calibration
|
|
|
|
solutions](https://www.eiscat3d.se/sites/default/files/eiscat3d_deliverable_8.1.pdf),
|
|
|
|
Oct.2012
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [ELI-ALPS](http://www.eli-alps.hu/?q=en), Hungary
|
|
|
|
- laser research facility. Testing ease of use and accuracy.
|
|
|
|
(Kiss, Feb 2015)
|
|
|
|
- have 3 switches, a GPS reference and FMC cards.
|
|
|
|
- Plan to use White Rabbit in order to serve a common timestamps
|
|
|
|
for the whole facility - except for the lasers, which need a
|
|
|
|
femtosecond level synchronization.
|
|
|
|
- [Synchronization issues at
|
|
|
|
ELI-ALPS](http://www.eli-alps.hu/sites/default/files/tangows/20150225-1100-ELI-ALPS-Synchronization-ImreKiss.pdf),
|
|
|
|
I.Kiss, 25 February, 2015, SZEGED
|
|
|
|
- Acquire triggers from the lasers and redistribute them over
|
|
|
|
white rabbit towards the experimental areas (Nelissen, Gyulai,
|
|
|
|
July 2017)
|
|
|
|
- have switches and ZEN boards
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [ELI-BEAMS](http://www.eli-beams.eu/), Czech Republic
|
|
|
|
- evaluate WR as a potential facility level electronic timing
|
|
|
|
system.
|
|
|
|
- have 2 switches, 2 SPEC cards with DIO and Fine Delay FMCs to do
|
|
|
|
jitter measurements (Bastl, Apr.2015)
|
|
|
|
- interested in Micro TCA platform for control system
|
|
|
|
- [ELI: Electronic Timing System (ETS) at Facility
|
|
|
|
Level](http://www.mrf.fi/dmdocuments/TIMING_WORKSHOP/02-PavelBastl/ELI-BL-4442-PRE-00000116-B.ppt)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [EPFL](http://epfl.ch), Switzerland
|
|
|
|
- [EPFL-STI-IEL-DESL-ELL, Distributed Electrical Systems
|
|
|
|
Laboratory](http://desl-pwrs.epfl.ch/)
|
|
|
|
- [EPFL Smart Grid - The Vision](http://smartgrid.epfl.ch/)
|
|
|
|
- White Rabbit based Time Synchronization for PMUs (Nov 2016)
|
|
|
|
- [*A white rabbit synchronized
|
|
|
|
PMU*](https://ieeexplore.ieee.org/document/8260178/),
|
|
|
|
Innovative Smart Grid Technologies Conference Europe
|
|
|
|
(ISGT-Europe), 2017 IEEE PES
|
|
|
|
- Articles showing the importance of timing in electric grids
|
|
|
|
- [*DFT-based Synchrophasor Estimation Algorithms and
|
|
|
|
their Integration in Advanced Phasor Measurement Units
|
|
|
|
for the Real-time Monitoring of Active Distribution
|
|
|
|
Networks*](https://infoscience.epfl.ch/record/215321/files/EPFL_TH6906.pdf),
|
|
|
|
Paolo Romano (notably Chapter 2)
|
|
|
|
- [*Time Synchronization in the Electric Power
|
|
|
|
System*](https://www.naspi.org/sites/default/files/reference_documents/tstf_electric_power_system_report_pnnl_26331_march_2017_0.pdf),
|
|
|
|
NASPI Technical Report, NASPI Time Synchronization Task
|
|
|
|
Force
|
|
|
|
- [EPFL ESPLAB](http://esplab.epfl.ch/), Switzerland
|
|
|
|
- White Rabbit Wireless Extension research project: establish
|
|
|
|
synchronization using radio devices that support SyncE and
|
|
|
|
1000Base-X connections. (M. Rico, June 2015)
|
|
|
|
- Designing special backplane for use with WR switch SCB
|
|
|
|
boards to test baseband communication (July 2015)
|
|
|
|
- [*Ns-level time transfer over a microwave link using the
|
|
|
|
PTP-WR
|
|
|
|
protocol*](http://ieeexplore.ieee.org/document/7138936/?arnumber=7138936)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [ESA - European Space Agency](https://www.esa.int)
|
|
- [ESA - European Space Agency](https://www.esa.int)
|
|
- [TripleT project: ESA, VSL and CGI are working on highly accurate timekeeping](https://www.cginederland.nl/nl/artikelen/triplet-project-esa-vsl-and-cgi-are-working-on-highly-accurate-timekeeping)
|
|
- [TripleT project: ESA, VSL and CGI are working on highly accurate timekeeping](https://www.cginederland.nl/nl/artikelen/triplet-project-esa-vsl-and-cgi-are-working-on-highly-accurate-timekeeping)
|
|
|
|
|
|
- [ESRF](http://www.esrf.eu/), France
|
|
- [ESRF](http://www.esrf.eu/), France
|
|
- Prototyping for distribution of RF signals (N.Janvier, Nov.2015)
|
|
- Prototyping for distribution of RF signals (N.Janvier, Nov.2015)
|
|
- [*Refurbishment of the ESRF accelerator synchronisation system
|
|
- [_Refurbishment of the ESRF accelerator synchronisation system using White Rabbit_](http://icalepcs2017.vrws.de/papers/tucpl01.pdf), G.Goujon et al, October 2017
|
|
using White Rabbit*](http://icalepcs2017.vrws.de/papers/tucpl01.pdf),
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en), Spain
|
|
G.Goujon et al, October 2017
|
|
- After an extensive study, White Rabbit has been chosen as the most promising option for the synchronization network at ESS Bilbao, a light ion linear accelerator. Therefore, first [SPEC](https://www.ohwr.org/project/spec/wiki) to SPEC tests have been performed. Now, with a [White Rabbit switch](/Switch) a new set up will be tested to provide synchronization signals for ESS Bilbao's hydrogen positive ion source (ISHP) in the near future. For 2013 ESS Bilbao is planning to test PXI SPECs ([SPEXI](https://www.ohwr.org/project/spexi/wiki)) which is the most suitable platform for the integration of White Rabbit into ESS Bilbao's general control system. (Oct.2012)
|
|
|
|
- [Fermilab](www.fnal.gov), USA
|
|
<!-- end list -->
|
|
- New proposal for timing and event system. New Altera FPGA board for LLRF and resonance controller application. (J.Einstein, S.Khole, 1/2016)
|
|
|
|
- [SBND Neutrino detector](http://sbn-nd.fnal.gov/), time-stamping and distributing triggers (E.Church/ppnl, 2/2016)
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en), Spain
|
|
- WR network for distributing a common pps GPS-locked to the beam target and the detector halls;
|
|
- After an extensive study, White Rabbit has been chosen as the
|
|
- use of 2 FMC-TDCs, at the BNB and NuMI beam target halls, for time-stamping both the “early warning" and effective beam extraction signals, and distribute these time stamps to the detector halls through WR network;
|
|
most promising option for the synchronization network at ESS
|
|
- use of 2 FMC-FineDelay, at the detector halls, to generate beam gate windows for triggering on the basis on the beam extraction time stamps, and possibly to generate the clocks for the readout electronics from the pps.
|
|
Bilbao, a light ion linear accelerator. Therefore, first
|
|
- This WR network will be the first WR implementation on North America. (D.Torretta, 3/2017)
|
|
[SPEC](https://www.ohwr.org/project/spec/wiki) to SPEC tests
|
|
- [GSI Helmholtzzentrum für Schwerionenforschung GmbH](https://www.gsi.de), Germany
|
|
have been performed. Now, with a [White Rabbit switch](/Switch)
|
|
- [General Machine Timing System at GSI and FAIR](https://www-acc.gsi.de/wiki/Timing/WebHome)
|
|
a new set up will be tested to provide synchronization signals
|
|
- The primary tasks of the timing system are the following:
|
|
for ESS Bilbao's hydrogen positive ion source (ISHP) in the near
|
|
- Time-Synchronization of \~2000 - 3000 nodes with sub-ns accuracy over fiber lengths of up to 2 km.
|
|
future. For 2013 ESS Bilbao is planning to test PXI SPECs
|
|
- Distribution of TAI counters with ns accuracy.
|
|
([SPEXI](https://www.ohwr.org/project/spexi/wiki)) which is the
|
|
- Generation of timing events for synchronization of equipment.
|
|
most suitable platform for the integration of White Rabbit into
|
|
- Provide infrastructure for common services of the accelerator (Post Mortem, Interlock,...) and FAIR experiments (time stamps, ...).
|
|
ESS Bilbao's general control system. (Oct.2012)
|
|
- [_White Rabbit Technology as Basis for the FAIR Timing System_](https://www-acc.gsi.de/wiki/pub/Timing/TimingSystemDocuments/PHN-ACC-RD-45.pdf), D. Beck et al, 2011
|
|
|
|
- [_A reliable White Rabbit Network for the FAIR General Timing Machine_](http://accelconf.web.cern.ch/AccelConf/icalepcs2017/papers/tupha091.pdf), C.Prados et al., GSI & Hochschule Darmstadt, ICALEPCS 2017
|
|
<!-- end list -->
|
|
- [Timing System Documents](https://www-acc.gsi.de/wiki/Timing/TimingSystemDocuments) (papers, technical documents)
|
|
|
|
- [HERA - Hydrogen Epoch of Reionization Array](https://reionization.org/)
|
|
- [Fermilab](www.fnal.gov), USA
|
|
- Radio telescope dedicated to observing large scale structure during and prior to the epoch of reionization.(2/2020)
|
|
- New proposal for timing and event system. New Altera FPGA board
|
|
- [IMPCAS - The Institute of Modern Physics (IMP) of the Chinese Academy of Sciences](http://english.imp.cas.cn/), China
|
|
for LLRF and resonance controller application. (J.Einstein,
|
|
- White Rabbit has been chosen as the facility-wide timing system include control, pulse power and beam-diagnostic systems of the following systems that will be built in the years following 2018 (GG, Apr.2018)
|
|
S.Khole, 1/2016)
|
|
- HIAR (Heavy Ion Research Facility)
|
|
- [SBND Neutrino detector](http://sbn-nd.fnal.gov/), time-stamping
|
|
- CiADS (accelerator-driven subcritical system)
|
|
and distributing triggers (E.Church/ppnl, 2/2016)
|
|
- [INFN di Tor Vergata](https://www.roma2.infn.it/), Italy
|
|
- WR network for distributing a common pps GPS-locked to the beam
|
|
- [_White Rabbit Facility_](https://www.epj-conferences.org/.../epjconf_ricap2017_01011.pdf) (2017)
|
|
target and the detector halls;
|
|
- Describes a White Rabbit Facility for time synchronization being prepared for the future Cherenkov Telescope Array observatory (CTA) and shows quality of synchronisation.
|
|
- use of 2 FMC-TDCs, at the BNB and NuMI beam target halls, for
|
|
- [Istituto Nazionale di Ricerca Metrologica](http://www.inrim.it/) (I.N.RI.M.), Italy
|
|
time-stamping both the “early warning" and effective beam
|
|
- Long haul White Rabbit with external laser, modulator and photodetector, for a time-transfer experiment.
|
|
extraction signals, and distribute these time stamps to the
|
|
- Collaboration with MIKES-VTT, Finland
|
|
detector halls through WR network;
|
|
- [_White Rabbit Time Transfer on Medium and Long Fibre Hauls at INRIM_](https://www.ion.org/publications/abstract.cfm?articleID=12598), Proceedings of the 46th Annual Precise Time and Time Interval Systems and Applications Meeting, 2014
|
|
- use of 2 FMC-FineDelay, at the detector halls, to generate beam
|
|
- [JINR](http://afi.jinr.ru), Russia
|
|
gate windows for triggering on the basis on the beam extraction
|
|
- Main clock distribution at BM@N experiment and MPD
|
|
time stamps, and possibly to generate the clocks for the readout
|
|
- WR-enabled devices took part in real data taking run in 2015.
|
|
electronics from the pps.
