... | @@ -57,6 +57,18 @@ |
... | @@ -57,6 +57,18 @@ |
|
- [First Results from the HiSCORE/Siberia WR-setup; plans for
|
|
- [First Results from the HiSCORE/Siberia WR-setup; plans for
|
|
CTA](https://www.ohwr.org/project/white-rabbit/uploads/e29dee4b4458916fd593b55c875e2585/Martin-HiScore.pdf),
|
|
CTA](https://www.ohwr.org/project/white-rabbit/uploads/e29dee4b4458916fd593b55c875e2585/Martin-HiScore.pdf),
|
|
Martin Brückner
|
|
Martin Brückner
|
|
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en)
|
|
|
|
- After an extensive study, White Rabbit has been chosen as the
|
|
|
|
most promising option for the synchronization network at ESS
|
|
|
|
Bilbao, a light ion linear accelerator. Therefore, first
|
|
|
|
[SPEC](https://www.ohwr.org/project/spec/wiki) to SPEC tests
|
|
|
|
have been performed. Now, with a [White Rabbit switch](/Switch)
|
|
|
|
a new set up will be tested to provide synchronization signals
|
|
|
|
for ESS Bilbao's hydrogen positive ion source (ISHP) in the near
|
|
|
|
future. For 2013 ESS Bilbao is planning to test PXI SPECs
|
|
|
|
([SPEXI](https://www.ohwr.org/project/spexi/wiki)) which is the
|
|
|
|
most suitable platform for the integration of White Rabbit into
|
|
|
|
ESS Bilbao's general control system. (Oct.2012)
|
|
- [GSI Helmholtzzentrum für Schwerionenforschung
|
|
- [GSI Helmholtzzentrum für Schwerionenforschung
|
|
GmbH](https://www.gsi.de)
|
|
GmbH](https://www.gsi.de)
|
|
- [General Machine Timing System at
|
|
- [General Machine Timing System at
|
... | @@ -105,18 +117,12 @@ |
... | @@ -105,18 +117,12 @@ |
|
Shower Observatory
|
|
Shower Observatory
|
|
-LHAASO*](http://icrc2009.uni.lodz.pl/proc/pdf/icrc1168.pdf)
|
|
-LHAASO*](http://icrc2009.uni.lodz.pl/proc/pdf/icrc1168.pdf)
|
|
(general article about LHAASO)
|
|
(general article about LHAASO)
|
|
- [ESS Bilbao](http://essbilbao.org:8080/ESSBilbao/en)
|
|
- [MIKES](http://www.mikes.fi/Default.aspx) (Centre for metrology and
|
|
- After an extensive study, White Rabbit has been chosen as the
|
|
accreditation, Finland) (April 2013)
|
|
most promising option for the synchronization network at ESS
|
|
- [Evaluating WR for comparison and synchronization of
|
|
Bilbao, a light ion linear accelerator. Therefore, first
|
|
geographically distant atomic
|
|
[SPEC](https://www.ohwr.org/project/spec/wiki) to SPEC tests
|
|
clocks](https://www.ohwr.org/project/white-rabbit/uploads/c6b0314e91a7ce93ad556ee7afaeaa47/MIKES-CSC_WR_time_link.pdf)
|
|
have been performed. Now, with a [White Rabbit switch](/Switch)
|
|
- 1000 km (thousand kilometer) link up and running\! (12/8/2013)
|
|
a new set up will be tested to provide synchronization signals
|
|
|
|
for ESS Bilbao's hydrogen positive ion source (ISHP) in the near
|
|
|
|
future. For 2013 ESS Bilbao is planning to test PXI SPECs
|
|
|
|
([SPEXI](https://www.ohwr.org/project/spexi/wiki)) which is the
|
|
|
|
most suitable platform for the integration of White Rabbit into
|
|
|
|
ESS Bilbao's general control system. (Oct.2012)
|
|
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- [SuperGPS through optical
|
|
- [SuperGPS through optical
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
|
networks](http://www.nat.vu.nl/~koel/SuperGPS.html)
|
... | @@ -126,6 +132,7 @@ |
... | @@ -126,6 +132,7 @@ |
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3)
|
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3)
|
|
) - [Slides of
|
|
) - [Slides of
|
|
plans](https://www.ohwr.org/project/white-rabbit/uploads/40120120076ce7618e8a88d410350e95/130715_VSL.pdf).
|
|
plans](https://www.ohwr.org/project/white-rabbit/uploads/40120120076ce7618e8a88d410350e95/130715_VSL.pdf).
|
|
|
|
5 km link working (14/8/2013)
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
... | @@ -150,11 +157,6 @@ |
... | @@ -150,11 +157,6 @@ |
|
- European deep-sea research infrastructure, hosting a neutrino
|
|
- European deep-sea research infrastructure, hosting a neutrino
|
|
telescope
|
|
telescope
|
|
- [Michigan State University](http://frib.msu.edu/)
|
|
- [Michigan State University](http://frib.msu.edu/)
|
|
- [MIKES](http://www.mikes.fi/Default.aspx) (Centre for metrology and
|
|
|
|
accreditation, Finland) (April 2013)
|
|
|
|
- [Evaluating WR for comparison and synchronization of
|
|
|
|
geographically distant atomic
|
|
|
|
clocks](https://www.ohwr.org/project/white-rabbit/uploads/c6b0314e91a7ce93ad556ee7afaeaa47/MIKES-CSC_WR_time_link.pdf)
|
|
|
|
- [National Synchrotron Radiation
|
|
- [National Synchrotron Radiation
|
|
Laboratory](http://en.nsrl.ustc.edu.cn), University of Science and
|
|
Laboratory](http://en.nsrl.ustc.edu.cn), University of Science and
|
|
Technology of China (Oct 2012)
|
|
Technology of China (Oct 2012)
|
... | @@ -203,5 +205,5 @@ also outside CERN. (centre for metrology, 25/7/13) |
... | @@ -203,5 +205,5 @@ also outside CERN. (centre for metrology, 25/7/13) |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
25 July 2013
|
|
14 August 2013
|
|
|
|
|