... | @@ -29,6 +29,45 @@ |
... | @@ -29,6 +29,45 @@ |
|
- PCaPAC 2012, Kolkata, India (4-7 December 2012): [The New White
|
|
- PCaPAC 2012, Kolkata, India (4-7 December 2012): [The New White
|
|
Rabbit Based Timing System for the FAIR
|
|
Rabbit Based Timing System for the FAIR
|
|
Facility](https://www-acc.gsi.de/wikis/pub/Timing/TimingSystemDocuments/pcapac_db_v0.5.pdf)
|
|
Facility](https://www-acc.gsi.de/wikis/pub/Timing/TimingSystemDocuments/pcapac_db_v0.5.pdf)
|
|
|
|
- LHAASO ([Tsinghua University,
|
|
|
|
China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
|
|
Observation) project Deploying 10,000 detectors over 1 square km
|
|
|
|
at Tibet.
|
|
|
|
- The LHAASO WR timing distribution plan consists of *4 layers of
|
|
|
|
WR switches (583 in total) covering 7344 nodes* of KM2A and WCDA
|
|
|
|
detectors. It will provide both a timing link and synchronous
|
|
|
|
data acquisition network to every detector front-end for a
|
|
|
|
trigger-less scheme. Four subsystems should be separated via
|
|
|
|
VLAN, and the [redundancy configurations similar to
|
|
|
|
CERN](https://www.ohwr.org/project/white-rabbit/wikis/Documents/White-Rabbit-CERN-Control-and-Timing-Network) should be applied.
|
|
|
|
For 2013 it is planned to deploy a small portion of array (40-50
|
|
|
|
nodes) in Tibet using
|
|
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
|
|
(Jan.2013)
|
|
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
|
|
|
FMC card.
|
|
|
|
- [WR@THU homepage](http://epics.ep.tsinghua.edu.cn/trac/wr)
|
|
|
|
(Chinese only)
|
|
|
|
- Presentations
|
|
|
|
- [*A Packet-based Precise Timing and Synchronous DAQ Network
|
|
|
|
for LHAASO
|
|
|
|
Project*](https://indico.cern.ch/contributionDisplay.py?contribId=195&confId=186337)
|
|
|
|
at [13th Vienna Conference on Instrumentation -
|
|
|
|
VCI2013](http://vci.hephy.at/)
|
|
|
|
- [*Distributed Timing System & Applications - White Rabbit in
|
|
|
|
Tsinghua*](http://epics.ep.tsinghua.edu.cn/wr_thu/)
|
|
|
|
(Dec.2012)
|
|
|
|
- *Sub-nanosecond Timing System Design and Development for
|
|
|
|
LHAASO Project*
|
|
|
|
[Slides](http://accelconf.web.cern.ch/AccelConf/icalepcs2011/talks/webhmult04_talk.pdf),
|
|
|
|
[Article](http://accelconf.web.cern.ch/accelconf/icalepcs2011/papers/webhmult04.pdf):
|
|
|
|
[ICALEPCS 2011 conference](http://icalepcs2011.esrf.eu)
|
|
|
|
- [*A Future Project at Tibet: The Large High Altitude Air
|
|
|
|
Shower Observatory
|
|
|
|
-LHAASO*](http://icrc2009.uni.lodz.pl/proc/pdf/icrc1168.pdf)
|
|
|
|
(general article about LHAASO)
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en)
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en)
|
|
- After an extensive study, White Rabbit has been chosen as the
|
|
- After an extensive study, White Rabbit has been chosen as the
|
|
most promising option for the synchronization network at ESS
|
|
most promising option for the synchronization network at ESS
|
... | @@ -41,44 +80,6 @@ |
... | @@ -41,44 +80,6 @@ |
|
([SPEXI](https://www.ohwr.org/project/spexi/wiki)) which is the
|
|
([SPEXI](https://www.ohwr.org/project/spexi/wiki)) which is the
|
|
most suitable platform for the integration of White Rabbit into
|
|
most suitable platform for the integration of White Rabbit into
|
|
ESS Bilbao's general control system. (Oct.2012)
|
|
ESS Bilbao's general control system. (Oct.2012)
|
|
- LHAASO ([Tsinghua University,
|
|
|
|
China](http://www.tsinghua.edu.cn/publish/then/index.html))
|
|
|
|
- Timing system of LHAASO (Large High Altitude Air Shower
|
|
|
|
Observation) project Deploying 10,000 detectors over 1 square km
|
|
|
|
at Tibet.
|
|
|
|
- [*A Packet-based Precise Timing and Synchronous DAQ Network for
|
|
|
|
LHAASO
|
|
|
|
Project*](https://indico.cern.ch/contributionDisplay.py?contribId=195&confId=186337)
|
|
|
|
at [13th Vienna Conference on Instrumentation -
|
|
|
|
VCI2013](http://vci.hephy.at/)
|
|
|
|
- [A Future Project at Tibet: The Large High Altitude Air Shower
|
|
|
|
Observatory
|
|
|
|
(LHAASO)](http://icrc2009.uni.lodz.pl/proc/pdf/icrc1168.pdf)
|
|
|
|
- *Sub-nanosecond Timing System Design and Development for
|
|
|
|
LHAASO Project*
|
|
|
|
[Slides](http://accelconf.web.cern.ch/AccelConf/icalepcs2011/talks/webhmult04_talk.pdf),
|
|
|
|
[Article](http://accelconf.web.cern.ch/accelconf/icalepcs2011/papers/webhmult04.pdf):
|
|
|
|
[ICALEPCS 2011 conference](http://icalepcs2011.esrf.eu)
|
|
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
|
|
|
FMC card.
|
|
|
|
- The LHAASO project has passed the technical review on the WR
|
|
|
|
timing distribution plan consists of *4 layers of WR switches
|
|
|
|
(461 in total) covering 6880 nodes* of KM2A. It would be able to
|
|
|
|
provide both a timing link and synchronous data acquisition
|
|
|
|
network to every detector front-end for a trigger-less scheme.
|
|
|
|
For 2013 it is planned to deploy a small portion of array (40-50
|
|
|
|
nodes) in Tibet using
|
|
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
|
|
(Sept.2012)
|
|
|
|
- LHAASO has confirmed using WR for all detectors, including WCDA.
|
|
|
|
*The total nodes increased to 7344 via 583 WR switches.* Four
|
|
|
|
subsystems should be separated via VLAN, and the [redundancy
|
|
|
|
configurations similar to
|
|
|
|
CERN](https://www.ohwr.org/project/white-rabbit/wikis/Documents/White-Rabbit-CERN-Control-and-Timing-Network) should be applied.
|
|
|
|
(Jan.2013)
|
|
|
|
- [WR@THU homepage](http://epics.ep.tsinghua.edu.cn/trac/wr)
|
|
|
|
(Chinese only)
|
|
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- [SuperGPS through optical
|
|
- [SuperGPS through optical
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
... | | ... | |