|
|
- [White Rabbit enabled boards](http://afi.jinr.ru/CategoryWhiteRabbit)
|
|
- This WR network will be the first WR implementation on North
|
|
- Clock and trigger distribution board [FVME2TMWR](http://afi.jinr.ru/FVME2TM?highlight=%28%5CbCategoryWhiteRabbit%5Cb%29)
|
|
America. (D.Torretta, 3/2017)
|
|
- Stand-alone digitizer [ADC64s2](http://afi.jinr.ru/ADC64s2?highlight=%28%5CbCategoryWhiteRabbit%5Cb%29)
|
|
|
|
- VME64x 72-channel 25 ps multihit timestamping TDC [TDC72VHL](http://afi.jinr.ru/TDC72VHL?highlight=%28%5CbCategoryWhiteRabbit%5Cb%29)
|
|
|
|
- others
|
|
- [GSI Helmholtzzentrum für Schwerionenforschung
|
|
- [NICA - Nuclotron-based Ion Collider facility](http://nica.jinr.ru/)
|
|
GmbH](https://www.gsi.de), Germany
|
|
- Deliver control information to different parts of accelerator over the Ethernet synchronously with a subnanosecond accuracy.
|
|
- [General Machine Timing System at GSI and FAIR](https://www-acc.gsi.de/wiki/Timing/WebHome)
|
|
- Evaluating WR cores: Y.Kozhevnikov and PhD student A.Mukhamatnabeev.
|
|
- The primary tasks of the timing system are the following:
|
|
- Using [SPEXI PXIe](https://www.ohwr.org/project/spexi/wiki) and [FMC DIO](https://www.ohwr.org/project/fmc-dio-5chttla/wiki) boards (D.M. 5/6/2018, 11/18)
|
|
- Time-Synchronization of ~2000 - 3000 nodes with sub-ns
|
|
- Baikal Deep Underwater Neutrino Telescope - BDUNT (see separate entry on this page)
|
|
accuracy over fiber lengths of up to 2 km.
|
|
- [KM3NET](http://km3net.org) ([15 countries](https://www.km3net.org/about-km3net/collaboration/members/))
|
|
- Distribution of TAI counters with ns accuracy.
|
|
- European deep-sea research infrastructure, hosting a neutrino telescope
|
|
- Generation of timing events for synchronization of
|
|
- Central Logic Boards (CLB) that go in the sea will host optical modules with WR; it implements 31 TDC channels to read out 31 PMTs. Inside the Shore-Station will be a _modified_ WR switch where the data in one direction is always broadcast.
|
|
equipment.
|
|
- [KM3Net: a telescope at the bottom of the sea](https://www.ntvn.nl/magazines/2016-3/KM3NeT_1.html) (nice overview and images, use down arrow to go to next page)
|
|
- Provide infrastructure for common services of the
|
|
- On 3 December 2015 a first line with 18 [Digital Optical Modules](http://www.km3net.org/images-DOM.php), each one containing a [White Rabbit PTP Core - WRPC](https://www.ohwr.org/project/wr-cores/wikis/Wrpc-core), was deployed successfully and communicated over 100 Km of fiber with the shore station. This installation is 100 km into the sea off the coast of Italy at 3500 meter depth and must be the weirdest and harshest place to install WR nodes.
|
|
accelerator (Post Mortem, Interlock,...) and FAIR
|
|
- See: [Eerste detectorlijn km3net succesvol afgezonken en verankerd](https://www.nikhef.nl/en/generalstorage/tt-news/events/article/eerste-detectorlijn-km3net-succesvol-afgezonken-en-verankerd/) (in Dutch)
|
|
experiments (time stamps, ...).
|
|
- [CERN recognized experiment to expand scientific capacity](http://home.cern/scientists/updates/2016/02/cern-recognized-experiment-expand-scientific-capacity) (Feb.2016)
|
|
- [*White Rabbit Technology as Basis for the FAIR Timing
|
|
- [YouTube movie of deployment of a string of Optical Modules that use WR](https://www.youtube.com/watch?v=4Aynn5lfZ3I) (May 2016)
|
|
System*](https://www-acc.gsi.de/wiki/pub/Timing/TimingSystemDocuments/PHN-ACC-RD-45.pdf),
|
|
- [CLB/DAQ Meetings](http://indico.cern.ch/categoryDisplay.py?categId=4768)
|
|
D. Beck et al, 2011
|
|
- [KM3NeT CLBv2](http://indico.cern.ch/getFile.py/access?contribId=3&resId=1&materialId=slides&confId=283476) presentation. (Dec.2013)
|
|
- [*A reliable White Rabbit Network for the FAIR General Timing
|
|
- \[Athens and 7S: status update (on-shore items) / KM3Net Project
|
|
Machine*](http://accelconf.web.cern.ch/AccelConf/icalepcs2017/papers/tupha091.pdf),
|
|
- 7Solutions\](http://indico.cern.ch/getFile.py/access?contribId=6&resId=1&materialId=slides&confId=283476) (Dec.2013)
|
|
C.Prados et al., GSI & Hochschule Darmstadt, ICALEPCS 2017
|
|
- [White RabbitandKM3NeT](https://ohwr.org/project/white-rabbit/uploads/635abe92104c2b25d05615c80e730b51/121128_WR_Workshop_7_KM3NeT.pdf) presented at the [Seventh White Rabbit Workshop](https://www.ohwr.org/project/white-rabbit/wikis/Nov2012Meeting), Madrid (Spain), 27-28 November 2012
|
|
- [Timing System
|
|
- [_Reliability studies for the White Rabbit Switch in KM3NeT: FIDES and Highly Accelerated Life Tests_](https://iopscience.iop.org/article/10.1088/1748-0221/15/02/C02042), D.Real et al, Published 27 February 2020
|
|
Documents](https://www-acc.gsi.de/wiki/Timing/TimingSystemDocuments)
|
|
- tests of SCB switch board and FIDES analysis showing MTBF improvements by changing certain components.
|
|
(papers, technical documents)
|
|
- [KRISS](https://www.kriss.re.kr/eng/main/main.html) (Korea)
|
|
|
|
- Transfer of UTC\[KRIS\] from KRISS to Korea Electric Power company using White Rabbit. (January 2019)
|
|
- [HERA - Hydrogen Epoch of Reionization Array](https://reionization.org/)
|
|
- [LHAASO](http://physicsworld.com/cws/article/news/2016) ([Tsinghua University, China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
- Radio telescope dedicated to observing large scale structure during and prior to the epoch of reionization.(2/2020)
|
|
- Timing system of LHAASO (Large High Altitude Air Shower Observation) project Deploying 10,000 detectors over 1 square km at Tibet.
|
|
|
|
- The LHAASO WR timing distribution plan consists of _4 layers of WR switches (583 in total) covering 7344 nodes_ of KM2A and WCDA detectors. It will provide both a timing link and synchronous data acquisition network to every detector front-end for a trigger-less scheme. Four subsystems should be separated via VLAN, and the [redundancy configurations similar to CERN](https://www.ohwr.org/project/white-rabbit/wikis/Documents/White-Rabbit-CERN-Control-and-Timing-Network) should be applied.\
|
|
- [IMPCAS - The Institute of Modern Physics (IMP) of the Chinese
|
|
A small prototype array for the LHAASO experiment has run over a year. It contains four WR switches and 45 [cute-wr](https://www.ohwr.org/project/cute-wr/wiki) nodes. (Sept.2014)
|
|
Academy of Sciences](http://english.imp.cas.cn/), China
|
|
- Start building a small WR network in Tibet. (Aug.2014)
|
|
- White Rabbit has been chosen as the facility-wide timing system
|
|
- Design of [Compact Universal Timing Endpoint Based on White Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware FMC card.
|
|
include control, pulse power and beam-diagnostic systems of the
|
|
- [WR@THU homepage](http://epics.ep.tsinghua.edu.cn/trac/wr) (Chinese only)
|
|
following systems that will be built in the years following 2018
|
|
- Presentations and articles
|
|
(GG, Apr.2018)
|
|
- [Temperature Effect and Correction Method of White Rabbit Timing Link](http://arxiv.org/abs/1406.4223)\
|
|
- HIAR (Heavy Ion Research Facility)
|
|
_Hongming Li, Guanghua Gong, Weibin Pan, Qiang Du, Jianmin Li, IEEE Transactions on Nuclear Science, arXiv:1406.4223, 2014_
|
|
- CiADS (accelerator-driven subcritical system)
|
|
- [_A Packet-based Precise Timing and Synchronous DAQ Network for LHAASO Project_](https://indico.cern.ch/contributionDisplay.py?contribId=195&confId=186337) at 13th Vienna Conference on Instrumentation - [VCI2013](http://vci.hephy.at/), [Slides](https://indico.cern.ch/getFile.py/access?contribId=195&sessionId=17&resId=0&materialId=slides&confId=186337)
|
|
|
|
- [_Distributed Timing System & Applications - White Rabbit in Tsinghua_](http://epics.ep.tsinghua.edu.cn/wr_thu/) (Dec.2012)
|
|
<!-- end list -->
|
|
- [A Prototype Clock System for LHAASO WCDA](http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=6418173)\
|
|
|
|
_Linfeng Shang, Kezhu Song, Pin Cao, Cheng Li, Shubin Liu, Qi An_, 18th IEEE-NPSS Real Time Conference (RT), 2012 18th IEEE-NPSS
|
|
- [INFN di Tor Vergata](https://www.roma2.infn.it/), Italy
|
|
- _Sub-nanosecond Timing System Design and Development for LHAASO Project_ [Slides](http://accelconf.web.cern.ch/AccelConf/icalepcs2011/talks/webhmult04_talk.pdf), [Article](http://accelconf.web.cern.ch/accelconf/icalepcs2011/papers/webhmult04.pdf): [ICALEPCS 2011 conference](http://icalepcs2011.esrf.eu)
|
|
- [*White Rabbit
|
|
- [_A Future Project at Tibet: The Large High Altitude Air Shower Observatory -LHAASO_](http://icrc2009.uni.lodz.pl/proc/pdf/icrc1168.pdf) (general article about LHAASO)
|
|
Facility*](https://www.epj-conferences.org/.../epjconf_ricap2017_01011.pdf)
|
|
- [LNE-SYRTE](http://lne-syrte.obspm.fr/): the French National Metrology Institutes (2015-), France
|
|
(2017)
|
|
- [White Rabbit at SYRTE](syrte) OHR wiki page
|
|
- Describes a White Rabbit Facility for time synchronization
|
|
- Goal 1: high performance for next generation of optical time scale comparison, test of fundamental physics
|
|
being prepared for the future Cherenkov Telescope Array
|
|
- Goal 2: time dissemination to civil society. Plans to deploy at a national scale
|
|
observatory (CTA) and shows quality of synchronisation.
|
|
- [White Rabbit to disseminate time on an active telecom network?](https://ohwr.org/project/white-rabbit/uploads/7077824a45dcee9c550ae44e159e7a79/5_WR4TFdisseminationNational-PEPottie.pdf) (March 2016)
|
|
|
|
- [_Time and frequency transfer over a 500 km cascaded White Rabbit network_](http://ieeexplore.ieee.org/document/8088808/)
|
|
<!-- end list -->
|
|
- [_Long range time transfer using optical fiber links and cross comparison with satellite based methods_](https://hal.archives-ouvertes.fr/tel-01909292/document), Namneet Kaur., Doctoral Thesis at the [PSL Research University](https://www.psl.eu/en) and [LNE-SYRTE](http://lne-syrte.obspm.fr/): the French National Metrology Institutes (2015-), France (Oct.2018)
|
|
|
|
- [MIKES](http://www.mikes.fi/en) (Centre for metrology and accreditation, Finland) (April 2013)
|
|
- [Istituto Nazionale di Ricerca Metrologica](http://www.inrim.it/)
|
|
- [White Rabbit at MIKES](mikes) OHR wiki page
|
|
(I.N.RI.M.), Italy
|
|
- [Evaluating WR for comparison and synchronization of geographically distant atomic clocks](https://ohwr.org/project/white-rabbit/uploads/c6b0314e91a7ce93ad556ee7afaeaa47/MIKES-CSC_WR_time_link.pdf)
|
|
- Long haul White Rabbit with external laser, modulator and
|
|
- 1000 km (thousand kilometer) link up and running! (12/8/2013)
|
|
photodetector, for a time-transfer experiment.
|
|
- [SIB02 JRP-Publishable Summary Nov 2013](http://www.ptb.de/emrp/neatft_project.html?&no_cache=1&cid=2519&did=8341&sechash=6bf28c69) describes some results. Participation in [NEAT-FT](http://www.ptb.de/emrp/neatft_home.html).
