... | ... | @@ -29,7 +29,7 @@ |
|
|
Development for LHAASO
|
|
|
Project*](http://www.esrf.eu/icalepcs2011/html/auth0335.htm),
|
|
|
[ICALEPCS 2011 conference](http://icalepcs2011.esrf.eu)
|
|
|
- September 2012: \_"Supported by these [experimental
|
|
|
- September 2012: *"Supported by these [experimental
|
|
|
proof](https://www.ohwr.org/project/white-rabbit/uploads/1b941afc79f9784ea289434488cfc6df/tortureReport.v3.1.pdf),
|
|
|
the LHAASO project has passed the technical review on the WR
|
|
|
timing distribution plan consists of 4 layers of WR switches
|
... | ... | @@ -39,7 +39,7 @@ |
|
|
acquisition network to every detector front-end. We are
|
|
|
planning to deploy a small portion of array (40-50 nodes) in
|
|
|
Tibet early in next year using
|
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki.")_
|
|
|
[cute-wr](https://www.ohwr.org/project/cute-wr/wiki) ."*
|
|
|
- Design of [Compact Universal Timing Endpoint Based on White
|
|
|
Rabbit](https://www.ohwr.org/project/cute-wr/wiki) Open Hardware
|
|
|
FMC card.
|
... | ... | |