... | @@ -261,10 +261,10 @@ |
... | @@ -261,10 +261,10 @@ |
|
trigger-less scheme. Four subsystems should be separated via
|
|
trigger-less scheme. Four subsystems should be separated via
|
|
VLAN, and the [redundancy configurations similar to
|
|
VLAN, and the [redundancy configurations similar to
|
|
CERN](https://www.ohwr.org/project/white-rabbit/wikis/Documents/White-Rabbit-CERN-Control-and-Timing-Network) should be applied.
|
|
CERN](https://www.ohwr.org/project/white-rabbit/wikis/Documents/White-Rabbit-CERN-Control-and-Timing-Network) should be applied.
|
|
For 2013 it is planned to deploy a small portion of array (40-50
|
|
A small prototype array for the LHAASO experiment has run over a
|
|
nodes) in Tibet using
|
|
year. It contains four WR switches and 45
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) nodes.
|
|
(Jan.2013)
|
|
(Sept.2014)
|
|
- Start building a small WR network in Tibet. (Aug.2014)
|
|
- Start building a small WR network in Tibet. (Aug.2014)
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
... | | ... | |