|
|
- Collaboration with MIKES-VTT, Finland
|
|
- _... the possibility to construct a time link between radio-observatories at Metsähovi and Onsala was investigated. In Finland the only viable way of accomplishing this goal is by using the Precision Timing Protocol White Rabbit, PTP-WR, to link MIKES and Metsähovi._
|
|
- [*White Rabbit Time Transfer on Medium and Long Fibre Hauls at
|
|
- _These first steps towards the implementation of the White Rabbit protocol demonstrate the capability to extend the range of WR towards 1 000 km distance._
|
|
INRIM*](https://www.ion.org/publications/abstract.cfm?articleID=12598),
|
|
- [_White Rabbit Precision Time Protocol on Long-Distance Fiber Links_](http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7383303&tag=1)
|
|
Proceedings of the 46th Annual Precise Time and Time Interval
|
|
- [MIKES connected Geodetic Research Station to the official time of Finland, UTC\[MIKE\]](https://maanmittauslaitos.fi/en/topical_issues/metsahovi-connected-official-time-finland) (Aug.2017)
|
|
Systems and Applications Meeting, 2014
|
|
- [Paris Observatory](http://www.obspm.fr/?lang=en) (Observatoire de Paris / CNRS-INSU, CNRS-IN2P3), France (July 2015)
|
|
|
|
- [NEBuLA - Wideband digitiser for astronomy](http://nebula.obs-nancay.fr/?lang=en) (NumEriseur à Bande Large pour l’Astronomie)
|
|
<!-- end list -->
|
|
- Digitize the RF frequency band of an antenna directly in its pedestal
|
|
|
|
- Export data over fiber to a common computing facility
|
|
- [JINR](http://afi.jinr.ru), Russia
|
|
- Provide time and frequency references to allow for multi-antennae processing, further in the chain.
|
|
- Main clock distribution at BM@N experiment and MPD
|
|
- [SKA - Square Kilometre Array](http://skatelescope.org).
|
|
- WR-enabled devices took part in real data taking run in
|
|
- The dish receivers have to maintain coherence - which means phase stability to an equivalent rms of 1 ps over time scales of 10-15 mins. This can be done by using go and return signals on optical fibre. In addition time at the dishes and stations need to be known to a few ns. The latter could be done by a network of GPS receivers, NPT or White Rabbit. White Rabbit looks good in terms of cost/performance.
|
|
2015.
|
|
- [Universiteit van Amsterdam](http://www.uva.nl/en/home), [API](http://www.astro.uva.nl), [Grappa](http://grappa.science.uva.nl), The Netherlands
|
|
- [White Rabbit enabled
|
|
- Design and evaluation of a central clock distribution system for the Cherenkov Telescope Array ([CTA](https://www.cta-observatory.org)) for event time stamping of \~100 telescopes
|
|
boards](http://afi.jinr.ru/CategoryWhiteRabbit)
|
|
- Use of two custom WhiteRabbit switches as the data acquisition board of the CHEC-M and CHEC-S prototype cameras ([CTA-UK](https://www.cta-observatory.ac.uk))
|
|
- Clock and trigger distribution board
|
|
- Cooperation with DESY Zeuthen, VU University Amsterdam and KM3Net@Nikhef
|
|
[FVME2TMWR](http://afi.jinr.ru/FVME2TM?highlight=%28%5CbCategoryWhiteRabbit%5Cb%29)
|
|
- High-precision fibre-optical timing distribution systems over large distances and their application to astroparticle physics facilities ([presentation](http://indico.cern.ch/event/192695/session/14/contribution/152/material/slides/0.pdf))
|
|
- Stand-alone digitizer
|
|
- [Vrije Universiteit Amsterdam, dept of Physics and Astronomics](https://www.nat.vu.nl/en/index.aspx), The Netherlands
|
|
[ADC64s2](http://afi.jinr.ru/ADC64s2?highlight=%28%5CbCategoryWhiteRabbit%5Cb%29)
|
|
- [SuperGPS through optical networks](http://www.nat.vu.nl/\~koel/SuperGPS.html)
|
|
- VME64x 72-channel 25 ps multihit timestamping TDC
|
|
- [Workshop on Optical Networks for Accurate Time and Frequency Transfer](http://www.ptb.de/emrp/1328.html)
|
|
[TDC72VHL](http://afi.jinr.ru/TDC72VHL?highlight=%28%5CbCategoryWhiteRabbit%5Cb%29)
|
|
- Partners
|
|
- others
|
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3))
|
|
- [NICA - Nuclotron-based Ion Collider
|
|
- [Slides of plans](https://ohwr.org/project/white-rabbit/uploads/40120120076ce7618e8a88d410350e95/130715_VSL.pdf). 5 km link working (14/8/2013)
|
|
facility](http://nica.jinr.ru/)
|
|
- 120 km link from Delft to Amsterdam working. Two WR links, both using _dark channels_ at 1470nm and 1490nm in a CWDM network using [high-power SFPs](/Non-compliantSFP) and light amplifiers. (15/8/2014)
|
|
- Deliver control information to different parts of
|
|
- [_Always on time with the White Rabbit protocol_](https://www.vsl.nl/en/about-vsl/news/always-time-white-rabbit-protocol), VSL Press Release (28/8/14)
|
|
accelerator over the Ethernet synchronously with a
|
|
- [ASTRON](https://www.astron.nl), The Netherlands
|
|
subnanosecond accuracy.
|
|
* LOFAR2
|
|
- Evaluating WR cores: Y.Kozhevnikov and PhD student
|
|
* distribution of the reference clock to all Dutch LOFAR2 stations using a 2 adjacent DWDM SFPs with optical multiplexers.
|
|
A.Mukhamatnabeev.
|
|
- [MID4automotive](https://www.mid4automotive.de/en/), 3D-MID for Wireless Automotive Applications, Framework program of the Federal Goverment of Germany for Research and Innovation 2021-2024.
|
|
- Using [SPEXI PXIe](https://www.ohwr.org/project/spexi/wiki)
|
|
* The project goal os fo develop low-cost, high performance and highly integrated radar systems that can be directly integrated into plastic surfaces. This will be based on 3D-MID (Molded Interconnection Device) technology. Radar transceivers intergrated in this way will be connected directly to the antennas in order to minimize losses. The WR technology will be integrated in the modules to keep the system synchronized
|
|
and [FMC
|
|
|
|
DIO](https://www.ohwr.org/project/fmc-dio-5chttla/wiki)
|
|
---
|
|
boards (D.M. 5/6/2018, 11/18)
|
|
|
|
- Baikal Deep Underwater Neutrino Telescope - BDUNT (see separate
|
|
|
|
entry on this page)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [KM3NET](http://km3net.org) ([15
|
|
|
|
countries](https://www.km3net.org/about-km3net/collaboration/members/))
|
|
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
|
|
|
telescope
|
|
|
|
- Central Logic Boards (CLB) that go in the sea will host optical
|
|
|
|
modules with WR; it implements 31 TDC channels to read out 31
|
|
|
|
PMTs. Inside the Shore-Station will be a *modified* WR switch
|
|
|
|
where the data in one direction is always broadcast.
|
|
|
|
- [KM3Net: a telescope at the bottom of the
|
|
|
|
sea](https://www.ntvn.nl/magazines/2016-3/KM3NeT_1.html) (nice
|
|
|
|
overview and images, use down arrow to go to next page)
|
|
|
|
- On 3 December 2015 a first line with 18 [Digital Optical
|
|
|
|
Modules](http://www.km3net.org/images-DOM.php), each one
|
|
|
|
containing a [White Rabbit PTP Core -
|
|
|
|
WRPC](https://www.ohwr.org/project/wr-cores/wikis/Wrpc-core),
|
|
|
|
was deployed successfully and communicated over 100 Km of fiber
|
|
|
|
with the shore station. This installation is 100 km into the sea
|
|
|
|
off the coast of Italy at 3500 meter depth and must be the
|
|
|
|
weirdest and harshest place to install WR nodes.
|
|
|
|
- See: [Eerste detectorlijn km3net succesvol afgezonken en
|
|
|
|
verankerd](https://www.nikhef.nl/en/generalstorage/tt-news/events/article/eerste-detectorlijn-km3net-succesvol-afgezonken-en-verankerd/)
|
|
|
|
(in Dutch)
|
|
|
|
- [CERN recognized experiment to expand scientific
|
|
|
|
capacity](http://home.cern/scientists/updates/2016/02/cern-recognized-experiment-expand-scientific-capacity)
|
|
|
|
(Feb.2016)
|
|
|
|
- [YouTube movie of deployment of a string of Optical Modules
|
|
|
|
that use WR](https://www.youtube.com/watch?v=4Aynn5lfZ3I)
|
|
|
|
(May 2016)
|
|
|
|
- [CLB/DAQ
|
|
|
|
Meetings](http://indico.cern.ch/categoryDisplay.py?categId=4768)
|
|
|
|
- [KM3NeT
|
|
|
|
CLBv2](http://indico.cern.ch/getFile.py/access?contribId=3&resId=1&materialId=slides&confId=283476)
|
|
|
|
presentation. (Dec.2013)
|
|
|
|
- [Athens and 7S: status update (on-shore items) / KM3Net
|
|
|
|
Project
|
|
|
|
- 7Solutions](http://indico.cern.ch/getFile.py/access?contribId=6&resId=1&materialId=slides&confId=283476)
|
|
|
|
(Dec.2013)
|
|
|
|
- [White
|
|
|
|
RabbitandKM3NeT](https://ohwr.org/project/white-rabbit/uploads/635abe92104c2b25d05615c80e730b51/121128_WR_Workshop_7_KM3NeT.pdf)
|
|
|
|
presented at the [Seventh White Rabbit
|
|
|
|
Workshop](https://www.ohwr.org/project/white-rabbit/wikis/Nov2012Meeting),
|
|
|
|
Madrid (Spain), 27-28 November 2012
|
|
|
|
- [*Reliability studies for the White Rabbit Switch in KM3NeT: FIDES and Highly Accelerated Life Tests*](https://iopscience.iop.org/article/10.1088/1748-0221/15/02/C02042), D.Real et al, Published 27 February 2020
|
|
|
|
- tests of SCB switch board and FIDES analysis showing MTBF improvements by changing certain components.
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [KRISS](https://www.kriss.re.kr/eng/main/main.html) (Korea)
|
|
|
|
- Transfer of UTC\[KRIS\] from KRISS to Korea Electric Power
|
|
|
|
company using White Rabbit. (January 2019)
|
|
|
|
|
|
|
|
|
|
|
|
- [LHAASO](http://physicsworld.com/cws/article/news/2016)
|
|
|
|
([Tsinghua University,
|
|
|
|
China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
|
|
Observation) project Deploying 10,000 detectors over 1 square km
|
|
|
|
at Tibet.
|
|
|
|
- The LHAASO WR timing distribution plan consists of *4 layers of
|
|
|
|
WR switches (583 in total) covering 7344 nodes* of KM2A and WCDA
|
|
|
|
detectors. It will provide both a timing link and synchronous
|
|
|
|
data acquisition network to every detector front-end for a
|
|
|
|
trigger-less scheme. Four subsystems should be separated via
|
|
|
|
VLAN, and the [redundancy configurations similar to
|
|
|
|
CERN](https://www.ohwr.org/project/white-rabbit/wikis/Documents/White-Rabbit-CERN-Control-and-Timing-Network) should be applied.
|
|
|
|
A small prototype array for the LHAASO experiment has run over a
|
|
|
|
year. It contains four WR switches and 45
|
|
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) nodes.
|
|
|
|
(Sept.2014)
|
|
|
|
- Start building a small WR network in Tibet. (Aug.2014)
|
|
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
|
|
|
FMC card.
