... | @@ -26,9 +26,9 @@ |
... | @@ -26,9 +26,9 @@ |
|
- [General Machine Timing System at
|
|
- [General Machine Timing System at
|
|
FAIR](https://www-acc.gsi.de/wikis/Timing/WebHome)
|
|
FAIR](https://www-acc.gsi.de/wikis/Timing/WebHome)
|
|
- Requires a few thousand receiver nodes
|
|
- Requires a few thousand receiver nodes
|
|
- PCaPAC 2012, Kolkata, India (4-7 December 2012): [The New White
|
|
- [Timing System
|
|
Rabbit Based Timing System for the FAIR
|
|
Documents](https://www-acc.gsi.de/wikis/Timing/TimingSystemDocuments)
|
|
Facility](https://www-acc.gsi.de/wikis/pub/Timing/TimingSystemDocuments/pcapac_db_v0.5.pdf)
|
|
(papers, technical documents)
|
|
- LHAASO ([Tsinghua University,
|
|
- LHAASO ([Tsinghua University,
|
|
China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
... | @@ -154,5 +154,5 @@ |
... | @@ -154,5 +154,5 @@ |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
16 April 2013
|
|
24 May 2013
|
|
|
|
|