... | @@ -35,10 +35,10 @@ |
... | @@ -35,10 +35,10 @@ |
|
- The LHAASO project has passed the technical review on the WR
|
|
- The LHAASO project has passed the technical review on the WR
|
|
timing distribution plan consists of *4 layers of WR switches
|
|
timing distribution plan consists of *4 layers of WR switches
|
|
(461 in total) covering 6880 nodes* of KM2A. It would be able to
|
|
(461 in total) covering 6880 nodes* of KM2A. It would be able to
|
|
provide both a timing
|
|
provide both a timing link and synchronous data acquisition
|
|
link and synchronous data acquisition network to every detector
|
|
network to every detector front-end for a trigger-less scheme.
|
|
front-end for a trigger-less scheme. For 2013 it is planned to
|
|
For 2013 it is planned to deploy a small portion of array (40-50
|
|
deploy a small portion of array (40-50 nodes) in Tibet using
|
|
nodes) in Tibet using
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) .
|
|
(Sept.2012)
|
|
(Sept.2012)
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
|
- Vrije Universiteit Amsterdam, dept of Physics and Astronomics
|
... | | ... | |