|
|
|
|
- [WR@THU homepage](http://epics.ep.tsinghua.edu.cn/trac/wr)
|
|
|
|
(Chinese only)
|
|
|
|
- Presentations and articles
|
|
|
|
- [Temperature Effect and Correction Method of White Rabbit
|
|
|
|
Timing Link](http://arxiv.org/abs/1406.4223)
|
|
|
|
*Hongming Li, Guanghua Gong, Weibin Pan, Qiang Du, Jianmin
|
|
|
|
Li, IEEE Transactions on Nuclear Science, arXiv:1406.4223,
|
|
|
|
2014*
|
|
|
|
- [*A Packet-based Precise Timing and Synchronous DAQ Network
|
|
|
|
for LHAASO
|
|
|
|
Project*](https://indico.cern.ch/contributionDisplay.py?contribId=195&confId=186337)
|
|
|
|
at 13th Vienna Conference on Instrumentation -
|
|
|
|
[VCI2013](http://vci.hephy.at/),
|
|
|
|
[Slides](https://indico.cern.ch/getFile.py/access?contribId=195&sessionId=17&resId=0&materialId=slides&confId=186337)
|
|
|
|
- [*Distributed Timing System & Applications - White Rabbit in
|
|
|
|
Tsinghua*](http://epics.ep.tsinghua.edu.cn/wr_thu/)
|
|
|
|
(Dec.2012)
|
|
|
|
- [A Prototype Clock System for LHAASO
|
|
|
|
WCDA](http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=6418173)
|
|
|
|
*Linfeng Shang, Kezhu Song, Pin Cao, Cheng Li, Shubin Liu,
|
|
|
|
Qi An*, 18th IEEE-NPSS Real Time Conference (RT), 2012 18th
|
|
|
|
IEEE-NPSS
|
|
|
|
- *Sub-nanosecond Timing System Design and Development for
|
|
|
|
LHAASO Project*
|
|
|
|
[Slides](http://accelconf.web.cern.ch/AccelConf/icalepcs2011/talks/webhmult04_talk.pdf),
|
|
|
|
[Article](http://accelconf.web.cern.ch/accelconf/icalepcs2011/papers/webhmult04.pdf):
|
|
|
|
[ICALEPCS 2011 conference](http://icalepcs2011.esrf.eu)
|
|
|
|
- [*A Future Project at Tibet: The Large High Altitude Air
|
|
|
|
Shower Observatory
|
|
|
|
-LHAASO*](http://icrc2009.uni.lodz.pl/proc/pdf/icrc1168.pdf)
|
|
|
|
(general article about LHAASO)
|
|
|
|
|
|
|
|
|
|
|
|
- [LNE-SYRTE](http://lne-syrte.obspm.fr/): the French National
|
|
|
|
Metrology Institutes (2015-), France
|
|
|
|
- [White Rabbit at SYRTE](syrte) OHR wiki page
|
|
|
|
- Goal 1: high performance for next generation of optical time
|
|
|
|
scale comparison, test of fundamental physics
|
|
|
|
- Goal 2: time dissemination to civil society. Plans to deploy at
|
|
|
|
a national scale
|
|
|
|
- [White Rabbit to disseminate time on an active telecom
|
|
|
|
network?](https://ohwr.org/project/white-rabbit/uploads/7077824a45dcee9c550ae44e159e7a79/5_WR4TFdisseminationNational-PEPottie.pdf)
|
|
|
|
(March 2016)
|
|
|
|
- [*Time and frequency transfer over a 500 km cascaded White
|
|
|
|
Rabbit network*](http://ieeexplore.ieee.org/document/8088808/)
|
|
|
|
- [*Long range time transfer using optical fiber links and cross
|
|
|
|
comparison with satellite based
|
|
|
|
methods*](https://hal.archives-ouvertes.fr/tel-01909292/document),
|
|
|
|
Namneet Kaur., Doctoral Thesis at the [PSL Research
|
|
|
|
University](https://www.psl.eu/en) and
|
|
|
|
[LNE-SYRTE](http://lne-syrte.obspm.fr/): the French National
|
|
|
|
Metrology Institutes (2015-), France (Oct.2018)
|
|
|
|
|
|
|
|
|
|
|
|
- [MIKES](http://www.mikes.fi/en) (Centre for metrology and accreditation, Finland) (April 2013)
|
|
|
|
- [White Rabbit at MIKES](mikes) OHR wiki page
|
|
|
|
- [Evaluating WR for comparison and synchronization of
|
|
|
|
geographically distant atomic
|
|
|
|
clocks](https://ohwr.org/project/white-rabbit/uploads/c6b0314e91a7ce93ad556ee7afaeaa47/MIKES-CSC_WR_time_link.pdf)
|
|
|
|
- 1000 km (thousand kilometer) link up and running\! (12/8/2013)
|
|
|
|
- [SIB02 JRP-Publishable Summary
|
|
|
|
Nov 2013](http://www.ptb.de/emrp/neatft_project.html?&no_cache=1&cid=2519&did=8341&sechash=6bf28c69)
|
|
|
|
describes some results. Participation in
|
|
|
|
[NEAT-FT](http://www.ptb.de/emrp/neatft_home.html).
|
|
|
|
- *... the possibility to construct a time link between
|
|
|
|
radio-observatories at Metsähovi and Onsala was
|
|
|
|
investigated. In Finland the only viable way of
|
|
|
|
accomplishing this goal is by using the Precision Timing
|
|
|
|
Protocol White Rabbit, PTP-WR, to link MIKES and Metsähovi.*
|
|
|
|
- *These first steps towards the implementation of the White
|
|
|
|
Rabbit protocol demonstrate the capability to extend the
|
|
|
|
range of WR towards 1 000 km distance.*
|
|
|
|
- [*White Rabbit Precision Time Protocol on Long-Distance Fiber
|
|
|
|
Links*](http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7383303&tag=1)
|
|
|
|
- [MIKES connected Geodetic Research Station to the official time
|
|
|
|
of Finland,
|
|
|
|
UTC\[MIKE\]](https://maanmittauslaitos.fi/en/topical_issues/metsahovi-connected-official-time-finland)
|
|
|
|
(Aug.2017)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- [Paris Observatory](http://www.obspm.fr/?lang=en) (Observatoire de Paris / CNRS-INSU, CNRS-IN2P3), France (July 2015)
|
|
|
|
- [NEBuLA - Wideband digitiser for
|
|
|
|
astronomy](http://nebula.obs-nancay.fr/?lang=en) (NumEriseur à
|
|
|
|
Bande Large pour l’Astronomie)
|
|
|
|
- Digitize the RF frequency band of an antenna directly in its
|
|
|
|
pedestal
|
|
|
|
- Export data over fiber to a common computing facility
|
|
|
|
- Provide time and frequency references to allow for
|
|
|
|
multi-antennae processing, further in the chain.
|
|
|
|
|
|
|
|
- [SKA - Square Kilometre Array](http://skatelescope.org).
|
|
|
|
- The dish receivers have to maintain coherence - which means
|
|
|
|
phase stability to an equivalent rms of 1 ps over time scales of
|
|
|
|
10-15 mins. This can be done by using go and return signals on
|
|
|
|
optical fibre. In addition time at the dishes and stations need
|
|
|
|
to be known to a few ns. The latter could be done by a network
|
|
|
|
of GPS receivers, NPT or White Rabbit. White Rabbit looks good
|
|
|
|
in terms of cost/performance.
|
|
|
|
|
|
|
|
- [Universiteit van Amsterdam](http://www.uva.nl/en/home),
|
|
|
|
[API](http://www.astro.uva.nl),
|
|
|
|
[Grappa](http://grappa.science.uva.nl), The Netherlands
|
|
|
|
- Design and evaluation of a central clock distribution system for
|
|
|
|
the Cherenkov Telescope Array
|
|
|
|
([CTA](https://www.cta-observatory.org)) for event time
|
|
|
|
stamping of ~100 telescopes
|
|
|
|
- Use of two custom WhiteRabbit switches as the data acquisition
|
|
|
|
board of the CHEC-M and CHEC-S prototype cameras
|
|
|
|
([CTA-UK](https://www.cta-observatory.ac.uk))
|
|
|
|
- Cooperation with DESY Zeuthen, VU University Amsterdam and
|
|
|
|
KM3Net@Nikhef
|
|
|
|
- High-precision fibre-optical timing distribution systems over
|
|
|
|
large distances and their application to astroparticle physics
|
|
|
|
facilities
|
|
|
|
([presentation](http://indico.cern.ch/event/192695/session/14/contribution/152/material/slides/0.pdf))
|
|
|
|
|
|
|
|
- [Vrije Universiteit Amsterdam, dept of Physics and
|
|
|
|
Astronomics](https://www.nat.vu.nl/en/index.aspx), The Netherlands
|
|
|
|
- [SuperGPS through optical
|
|
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
|
|
|
- [Workshop on Optical Networks for Accurate Time and Frequency
|
|
|
|
Transfer](http://www.ptb.de/emrp/1328.html)
|
|
|
|
- Partners
|
|
|
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3))
|
|
|
|
- [Slides of
|
|
|
|
plans](https://ohwr.org/project/white-rabbit/uploads/40120120076ce7618e8a88d410350e95/130715_VSL.pdf).
|
|
|
|
5 km link working (14/8/2013)
|
|
|
|
- 120 km link from Delft to Amsterdam working. Two WR
|
|
|
|
links, both using *dark channels* at 1470nm and 1490nm
|
|
|
|
in a CWDM network using [high-power
|
|
|
|
SFPs](/Non-compliantSFP) and light amplifiers.
|
|
|
|
(15/8/2014)
|
|
|
|
- [*Always on time with the White Rabbit
|
|
|
|
protocol*](https://www.vsl.nl/en/about-vsl/news/always-time-white-rabbit-protocol),
|
|
|
|
VSL Press Release (28/8/14)
|
|
|
|
|
|
|
|
-----
|
|
|
|
|
|
|
|
## Considering/evaluating
|
|
## Considering/evaluating
|
|
|
|
|
|
- [Deutsche Telekom](https://www.telekom.com/en), Germany
|
|
- [Deutsche Telekom](https://www.telekom.com/en), Germany
|
|
- Evaluating IEEE1588 High-accuracy (aka. White Rabbit) as one of the methods for [Time Transfer for Supervision & measurement at the core network level](https://wstsconference.com/wp-content/uploads/2018/11/2-04_DT_Imlau_Accurate-Precise-Telco-Networking-Sync-3.pdf) (April 2017)
|
|
- Evaluating IEEE1588 High-accuracy (aka. White Rabbit) as one of the methods for [Time Transfer for Supervision & measurement at the core network level](https://wstsconference.com/wp-content/uploads/2018/11/2-04_DT_Imlau_Accurate-Precise-Telco-Networking-Sync-3.pdf) (April 2017)
|
|
- [Lab test results presented at ISPCS2019 (slide 16)](https://www.researchgate.net/publication/336013265_Highly_Accurate_Time_Dissemination_and_Network_Synchronization_at_ISPCS_2019) (Sept. 2019)
|
|
- [Lab test results presented at ISPCS2019 (slide 16)](https://www.researchgate.net/publication/336013265_Highly_Accurate_Time_Dissemination_and_Network_Synchronization_at_ISPCS_2019) (Sept. 2019)
|
|
- [Allied Partners](http://alliedpartnersllc.com/), USA
|
|
- [Allied Partners](http://alliedpartnersllc.com/), USA
|
|
- Evaluating deterministic ethernet solutions for critical
|
|
- Evaluating deterministic ethernet solutions for critical infrastructure networks and applications (July 2012)
|
|
infrastructure networks and applications (July 2012)
|
|
- [Ain Shams University](http://www.asu.edu.eg/), Egypt (Oct.2015)
|
|
- [Ain Shams University](http://www.asu.edu.eg/), Egypt (Oct.2015)
|
|
- White Rabbit for Internet of Things.
|
|
- White Rabbit for Internet of Things.
|
|
- [Cosylab](http://cosylab.com/) WR timing system test, Slovenia
|
|
- [Cosylab](http://cosylab.com/) WR timing system test, Slovenia
|
|
- [ESRF](http://www.esrf.eu), France
|
|
- [ESRF](http://www.esrf.eu), France
|
|
- Upgrade program of its storage ring. First analysis of several existing systems is done and arrived to the conclusion that, at the lights of the architecture and features of the product, it is worth to consider White Rabbit as the most attractive candidate. (Chaize, Feb 2014)
|
|
- Upgrade program of its storage ring. First analysis of several
|
|
- Tests done with WR evaluation kit. Need for RF transmission over WR (Goujon, Jan 2015)
|
|
existing systems is done and arrived to the conclusion that, at
|
|
- [Hartnell College - Physics](http://www.hartnell.edu/physics/program.htm), USA
|
|
the lights of the architecture and features of the product, it
|
|
- Provide time stamp information for triggers from cosmic ray coincidence events using White Rabbit. (Aug 2014)
|
|
is worth to consider White Rabbit as the most attractive
|
|
- [ESS Lund](http://ess-scandinavia.eu/), Sweden
|
|
candidate. (Chaize, Feb 2014)
|
|
- LTH (Lunds Tekniska Högskola) in Sweden, master thesis work on Time synchronization by software. Work requested by ESS is: how to synchronize a laptop with a White Rabbit network by software (Linux and Windows), (F.Winquist, O.Abdilameer, May 2015).
