... | @@ -83,6 +83,23 @@ |
... | @@ -83,6 +83,23 @@ |
|
- 700 measurement nodes will be installed at three independent
|
|
- 700 measurement nodes will be installed at three independent
|
|
locations. (M.Emke, Feb.2015)
|
|
locations. (M.Emke, Feb.2015)
|
|
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
|
|
- [Culham Centre for Fusion Energy](http://www.ccfe.ac.uk/) (G.
|
|
|
|
Naylor, B.Huang, Jan.2013-Apr.2015)
|
|
|
|
- Real-Time Protection System that will prevent the MAST-U
|
|
|
|
machine’s magnetic coils from damage. The White Rabbit
|
|
|
|
collects the signals read from the coils and measure the level
|
|
|
|
of electrical current passing through them during a plasma
|
|
|
|
pulse. If the current gets too high, the Real-Time Protection
|
|
|
|
System automatically kicks in – gradually winding down the power
|
|
|
|
supplies so the pulse can be stopped without harming the
|
|
|
|
machine.
|
|
|
|
- This particular version of the switch has been adapted from one
|
|
|
|
used for data synchronization at CERN, so MAST-U is getting a
|
|
|
|
device with tried-and-tested performance in a ‘big science’
|
|
|
|
setting.
|
|
|
|
|
|
<!-- end list -->
|
|
<!-- end list -->
|
|
|
|
|
|
- [DESY](http://tunka-hrjrg.desy.de), Germany
|
|
- [DESY](http://tunka-hrjrg.desy.de), Germany
|
... | @@ -519,5 +536,5 @@ choose White Rabbit as a main time distribution system. (JINR, 7/10/14) |
... | @@ -519,5 +536,5 @@ choose White Rabbit as a main time distribution system. (JINR, 7/10/14) |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
23 March 2015
|
|
28 April 2015
|
|
|
|
|