... | @@ -62,6 +62,17 @@ |
... | @@ -62,6 +62,17 @@ |
|
nodes) in Tibet using
|
|
nodes) in Tibet using
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
(Sept.2012)
|
|
(Sept.2012)
|
|
|
|
- LHAASO has confirmed using WR for all detectors, including WCDA.
|
|
|
|
*The total nodes increased to 7344 via 583 WR switches.* Four
|
|
|
|
subsystems should be separated via VLAN, and the [redundancy
|
|
|
|
configurations similar to
|
|
|
|
CERN](https://www.ohwr.org/project/white-rabbit/wikis/Documents/White-Rabbit-CERN-Control-and-Timing-Network) should be applied.
|
|
|
|
(Jan.2013)
|
|
|
|
- Will present in February 2013 [*A Packet-based Precise Timing
|
|
|
|
and Synchronous DAQ Network for LHAASO
|
|
|
|
Project*](https://indico.cern.ch/contributionDisplay.py?contribId=195&confId=186337)
|
|
|
|
at [13th Vienna Conference on Instrumentation -
|
|
|
|
VCI2013](http://vci.hephy.at/)
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- [SuperGPS through optical
|
|
- [SuperGPS through optical
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
... | | ... | |