|
|
- Tests done with WR evaluation kit. Need for RF transmission over
|
|
- [Institute for plasma research](http://www.ipr.res.in/), Gujarat, India
|
|
WR (Goujon, Jan 2015)
|
|
- Use White Rabbit for Timing synchronization and trigger distribution. using PCs, VME and PXI. (June 2015)
|
|
- [Hartnell College -
|
|
- [Overview of Data Acquisition and Central Control System of Steady state Superconducting Tokamak -SST-1](http://www.ipr.res.in/iaeatm2015/documents/31_IAEA_TM_Pradhan.pptx) (PPT, 2015)
|
|
Physics](http://www.hartnell.edu/physics/program.htm), USA
|
|
- IHEP, Beijing China
|
|
- Provide time stamp information for triggers from cosmic ray
|
|
- HEPS (High Energy Photon Source ) project, replacing the traditional event driven MRF system. (Oct.2018)
|
|
coincidence events using White Rabbit. (Aug 2014)
|
|
- [ITER](http://www.iter.org/) timing system (F. Di Maio, Feb 2012), France
|
|
- [ESS Lund](http://ess-scandinavia.eu/), Sweden
|
|
- [Michigan State University](http://frib.msu.edu/), USA
|
|
- LTH (Lunds Tekniska Högskola) in Sweden, master thesis work on
|
|
- [FRIB accelerator project](http://www.frib.msu.edu): synchronization and trigger distribution system for the data acquisition system (July 2014)
|
|
Time synchronization by software. Work requested by ESS is: how
|
|
- [NPL](http://www.npl.co.uk/), UK
|
|
to synchronize a laptop with a White Rabbit network by software
|
|
- [_Update on the NPLTime (r) Service and Future Developments with White Rabbit_](https://www.ion.org/ptti/abstracts.cfm?paperID=4618) - PTTI Meeting, Feb 2017
|
|
(Linux and Windows), (F.Winquist, O.Abdilameer, May 2015).
|
|
- [National Synchrotron Radiation Laboratory](http://en.nsrl.ustc.edu.cn), University of Science and Technology of China, China (Oct 2012)
|
|
- [Institute for plasma research](http://www.ipr.res.in/), Gujarat,
|
|
- Upgrade of the timing and control systems of accelerators. Will build demo to assess the feasibility.
|
|
India
|
|
- [SPring-8](http://www.spring8.or.jp/en) (Japan) (Nov 2014)
|
|
- Use White Rabbit for Timing synchronization and trigger
|
|
- An evaluation system for a new trigger and tag information distribution system using White Rabbit.
|
|
distribution. using PCs, VME and PXI. (June 2015)
|
|
- [University of Cape Town](http://www.uct.ac.za/) (UCT) in collaboration with University [College London](http://www.ucl.ac.uk) (UCL) (South Africa, United Kingdom)
|
|
- [Overview of Data Acquisition and Central Control System of
|
|
- NeXtRAD, a dual polarised X- and L-Band multistatic Radar, primarily for maritime usage (analysing sea clutter, finding small targets in different sea conditions etc.). (S.Lewis, Jan 2016)
|
|
Steady state Superconducting Tokamak
|
|
- Article: [NeXtRAD and RHINO radar: Harnessing the herd for networked radar](http://ieeexplore.ieee.org/xpls/abs_all.jsp?arnumber=7060408&tag=1), using the OHR [RHINO](https://www.ohwr.org/project/rhino-hardware-01/wiki) board.
|
|
-SST-1](http://www.ipr.res.in/iaeatm2015/documents/31_IAEA_TM_Pradhan.pptx)
|
|
- [Variable Energy Cyclotron Centre](http://www.vecc.gov.in/) (India)
|
|
(PPT, 2015)
|
|
- Correlate the events between different DAQ systems using a SVEC module with White Rabbit support (July 2018)
|
|
- IHEP, Beijing China
|
|
- To improve system described at [Heterogeneous data acquisition system & time correlation](https://ieeexplore.ieee.org/document/8204037/)
|
|
- HEPS (High Energy Photon Source ) project, replacing the
|
|
- Other
|
|
traditional event driven MRF system. (Oct.2018)
|
|
- Passive radar installation (2017)
|
|
- [ITER](http://www.iter.org/) timing system (F. Di Maio, Feb 2012),
|
|
- Replacing several GPS receivers on a site by a single one (2013)
|
|
France
|
|
|
|
- [Michigan State University](http://frib.msu.edu/), USA
|
|
---
|
|
- [FRIB accelerator project](http://www.frib.msu.edu):
|
|
|
|
synchronization and trigger distribution system for the data
|
|
|
|
acquisition system (July 2014)
|
|
|
|
- [NPL](http://www.npl.co.uk/), UK
|
|
|
|
- [*Update on the NPLTime (r) Service and Future Developments with
|
|
|
|
White
|
|
|
|
Rabbit*](https://www.ion.org/ptti/abstracts.cfm?paperID=4618) -
|
|
|
|
PTTI Meeting, Feb 2017
|
|
|
|
- [National Synchrotron Radiation
|
|
|
|
Laboratory](http://en.nsrl.ustc.edu.cn), University of Science and
|
|
|
|
Technology of China, China (Oct 2012)
|
|
|
|
- Upgrade of the timing and control systems of accelerators. Will
|
|
|
|
build demo to assess the feasibility.
|
|
|
|
- [SPring-8](http://www.spring8.or.jp/en) (Japan) (Nov 2014)
|
|
|
|
- An evaluation system for a new trigger and tag information
|
|
|
|
distribution system using White Rabbit.
|
|
|
|
- [University of Cape Town](http://www.uct.ac.za/) (UCT) in
|
|
|
|
collaboration with University [College London](http://www.ucl.ac.uk)
|
|
|
|
(UCL) (South Africa, United Kingdom)
|
|
|
|
- NeXtRAD, a dual polarised X- and L-Band multistatic Radar,
|
|
|
|
primarily for maritime usage (analysing sea clutter, finding
|
|
|
|
small targets in different sea conditions etc.). (S.Lewis, Jan
|
|
|
|
2016)
|
|
|
|
- Article: [NeXtRAD and RHINO radar: Harnessing the herd for
|
|
|
|
networked
|
|
|
|
radar](http://ieeexplore.ieee.org/xpls/abs_all.jsp?arnumber=7060408&tag=1),
|
|
|
|
using the OHR
|
|
|
|
[RHINO](https://www.ohwr.org/project/rhino-hardware-01/wiki)
|
|
|
|
board.
|
|
|
|
- [Variable Energy Cyclotron Centre](http://www.vecc.gov.in/) (India)
|
|
|
|
- Correlate the events between different DAQ systems using a SVEC
|
|
|
|
module with White Rabbit support (July 2018)
|
|
|
|
- To improve system described at [Heterogeneous data acquisition
|
|
|
|
system & time
|
|
|
|
correlation](https://ieeexplore.ieee.org/document/8204037/)
|
|
|
|
- Other
|
|
|
|
- Passive radar installation (2017)
|
|
|
|
- Replacing several GPS receivers on a site by a single one (2013)
|
|
|
|
|
|
|
|
-----
|
|
|
|
|
|
|
|
## Publicly funded projects where White Rabbit plays a role
|
|
## Publicly funded projects where White Rabbit plays a role
|
|
|
|
|
|
- [ARTEMIS JU EMC2](http://www.artemis-emc2.eu/)
|
|
- [ARTEMIS JU EMC2](http://www.artemis-emc2.eu/)
|
|
- UGR and Seven Solutions are finishing the implementation of the
|
|
- UGR and Seven Solutions are finishing the implementation of the HSR protocol for WR devices, in particular the WR-Switch to increase availability and avoid single point of failure for time and data distribution. This work has been done in the framework of the European ARTEMIS JU EMC2 project and involves the development of the Peer-2-Peer mechanism for clock propagation, PeerDelay for the delay measurement, the utilization of HSR tags in frames, and the Switch-over mechanism developed by CERN to recover from a node failure. Current progress and more information can be found at the OHWR [WR-HSR webpage](https://www.ohwr.org/project/wr-hsr/wiki).
|
|
HSR protocol for WR devices, in particular the WR-Switch to
|
|
- [ASTERICS](http://www.asterics2020.eu/) - The Astronomy ESFRI and Research Infrastructure Cluster. EU H2020 project.
|
|
increase availability and avoid single point of failure for time
|
|
- [Cleopatra](http://www.asterics2020.eu/cleopatra.html) - Connecting Locations of ESFRI Observatories and Partners in Astronomy for Timing and Real-time Alerts
|
|
and data distribution. This work has been done in the framework
|
|
- [_Connecting multi-messenger astrophysics R&D in ASTERICS and nanosecond timing in normal life_](http://www.astron.nl/eunl16/Documents/EUNL2016-Connecting_multi_messenger.pdf) - Presented at [The connecting strength of Big Science Projects](http://www.astron.nl/eunl16/programme.php) conference, June 2016
|
|
of the European ARTEMIS JU EMC2 project and involves the
|
|
- [Electrical-Optical / Optical-Electrical - EO/OE - Calibration](https://www.ohwr.org/project/wr-calibration/wikis/eo-oe-calibration)
|
|
development of the Peer-2-Peer mechanism for clock propagation,
|
|
|
|
PeerDelay for the delay measurement, the utilization of HSR tags
|
|
|
|
in frames, and the Switch-over mechanism developed by CERN to
|
|
|
|
recover from a node failure. Current progress and more
|
|
|
|
information can be found at the OHWR [WR-HSR
|
|
|
|
webpage](https://www.ohwr.org/project/wr-hsr/wiki).
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [ASTERICS](http://www.asterics2020.eu/) - The Astronomy ESFRI and
|
|
|
|
Research Infrastructure Cluster. EU H2020 project.
|
|
|
|
- [Cleopatra](http://www.asterics2020.eu/cleopatra.html) -
|
|
|
|
Connecting Locations of ESFRI Observatories and Partners in
|
|
|
|
Astronomy for Timing and Real-time Alerts
|
|
|
|
- [*Connecting multi-messenger astrophysics R\&D in ASTERICS and
|
|
|
|
nanosecond timing in normal
|
|
|
|
life*](http://www.astron.nl/eunl16/Documents/EUNL2016-Connecting_multi_messenger.pdf)
|
|
|
|
- Presented at [The connecting strength of Big Science
|
|
|
|
Projects](http://www.astron.nl/eunl16/programme.php)
|
|
|
|
conference, June 2016
|
|
|
|
- [Electrical-Optical / Optical-Electrical - EO/OE -
|
|
|
|
Calibration](https://www.ohwr.org/project/wr-calibration/wikis/eo-oe-calibration)
|
|
|
|
- ASTERICS project:
|
|
- ASTERICS project:
|
|
- [All deliverables](https://www.asterics2020.eu/documents)
|
|
- [All deliverables](https://www.asterics2020.eu/documents)
|
|
- [Harsh Environmental White Rabbit Equipment Tests](https://www.asterics2020.eu/sites/default/files/documents/asterics-d5.3.pdf)
|
|
- [Harsh Environmental White Rabbit Equipment Tests](https://www.asterics2020.eu/sites/default/files/documents/asterics-d5.3.pdf)
|
|
- [T&F transfer through SURFnet8](https://www.asterics2020.eu/sites/default/files/documents/asterics-d5.7.pdf)
|
|
- [T&F transfer through SURFnet8](https://www.asterics2020.eu/sites/default/files/documents/asterics-d5.7.pdf)
|
|
- [VLBI using WR synchronization](https://www.asterics2020.eu/sites/default/files/documents/asterics-d5.14.pdf)
|
|
- [VLBI using WR synchronization](https://www.asterics2020.eu/sites/default/files/documents/asterics-d5.14.pdf)
|
|
|
|
|
|
- [TIMEFUNC](https://www.euramet.org/research-innovation/search-research-projects/details/project/time-synchronisation-impact-enabling-future-network-communication/?L=0&tx_eurametctcp_project%5Baction%5D=show&tx_eurametctcp_project%5Bcontroller%5D=Project&cHash=c5b02a3d44ac99d07d9cfa1844daca6a) - Time Synchronisation Impact Enabling Future Network Communication
|
|
- [TIMEFUNC](https://www.euramet.org/research-innovation/search-research-projects/details/project/time-synchronisation-impact-enabling-future-network-communication/?L=0&tx_eurametctcp_project%5Baction%5D=show&tx_eurametctcp_project%5Bcontroller%5D=Project&cHash=c5b02a3d44ac99d07d9cfa1844daca6a) - Time Synchronisation Impact Enabling Future Network Communication
|
|
- [Best Practice Guide](https://www.vsl.nl/over-vsl/publicaties/white-rabbit-good-practice-guide)
|
|
- [Best Practice Guide](https://www.vsl.nl/over-vsl/publicaties/white-rabbit-good-practice-guide)
|
|
|
|
- [DEMETRA - Demonstrator of EGNSS Services based on Time Reference Architecture](https://www.demetratime.eu)
|
|
|
|
- [Time & Frequency Distribution over Optical link](https://www.demetratime.eu/timeservice/7) - _An accuracy beyond the GPS level can be achieved through open source techniques (White Rabbit)_
|
|
<!-- end list -->
|
|
- [DEMonstrator of EGNSS services based on Time Reference Architecture](http://rime.inrim.it/H2020-Demetra/)
|
|
|
|
- EU SME INSTRUMENT grant (number [640658](http://cordis.europa.eu/search/result_en?q=640658)), in the framework of the H2020-EU.2.1.6. - INDUSTRIAL LEADERSHIP
|
|
- [DEMETRA - Demonstrator of EGNSS Services based on Time Reference
|
|
- Leadership in enabling and industrial technologies – Space.
|
|
Architecture](https://www.demetratime.eu)
|
|
- [EMPIR](http://empir.npl.co.uk/) - European Metrology Programme for Innovation and Research
|
|
- [Time & Frequency Distribution over Optical
|
|
- [WRITE:](http://empir.npl.co.uk/write/) White Rabbit Industrial Timing Enhancement (SRT-i26: Selected Research Topic, was JRP-i26)
|
|
link](https://www.demetratime.eu/timeservice/7) - *An accuracy
|
|
- WP1: Scalable calibration techniques for PTP WR fibre links
|
|
beyond the GPS level can be achieved through open source
|
|
- WP2: Resilient and redundant time transfer
|
|
techniques (White Rabbit)*
|
|
- WP3: Improving the performance of White Rabbit
|
|
- [DEMonstrator of EGNSS services based on Time Reference
|
|
- WP4: WR UTC time and frequency distribution for industrial users
|
|
Architecture](http://rime.inrim.it/H2020-Demetra/)
|
|
|
|
- EU SME INSTRUMENT grant (number
|
|
|
|
[640658](http://cordis.europa.eu/search/result_en?q=640658)),
|
|
|
|
in the framework of the H2020-EU.2.1.6. - INDUSTRIAL LEADERSHIP
|
|
|
|
- Leadership in enabling and industrial technologies – Space.
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [EMPIR](http://empir.npl.co.uk/) - European Metrology Programme for
|
|
|
|
Innovation and Research
|
|
|
|
- [WRITE:](http://empir.npl.co.uk/write/) White Rabbit Industrial
|
|
|
|
Timing Enhancement (SRT-i26: Selected Research Topic, was
|
|
|
|
JRP-i26)
|
|
|
|
- WP1: Scalable calibration techniques for PTP WR fibre links
|
|
|
|
- WP2: Resilient and redundant time transfer
|
|
|
|
- WP3: Improving the performance of White Rabbit
|
|
|
|
- WP4: WR UTC time and frequency distribution for industrial
|
|
|
|
users
|
|
|
|
|
|
|
|
* JRP S15 Optical frequency transfer - a European network
|
|
* JRP S15 Optical frequency transfer - a European network
|
|
|
|
|
|
*\* [Selected Research Topic
|
|
\*\* [Selected Research Topic S15](http://msu.euramet.org/si_broader_scope_2015/SRTs/SRT-s15.pdf).
|
|
S15](http://msu.euramet.org/si_broader_scope_2015/SRTs/SRT-s15.pdf).
|
|
|
|
|
|
\*\* Looking for partners (deadline 5 October 2015)
|
|
*\* Looking for partners (deadline 5 October 2015)
|
|
|
|
|
|
- [EMRP](http://www.euramet.org/) - European Association of National Metrology Institutes
|
|
- [EMRP](http://www.euramet.org/) - European Association of National
|
|
- The EMRP is jointly funded by the EMRP participating countries within EURAMET and the European Union ([912/2009/EC](http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32009D0912)).
|
|
Metrology Institutes
|
|
- [NEAT-FT](http://www.ptb.de/emrp/neatft_home.html) Finished (Nov. 2012 - May 2015)
|
|
- The EMRP is jointly funded by the EMRP participating countries
|
|
- [Project summaries](http://www.ptb.de/emrp/neatft_project.html)
|
|
within EURAMET and the European Union
|
|
- \_The aim of the project NEAT-FT is to investigate new techniques for phase-coherent comparison of remotely located optical clocks, separated by distances of up to 1500 km using optical fibre links. Within the scope of the JRP the equipment necessary for reliable operation of fibre links will be developed and all technological steps towards a full optical link infrastructure demonstrated.\
|
|
([912/2009/EC](http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32009D0912)).
|
|
Beside frequency dissemination, **new techniques for time transfer over optical fibre networks will be investigated in order to provide better timing signals than currently available with GPS receivers**. For typical spans of up to 100 km the JRP aims to improve the accuracy down to about 100 ps. Furthermore, the feasibility of a European fibre network connecting optical clocks in Europe will be studied in close collaboration with potential fibre providers.\_
|
|
- [NEAT-FT](http://www.ptb.de/emrp/neatft_home.html) Finished
|
|
- Extract of SIB-02 NEAT-FT final Newsletter:\
|
|
(Nov. 2012 - May 2015)
|
|
_Following a recommendation of the international advisory board to investigate the possibility of a time link between radio-observatories at Metsähovi (Finland) and Onsala (Sweden) a study on feasibility of a standard uni-directional network for long-haul timing dissemination using PTP-WR (Precision time Protocol- White Rabbit) was initiated. We have focused on **long distance testing of White Rabbit equipment**. A test link of about 1000 km distance between MIKES sites at Espoo and Kajaani has been set-up. This was achieved in close collaboration with the Centre for Scientific Computing Ltd. (CSC), the Finnish University Network and CERN, with support by VSL and SP. In a 120 day comparison between GPS-PPP time transfer and the 1000-km long link White Rabbit time link in a live DWDM network, the performance and reliability of the fibre link were found to be excellent where the results were limited by the statistics of the GPS–PPP link._
|
|
- [Project
|
|
- Some participants using WR: MIKES, VSL, Vrije Universiteit Amsterdam
|
|
summaries](http://www.ptb.de/emrp/neatft_project.html)
|
|
- [EUREKA](http://www.eurekanetwork.org/) [Project 7634 RunRabbit](http://www.eurekanetwork.org/project/id/7634)
|
|
- \_The aim of the project NEAT-FT is to investigate new
|
|
- Status: Finished - 14-January-2015
|
|
techniques for phase-coherent comparison of remotely located
|
|
- [Project Outline](http://www.runrabbit.eu/?page_id=96)
|
|
optical clocks, separated by distances of up to 1500 km
|
|
- [Projekt dedykowanej płytki systemu RunRabbit](http://www.runrabbit.eu/?page_id=42) (Polish only)
|
|
using optical fibre links. Within the scope of the JRP the
|
|
- [Projekt stosu IEEE1588/White Rabbit](http://www.runrabbit.eu/?page_id=26) (Polish only)
|
|
equipment necessary for reliable operation of fibre links
|
|
- _The RunRabbit project does not seem to be Open: source files are not published._
|
|
will be developed and all technological steps towards a full
|
|
- [European Commission](https://ec.europa.eu/info/index_en)
|
|
optical link infrastructure demonstrated.
|
|
- [White Rabbit - Open Science Monitor Case Study](https://ec.europa.eu/info/files/white-rabbit_en), European Commission, Directorate-General for Research and Innovation, 2018
|
|
Beside frequency dissemination, **new techniques for time
|
|
- [NAVISP](https://navisp.esa.int/) (ESA)
|
|
transfer over optical fibre networks will be investigated in
|
|
- [TOWR (pronounced _tower_) is the development of a time distribution service via optical fibre over the Madrid region](https://navisp.esa.int/project/details/36/show)
|
|
order to provide better timing signals than currently
|
|
- [_TOWR: A Time Service over White Rabbit for the Region of Madrid_](https://ohwr.org/project/white-rabbit/uploads/82947a5cb9f812e26dcdf201be104d0d/TOWR_prez_WR-workshop-2018.pdf), Presented at [WR workshop 2018](/oct2018meeting)
|
|
available with GPS receivers**. For typical spans of up to
|
|
- [SCPTime](https://www.scptime.com/en/) (France)
|
|
100 km the JRP aims to improve the accuracy down to about
|
|
- Collaborative research project has been approved by the Grand Investments Commission within the scope of the Investissements d’Avenir program and signed by the French Prime Minister on June 2nd 2014. This project is partially financed by BPIFrance (big collaborative projects) and has been certified by Minalogic.
|
|
100 ps. Furthermore, the feasibility of a European fibre
|
|
- SCPTime sets up an infrastructure and a service to broadcast the legal time of a country with a Secured Certified Precise and Traceable time signal.
|
|
network connecting optical clocks in Europe will be studied
|
|
- [Secured Time Synchronization - White Paper](http://www.tyleos.com/wp-content/uploads/SCPTime/White-Book-SCPTime-web.pdf) (05/2017)
|
|
in close collaboration with potential fibre providers.\_
|
|
- [TIGRIS](http://sevensols.com/index.php?seccion=1400&subseccion=1451&lang=en)
|
|
- Extract of SIB-02 NEAT-FT final Newsletter:
|
|
- Total Integrated GRid Intelligent System
|
|
*Following a recommendation of the international advisory
|
|
- Integrated and secure “Smart Grid” solution for the electrical network. Finished (2013-2015)
|
|
board to investigate the possibility of a time link between
|
|
- Uses the [FMC ADC board](https://www.ohwr.org/project/fmc-adc-100m14b4cha/wiki) to access analog signals. Connected to a Rogowski coil that performs the detection and time tagging of events in the electrical grid.
|
|
radio-observatories at Metsähovi (Finland) and Onsala
|
|
- [WORLDTIMING](http://sevensols.com/index.php/project/world-timing/) (Ultra accurate world timing services)
|
|
(Sweden) a study on feasibility of a standard
|
|
- EU SME INSTRUMENT grant (number [673403](http://cordis.europa.eu/project/rcn/196501_en.html)), awarded to Seven Solutions in the framework of the Space calls.
|
|
uni-directional network for long-haul timing dissemination
|
|
- [XIA](https://www.xia.com/), USA
|
|
using PTP-WR (Precision time Protocol- White Rabbit) was
|
|
- Supported by the US Department of Energy
|
|
initiated. We have focused on **long distance testing of
|
|
- [XIA Products Utilize Precision Timing Protocol and Network Synchronization](https://www.xia.com/xia-products-utilize-precision-timing-protocol-and-network-synchronization.html), (12/2018)
|
|
White Rabbit equipment**. A test link of about 1000 km
|
|
- [Network Time Synchronization of the Readout Electronics for a New Radioactive Gas Detection System](https://www.xia.com/wp-content/uploads/2018/12/RT18_NTSposter.pdf) (Poster at RT2018 conference)
|
|
distance between MIKES sites at Espoo and Kajaani has been
|
|
|
|
set-up. This was achieved in close collaboration with the
|
|
---
|
|
Centre for Scientific Computing Ltd. (CSC), the Finnish
|
|
|
|
University Network and CERN, with support by VSL and SP. In
|
|
|
|
a 120 day comparison between GPS-PPP time transfer and the
|
|
|
|
1000-km long link White Rabbit time link in a live DWDM
|
|
|
|
network, the performance and reliability of the fibre link
|
|
|
|
were found to be excellent where the results were limited by
|
|
|
|
the statistics of the GPS–PPP link.*
|
|
|
|
- Some participants using WR: MIKES, VSL, Vrije Universiteit
|
|
|
|
Amsterdam
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [EUREKA](http://www.eurekanetwork.org/) [Project 7634
|
|
|
|
RunRabbit](http://www.eurekanetwork.org/project/id/7634)
|
|
|
|
- Status: Finished - 14-January-2015
|
|
|
|
- [Project Outline](http://www.runrabbit.eu/?page_id=96)
|
|
|
|
- [Projekt dedykowanej płytki systemu
|
|
|
|
RunRabbit](http://www.runrabbit.eu/?page_id=42) (Polish only)
|
|
|
|
- [Projekt stosu IEEE1588/White
|
|
|
|
Rabbit](http://www.runrabbit.eu/?page_id=26) (Polish only)
|
|
|
|
- *The RunRabbit project does not seem to be Open: source files
|
|
|
|
are not published.*
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [European Commission](https://ec.europa.eu/info/index_en)
|
|
|
|
- [White Rabbit - Open Science Monitor Case
|
|
|
|
Study](https://ec.europa.eu/info/files/white-rabbit_en),
|
|
|
|
European Commission, Directorate-General for Research and
|
|
|
|
Innovation, 2018
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [NAVISP](https://navisp.esa.int/) (ESA)
|
|
|
|
- [TOWR (pronounced *tower*) is the development of a time
|
|
|
|
distribution service via optical fibre over the Madrid
|
|
|
|
region](https://navisp.esa.int/project/details/36/show)
|
|
|
|
- [*TOWR: A Time Service over White Rabbit for the Region of
|
|
|
|
Madrid*](https://ohwr.org/project/white-rabbit/uploads/82947a5cb9f812e26dcdf201be104d0d/TOWR_prez_WR-workshop-2018.pdf),
|
|
|
|
Presented at [WR workshop 2018](/oct2018meeting)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [SCPTime](https://www.scptime.com/en/) (France)
|
|
|
|
- Collaborative research project has been approved by the Grand
|
|
|
|
Investments Commission within the scope of the Investissements
|
|
|
|
d’Avenir program and signed by the French Prime Minister on
|
|
|
|
June 2nd 2014. This project is partially financed by BPIFrance
|
|
|
|
(big collaborative projects) and has been certified by
|
|
|
|
Minalogic.
|
|
|
|
- SCPTime sets up an infrastructure and a service to broadcast the
|
|
|
|
legal time of a country with a Secured Certified Precise and
|
|
|
|
Traceable time signal.
|
|
|
|
- [Secured Time Synchronization - White
|
|
|
|
Paper](http://www.tyleos.com/wp-content/uploads/SCPTime/White-Book-SCPTime-web.pdf)
|
|
|
|
(05/2017)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [TIGRIS](http://sevensols.com/index.php?seccion=1400&subseccion=1451&lang=en)
|
|
|
|
- Total Integrated GRid Intelligent System
|
|
|
|
- Integrated and secure “Smart Grid” solution for the electrical
|
|
|
|
network. Finished (2013-2015)
|
|
|
|
- Uses the [FMC ADC
|
|
|
|
board](https://www.ohwr.org/project/fmc-adc-100m14b4cha/wiki) to
|
|
|
|
access analog signals. Connected to a Rogowski coil that
|
|
|
|
performs the detection and time tagging of events in the
|
|
|
|
electrical grid.
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [WORLDTIMING](http://sevensols.com/index.php/project/world-timing/)
|
|
|
|
(Ultra accurate world timing services)
|
|
|
|
- EU SME INSTRUMENT grant (number
|
|
|
|
[673403](http://cordis.europa.eu/project/rcn/196501_en.html)),
|
|
|
|
awarded to Seven Solutions in the framework of the Space calls.
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [XIA](https://www.xia.com/), USA
|
|
|
|
- Supported by the US Department of Energy
|
|
|
|
- [XIA Products Utilize Precision Timing Protocol and Network
|
|
|
|
Synchronization](https://www.xia.com/xia-products-utilize-precision-timing-protocol-and-network-synchronization.html),
|
|
|
|
(12/2018)
|
|
|
|
- [Network Time Synchronization of the Readout Electronics for a
|
|
|
|
New Radioactive Gas Detection
|
|
|
|
System](https://www.xia.com/wp-content/uploads/2018/12/RT18_NTSposter.pdf)
|
|
|
|
(Poster at RT2018 conference)
|
|
|
|
|
|
|
|
-----
|
|
|
|
|
|
|
|
## Projects requesting public funds
|
|
## Projects requesting public funds
|
|
|
|
|
|
### Horizon 2020 fetopen
|
|
### Horizon 2020 fetopen
|
|
|
|
|
|
- Improving the short term stability of the output clock (Seven
|
|
- Improving the short term stability of the output clock (Seven Solutions, UGR, June 2014)
|
|
Solutions, UGR, June 2014)
|
|
- [EMPIR](http://msu.euramet.org/) Call 2014 – Industry and Research Potential
|
|
|
|
- SRT-i32 - [_Next generation time and frequency dissemination through optical fibres_](http://msu.euramet.org/industry_2014/SRTs/SRT-i32.pdf)
|
|
<!-- end list -->
|
|
- available via [Stage 2 of Call 2014](http://msu.euramet.org/industry_2014/)
|
|
|
|
- The EMPIR proposal is work-in-progress currently and it will be submitted early October 2014. (Sept.2014)
|
|
- [EMPIR](http://msu.euramet.org/) Call 2014 – Industry and Research
|
|
- About 20 participants, half National Metrological Institues and half Industries/Academics.
|
|
Potential
|
|
- _White Rabbit will definitively be one of the main techniques involved in the project._
|
|
- SRT-i32 - [*Next generation time and frequency dissemination
|
|
|
|
through optical
|
|
|
|
fibres*](http://msu.euramet.org/industry_2014/SRTs/SRT-i32.pdf)
|
|
|
|
- available via [Stage 2 of
|
|
|
|
Call 2014](http://msu.euramet.org/industry_2014/)
|
|
|
|
- The EMPIR proposal is work-in-progress currently and it will be
|
|
|
|
submitted early October 2014. (Sept.2014)
|
|
|
|
- About 20 participants, half National Metrological Institues and
|
|
|
|
half Industries/Academics.
|
|
|
|
- *White Rabbit will definitively be one of the main techniques
|
|
|
|
involved in the project.*
|
|
|
|
|
|
|
|
-----
|
|
---
|
|
|
|
|
|
## Thinking
|
|
## Thinking
|
|
|
|
|
|
- [SuperB](http://superb.infn.it), Italy
|
|
- [SuperB](http://superb.infn.it), Italy
|
|
- [LNLS](http://www.lnls.br/) (Brazilian Synchrotron Light
|
|
- [LNLS](http://www.lnls.br/) (Brazilian Synchrotron Light Laboratory), Brazil
|
|
Laboratory), Brazil
|
|
- using WR for the fast orbit feedback and for the timing system of [Sirius](http://www.lnls.br/blog/2011/10/24/sirius-new-brazilian-synchrotron-light-source/).
|
|
- using WR for the fast orbit feedback and for the timing system
|
|
- [TOTEM experiment](http://totem-experiment.web.cern.ch/totem-experiment/) at CERN
|
|
of
|
|
- Accurate timng for the Roman Pot detector (June 2013, W.Snoeys)
|
|
[Sirius](http://www.lnls.br/blog/2011/10/24/sirius-new-brazilian-synchrotron-light-source/).
|
|
|
|
- [TOTEM
|
|
|
|
experiment](http://totem-experiment.web.cern.ch/totem-experiment/)
|
|
|
|
at CERN
|
|
|
|
- Accurate timng for the Roman Pot detector (June 2013, W.Snoeys)
|
|
|
|
|
|
|
|
-----
|
|
---
|
|
|
|
|
|
## See also
|
|
## See also
|
|
|
|
|
|
- [White Rabbit Research
|
|
- [White Rabbit Research Projects](/SummaryWRProjects#research-projects)
|
|
Projects](/SummaryWRProjects#research-projects)
|
|
- [Companies involved in White Rabbit](/WRCompanies)
|
|
- [Companies involved in White Rabbit](/WRCompanies)
|
|
|
|
|
|
|
|
-----
|
|
---
|
|
|
|
|
|
# Quotes
|
|
# Quotes
|
|
|
|
|
|
_We’re working on an End Node and have successfully completed the calibration procedure between one End Node designated the “Calibrator” and another End Node designated the “Slave”. <...>
|
|
_We’re working on an End Node and have successfully completed the calibration procedure between one End Node designated the “Calibrator” and another End Node designated the “Slave”. \<...\> These are working very well with extremely small \<50ps skew between the “Calibrator” & “Slave” after calibration with both short (2m) and very long (10km) fibres. We’re very impressed!_, UK, 21/4/21
|
|
These are working very well with extremely small <50ps skew between the “Calibrator” & “Slave” after calibration with both short (2m) and very long (10km) fibres. We’re very impressed!_, UK, 21/4/21
|
|
|
|
|
|
|
|
_I wanted to thank you for all of the tremendous information you provided the <...> folks! That was amazing and I’m sure you helped shave perhaps a year in the time they will need to start getting good data. THANK YOU._, USA, 22/3/21
|
|
_I wanted to thank you for all of the tremendous information you provided the \<...\> folks! That was amazing and I’m sure you helped shave perhaps a year in the time they will need to start getting good data. THANK YOU._, USA, 22/3/21
|
|
|
|
|
|
_This project is really amazing by the amount of work and the quality. And thank for every people helping me to understand the WR structure._, France, 15/6/20
|
|
_This project is really amazing by the amount of work and the quality. And thank for every people helping me to understand the WR structure._, France, 15/6/20
|
|
|
|
|
|
_Many thanks for your time yesterday and educating us on White Rabbit.
|
|
_Many thanks for your time yesterday and educating us on White Rabbit. I will try to find the right guys at \[our company\] – I'm sure that this function would be very valuable on our measurement instruments!_, Germany, 6/12/19
|
|
I will try to find the right guys at [our company] – I'm sure that this function would be very valuable on our measurement instruments!_, Germany, 6/12/19
|
|
|
|
|
|
|
|
|
|
|
|
_Remember when our [] friends contacted you back in July and we said that we were attempting to port WR node functionality to our system?. And you very kindly offered to let us come to CERN for help if we needed it... Anyway, now we're very happy to say "It's Working!"
|
|
|
|
We're _very_ impressed with WR :-). It certainly solves some hard problems for us. And maybe takes us to places we could never go before._, Scotland, 23/9/19
|
|
|
|
|
|
|
|
_White Rabbit has achieved a relevant impact in society if we consider
|
|
_Remember when our \[\] friends contacted you back in July and we said that we were attempting to port WR node functionality to our system?. And you very kindly offered to let us come to CERN for help if we needed it... Anyway, now we're very happy to say "It's Working!" We're very impressed with WR :-). It certainly solves some hard problems for us. And maybe takes us to places we could never go before._, Scotland, 23/9/19
|
|
that more than 30 research infrastructures and scientific projects that
|
|
|
|
have already implemented White Rabbit receive substantial public funding
|
|
|
|
from national funding, or a combination of national and EU funding. The
|
|
|
|
extra effort that CERN had to exert in order to orchestrate the
|
|
|
|
collaborative development of WR is likely inferior to the savings that
|
|
|
|
all those research infrastructures have realized when considering the
|
|
|
|
alternative scenario of each one investing in their own solution._
|
|
|
|
...
|
|
|
|
_WR is one of those examples were both organizations (GSI and CERN)
|
|
|
|
managed to optimize their resources and they successfully come up with a
|
|
|
|
technology which has been extensively re-used in diverse industry fields
|
|
|
|
showing, without a doubt, its innovational impact._
|
|
|
|
[White Rabbit - Open Science Monitor Case
|
|
|
|
Study](https://ec.europa.eu/info/files/white-rabbit_en), European
|
|
|
|
Commission, Directorate-General for Research and Innovation, 10/2018
|
|
|
|
|
|
|
|
_Time distribution across physically separate data centre modules – all
|
|
_White Rabbit has achieved a relevant impact in society if we consider that more than 30 research infrastructures and scientific projects that have already implemented White Rabbit receive substantial public funding from national funding, or a combination of national and EU funding. The extra effort that CERN had to exert in order to orchestrate the collaborative development of WR is likely inferior to the savings that all those research infrastructures have realized when considering the alternative scenario of each one investing in their own solution._ ...\
|
|
of which are a considerable distance apart from one another – is a hard
|
|
_WR is one of those examples were both organizations (GSI and CERN) managed to optimize their resources and they successfully come up with a technology which has been extensively re-used in diverse industry fields showing, without a doubt, its innovational impact._ [White Rabbit - Open Science Monitor Case Study](https://ec.europa.eu/info/files/white-rabbit_en), European Commission, Directorate-General for Research and Innovation, 10/2018
|
|
problem. The new technology allows us to discipline the clocks of our
|
|
|
|
time-stamping devices with sub-nanoseconds accuracy. We now have
|
|
|
|
visibility in our network never seen before._ (A. Lohr, Derivatives and
|
|
|
|
Cash Trading IT of Deutsche Börse, Germany,
|
|
|
|
[10/2017](https://deutsche-boerse.com/dbg-en/products-services/insights-innovation-new-technologies-en/Ultra-accurate-time-distribution-for-Deutsche-B-rse-s-trading-network-246490))
|
|
|
|
|
|
|
|
_I would like to appreciate detailed information you provided with. I
|
|
_Time distribution across physically separate data centre modules – all of which are a considerable distance apart from one another – is a hard problem. The new technology allows us to discipline the clocks of our time-stamping devices with sub-nanoseconds accuracy. We now have visibility in our network never seen before._ (A. Lohr, Derivatives and Cash Trading IT of Deutsche Börse, Germany, [10/2017](https://deutsche-boerse.com/dbg-en/products-services/insights-innovation-new-technologies-en/Ultra-accurate-time-distribution-for-Deutsche-B-rse-s-trading-network-246490))
|
|
have been surprised that all the resources on WR are freely accessible
|
|
|
|
and this mailing group is very responsive. Thanks again for your
|
|
|
|
hospitality to a newcomer. (centre for metrology, MS, KR, 6/6/2018)_
|
|
|
|
|
|
|
|
_Special thanks ... for having made possible the use of White Rabbit for
|
|
_I would like to appreciate detailed information you provided with. I have been surprised that all the resources on WR are freely accessible and this mailing group is very responsive. Thanks again for your hospitality to a newcomer. (centre for metrology, MS, KR, 6/6/2018)_
|
|
the synchronisation of Synchrotron Sources._
|
|
|
|
([GG](http://icalepcs2017.vrws.de/papers/tucpl01.pdf), France, 25/10/17)
|
|
|
|
|
|
|
|
_The stability performance of a WR-PTP link can be up to 100 times better
|
|
_Special thanks ... for having made possible the use of White Rabbit for the synchronisation of Synchrotron Sources._ ([GG](http://icalepcs2017.vrws.de/papers/tucpl01.pdf), France, 25/10/17)
|
|
than that of a high performance GNSS receiver._ [Secured Time
|
|
|
|
Synchronization - White Paper,
|
|
|
|
GT](http://www.tyleos.com/wp-content/uploads/SCPTime/White-Book-SCPTime-web.pdf)
|
|
|
|
(05/2017)
|
|
|
|
|
|
|
|
_Options for accuracy: Manual Port Configuration, Asymmetry calibration,
|
|
_The stability performance of a WR-PTP link can be up to 100 times better than that of a high performance GNSS receiver._ [Secured Time Synchronization - White Paper, GT](http://www.tyleos.com/wp-content/uploads/SCPTime/White-Book-SCPTime-web.pdf) (05/2017)
|
|
Physical layer syntonization. These are three key additions for the
|
|
|
|
White Rabbit extensions to PTP. Using these feature the clever
|
|
|
|
scientists at CERN were able to achieve sub-ns time transfer, using
|
|
|
|
standard Ethernet PHYs._
|
|
|
|
([DA](https://blog.meinbergglobal.com/2017/09/24/whats-coming-next-edition-ieee-1588/),
|
|
|
|
USA, 24/9/17)
|
|
|
|
|
|
|
|
_... our university spin-off company OPNT recently realized a
|
|
_Options for accuracy: Manual Port Configuration, Asymmetry calibration, Physical layer syntonization. These are three key additions for the White Rabbit extensions to PTP. Using these feature the clever scientists at CERN were able to achieve sub-ns time transfer, using standard Ethernet PHYs._ ([DA](https://blog.meinbergglobal.com/2017/09/24/whats-coming-next-edition-ieee-1588/), USA, 24/9/17)
|
|
successful White Rabbit implementation in the network of Vodafone
|
|
|
|
Netherlands. (...) After calibration the residual timing offset across
|
|
|
|
the 320-km-long link was found to be less than one nanosecond. See also
|
|
|
|
the [press release](http://www.opnt.nl/news/accurate-time-synchronization-in-live-network-vodafone/).
|
|
|
|
Needless to say that this result builds strongly on the outstanding work
|
|
|
|
delivered by the White Rabbit community over the past years, and we are
|
|
|
|
thankful to all of you who contributed. We are absolutely convinced that
|
|
|
|
with White Rabbit you have created a game changer that will enable
|
|
|
|
marvelous new technologies in the future\!_ (JK, The Netherlands,
|
|
|
|
9/6/17)
|
|
|
|
|
|
|
|
_The more I read about white-rabbit, the more impressed I am\!
|
|
_... our university spin-off company OPNT recently realized a successful White Rabbit implementation in the network of Vodafone Netherlands. (...) After calibration the residual timing offset across the 320-km-long link was found to be less than one nanosecond. See also the _[_press release_](http://www.opnt.nl/news/accurate-time-synchronization-in-live-network-vodafone/)_.\
|
|
You and your colleagues should rightly be very proud of your
|
|
Needless to say that this result builds strongly on the outstanding work delivered by the White Rabbit community over the past years, and we are thankful to all of you who contributed. We are absolutely convinced that with White Rabbit you have created a game changer that will enable marvelous new technologies in the future!_ (JK, The Netherlands, 9/6/17)
|
|
achievements and I appreciate that the algorithm and hardware has been
|
|
|
|
made available as open-source materials.
|
|
|
|
I have learnt much from studying the high quality documentation in the
|
|
|
|
OHWR repositories._ (S, United Kingdom, 5/5/2017)
|
|
|
|
|
|
|
|
_First of all thank you once more for the help and support your team is
|
|
_The more I read about white-rabbit, the more impressed I am!\
|
|
providing to our colleagues at Fermilab for setting up the WR network
|
|
You and your colleagues should rightly be very proud of your achievements and I appreciate that the algorithm and hardware has been made available as open-source materials.\
|
|
for distributing beam signals\!_ (AF, USA, 30/3/2017)
|
|
I have learnt much from studying the high quality documentation in the OHWR repositories._ (S, United Kingdom, 5/5/2017)
|
|
|
|
|
|
_Seismic sensors connected to spectrum analyzer in UJ16 were perfectly
|
|
_First of all thank you once more for the help and support your team is providing to our colleagues at Fermilab for setting up the WR network for distributing beam signals!_ (AF, USA, 30/3/2017)
|
|
synchronized with the same equipments at the surface thanks to BE-CO
|
|
|
|
team._ (MG, Switzerland, 12/11/2015)
|
|
|
|
|
|
|
|
_Thanks for the call and the extra information. This (level of
|
|
_Seismic sensors connected to spectrum analyzer in UJ16 were perfectly synchronized with the same equipments at the surface thanks to BE-CO team._ (MG, Switzerland, 12/11/2015)
|
|
commitment) shows the difference between a normal open source project
|
|
|
|
and a successful one._ (EH, The Netherlands, 13/10/2015)
|
|
|
|
|
|
|
|
_I'm looking into the hdl (of White Rabbit) and it's really impressive
|
|
_Thanks for the call and the extra information. This (level of commitment) shows the difference between a normal open source project and a successful one._ (EH, The Netherlands, 13/10/2015)
|
|
the work that you have done\! A milestone achievement of Open Source
|
|
|
|
(software and hardware)\!_ M.R. Italy, 28/7/2015
|
|
|
|
|
|
|
|
_The successful integration of WR PTP Core on our hardware allowed us to
|
|
_I'm looking into the hdl (of White Rabbit) and it's really impressive the work that you have done! A milestone achievement of Open Source (software and hardware)!_ M.R. Italy, 28/7/2015
|
|
choose White Rabbit as a main time distribution system._ (JINR, Russia,
|
|
|
|
7/10/14)
|
|
|
|
|
|
|
|
_Technology from advanced-physics research institute CERN will form part
|
|
_The successful integration of WR PTP Core on our hardware allowed us to choose White Rabbit as a main time distribution system._ (JINR, Russia, 7/10/14)
|
|
of National Instruments’ long-term strategy to improve the ability of
|
|
|
|
distributed systems to support real-time control. ... White Rabbit
|
|
|
|
offers a tremendous opportunity to get into the nanosecond range and we
|
|
|
|
are working intensely to bring this capability to distributed systems._
|
|
|
|
([blog(Particle-collider technology to help NI build time-aware
|
|
|
|
systems)](http://www.techdesignforums.com/blog/2014/08/09/labview-white-rabbit-distributed-real-time/)
|
|
|
|
Jim Truchard, president NI , 9/8/14)
|
|
|
|
|
|
|
|
_My knowledge about all of WR Technology and its subprojects is expanding
|
|
_Technology from advanced-physics research institute CERN will form part of National Instruments’ long-term strategy to improve the ability of distributed systems to support real-time control. ... White Rabbit offers a tremendous opportunity to get into the nanosecond range and we are working intensely to bring this capability to distributed systems._ ([blog(Particle-collider technology to help NI build time-aware systems)](http://www.techdesignforums.com/blog/2014/08/09/labview-white-rabbit-distributed-real-time/) Jim Truchard, president NI , 9/8/14)
|
|
now. I'm very glad I had the opportunity to work in such project. :),
|
|
|
|
and also to have kind friends here for continiously sharing their
|
|
|
|
knowledge._ (Arkus/Japan, 30/5/14)
|
|
|
|
|
|
|
|
_We note the excellent system reliability: not a single component of four
|
|
_My knowledge about all of WR Technology and its subprojects is expanding now. I'm very glad I had the opportunity to work in such project. :), and also to have kind friends here for continiously sharing their knowledge._ (Arkus/Japan, 30/5/14)
|
|
complete stations showed a failure over 6 months of Siberian winter
|
|
|
|
performance (at operation/storage temperatures of 0...+30C / -45...+10C,
|
|
|
|
respectively)._ ([ICRC2013
|
|
|
|
paper 1158](http://www.ifh.de/~wischnew/talks/cta/icrc2013/icrc2013-1158-final.pdf))
|
|
|
|
|
|
|
|
_We acknowledge very helpful discussions, technical advices and support
|
|
_We note the excellent system reliability: not a single component of four complete stations showed a failure over 6 months of Siberian winter performance (at operation/storage temperatures of 0...+30C / -45...+10C, respectively)._ ([ICRC2013 paper 1158](http://www.ifh.de/\~wischnew/talks/cta/icrc2013/icrc2013-1158-final.pdf))
|
|
from the White Rabbit community (in particular the CERN based team and
|
|
|
|
A. Rubini) during all phases of this project. The technical support from
|
|
|
|
both SevenSolutions and Creotech \[companies- ED\] was very helpful._
|
|
|
|
([ICRC2013
|
|
|
|
paper 1146](http://www.ifh.de/~wischnew/talks/cta/icrc2013/icrc2013-1146_final.pdf))
|
|
|
|
|
|
|
|
_It is great work that you all are doing with WhiteRabbit, very valuable
|
|
_We acknowledge very helpful discussions, technical advices and support from the White Rabbit community (in particular the CERN based team and A. Rubini) during all phases of this project. The technical support from both SevenSolutions and Creotech \[companies- ED\] was very helpful._ ([ICRC2013 paper 1146](http://www.ifh.de/\~wischnew/talks/cta/icrc2013/icrc2013-1146_final.pdf))
|
|
also outside CERN._ (centre for metrology, 25/7/13)
|
|
|
|
|
|
|
|
_The big, active and very communicative WRcommunity has made the White
|
|
_It is great work that you all are doing with WhiteRabbit, very valuable also outside CERN._ (centre for metrology, 25/7/13)
|
|
Rabbit system a well debugged and calibrated system. In particular, for
|
|
|
|
high demands on longterm precision and stability, the extensive usage
|
|
|
|
and debugging of the WR-key components make it very reliable._ ([ICRC2013
|
|
|
|
paper 1146](http://www.ifh.de/~wischnew/talks/cta/icrc2013/icrc2013-1146_final.pdf))
|
|
|
|
|
|
|
|
_Experience is excellent (\!\!)._ (DESY, 28/10/13)
|
|
_The big, active and very communicative WRcommunity has made the White Rabbit system a well debugged and calibrated system. In particular, for high demands on longterm precision and stability, the extensive usage and debugging of the WR-key components make it very reliable._ ([ICRC2013 paper 1146](http://www.ifh.de/\~wischnew/talks/cta/icrc2013/icrc2013-1146_final.pdf))
|
|
|
|
|
|
-----
|
|
_Experience is excellent (!!)._ (DESY, 28/10/13)
|
|
|
|
|
|
22 April 2021
|
|
---
|
|
|
|
|
|
|
|
22 April 2021 |
|
|
|
\ No newline at end of file |