... | ... | @@ -135,18 +135,12 @@ |
|
|
<!-- end list -->
|
|
|
|
|
|
- [China Spallation Neutron Source Institute of High Energy Physics
|
|
|
Chinese Academy of Sciences -
|
|
|
CSNS](http://csns.ihep.ac.cn/english/), Beijing, China (Oct 2012,
|
|
|
April 2017)
|
|
|
Chinese Academy of Sciences - CSNS](http://csns.ihep.ac.cn/english/), Beijing, China (Oct 2012, April 2017)
|
|
|
- Timing system of the spectrometer. Target and instrument control
|
|
|
|
|
|
- Experimental control of the neutron spectrometer during the
|
|
|
construction of the project.
|
|
|
- [The time synchronization of CSNS neutron
|
|
|
instrument](http://ieeexplore.ieee.org/document/7543087/), Real
|
|
|
- Experimental control of the neutron spectrometer during the construction of the project.
|
|
|
- [The time synchronization of CSNS neutron instrument](http://ieeexplore.ieee.org/document/7543087/), Real
|
|
|
Time Conference (RT), 2016 IEEE-NPSS, J.Zhuang et al.
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [CHIRON-IT](http://chiron-it.nl/), The Netherlands
|
|
|
- Measurement system for high-voltage tests, using
|
... | ... | @@ -155,22 +149,12 @@ |
|
|
- 700 measurement nodes will be installed at three independent
|
|
|
locations. (M.Emke, Feb.2015)
|
|
|
|
|
|
* [CNGS](https://en.wikipedia.org/wikis/CERN_Neutrinos_to_Gran_Sasso)
|
|
|
Timing for neutrino measurements (2012-2014), Italy
|
|
|
|
|
|
*\* *We are running now 9 SPECs for our gamma-ray array prototype.*
|
|
|
(November 2013)
|
|
|
|
|
|
*\* [*Performance results of the first White Rabbit installation for
|
|
|
CNGS time
|
|
|
transfer*](https://www.ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf)
|
|
|
(pdf)
|
|
|
- [CNGS](https://en.wikipedia.org/wikis/CERN_Neutrinos_to_Gran_Sasso) Timing for neutrino measurements (2012-2014), Italy
|
|
|
- *We are running now 9 SPECs for our gamma-ray array prototype.* (November 2013)
|
|
|
- [*Performance results of the first White Rabbit installation for CNGS time transfer*](https://www.ohwr.org/project/white-rabbit/uploads/f6b8a652d6227219136039f81729727f/ISPCS2012_WRinCNGS.pdf) (pdf)
|
|
|
- [CERN to Gran Sasso Time Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
|
|
|
|
*\* [CERN to Gran Sasso Time
|
|
|
Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki)
|
|
|
|
|
|
- [CTA - Cherenkov Telescope Array](http://www.cta-observatory.org/),
|
|
|
[32
|
|
|
- [CTA - Cherenkov Telescope Array](http://www.cta-observatory.org/), [32
|
|
|
countries](https://en.wikipedia.org/wikis/Cherenkov_Telescope_Array#cta_consortium_members_and_ctao_shareholders)
|
|
|
- [Array Time Synchronization - First Tests with
|
|
|
WhiteRabbit](http://www.ifh.de/~wischnew/talks/cta/collaboration_amsterdam_201205/wr_using_amsterdam_finpub.pdf)
|
... | ... | @@ -186,7 +170,6 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
board](http://accelconf.web.cern.ch/AccelConf/icalepcs2017/papers/tupha090.pdf)
|
|
|
*C. Champion et al, CTA Consortium, ICALEPCS 2017*
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [Culham Centre for Fusion Energy](http://www.ccfe.ac.uk/) (G.
|
|
|
Naylor, S.Hall, B.Huang, Jan.2013-Apr.2015), UK
|
... | ... | @@ -397,7 +380,6 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
- This WR network will be the first WR implementation on North
|
|
|
America. (D.Torretta, 3/2017)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [GSI Helmholtzzentrum für Schwerionenforschung
|
|
|
GmbH](https://www.gsi.de), Germany
|
... | ... | @@ -422,7 +404,8 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
Documents](https://www-acc.gsi.de/wikis/Timing/TimingSystemDocuments)
|
|
|
(papers, technical documents)
|
|
|
|
|
|
<!-- end list -->
|
|
|
- [HERA - Hydrogen Epoch of Reionization Array](https://reionization.org/)
|
|
|
- Radio telescope dedicated to observing large scale structure during and prior to the epoch of reionization.(2/2020)
|
|
|
|
|
|
- [IMPCAS - The Institute of Modern Physics (IMP) of the Chinese
|
|
|
Academy of Sciences](http://english.imp.cas.cn/), China
|
... | ... | @@ -533,10 +516,8 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
|
|
|
- [KRISS](https://www.kriss.re.kr/eng/main/main.html) (Korea)
|
|
|
- Transfer of UTC\[KRIS\] from KRISS to Korea Electric Power
|
|
|
company using White Rabbit. (January
|
|
|
2019)
|
|
|
company using White Rabbit. (January 2019)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [LHAASO](http://physicsworld.com/cws/article/news/2016)
|
|
|
([Tsinghua University,
|
... | ... | @@ -591,7 +572,6 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
-LHAASO*](http://icrc2009.uni.lodz.pl/proc/pdf/icrc1168.pdf)
|
|
|
(general article about LHAASO)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [LNE-SYRTE](http://lne-syrte.obspm.fr/): the French National
|
|
|
Metrology Institutes (2015-), France
|
... | ... | @@ -613,10 +593,8 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
[LNE-SYRTE](http://lne-syrte.obspm.fr/): the French National
|
|
|
Metrology Institutes (2015-), France (Oct.2018)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [MIKES](http://www.mikes.fi/en) (Centre for metrology and
|
|
|
accreditation, Finland) (April 2013)
|
|
|
- [MIKES](http://www.mikes.fi/en) (Centre for metrology and accreditation, Finland) (April 2013)
|
|
|
- [White Rabbit at MIKES](mikes) OHR wiki page
|
|
|
- [Evaluating WR for comparison and synchronization of
|
|
|
geographically distant atomic
|
... | ... | @@ -641,10 +619,9 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
UTC\[MIKE\]](https://maanmittauslaitos.fi/en/topical_issues/metsahovi-connected-official-time-finland)
|
|
|
(Aug.2017)
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [Paris Observatory](http://www.obspm.fr/?lang=en) (Observatoire de
|
|
|
Paris / CNRS-INSU, CNRS-IN2P3), France (July 2015)
|
|
|
|
|
|
- [Paris Observatory](http://www.obspm.fr/?lang=en) (Observatoire de Paris / CNRS-INSU, CNRS-IN2P3), France (July 2015)
|
|
|
- [NEBuLA - Wideband digitiser for
|
|
|
astronomy](http://nebula.obs-nancay.fr/?lang=en) (NumEriseur à
|
|
|
Bande Large pour l’Astronomie)
|
... | ... | @@ -654,7 +631,14 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
- Provide time and frequency references to allow for
|
|
|
multi-antennae processing, further in the chain.
|
|
|
|
|
|
<!-- end list -->
|
|
|
- [SKA - Square Kilometre Array](http://skatelescope.org).
|
|
|
- The dish receivers have to maintain coherence - which means
|
|
|
phase stability to an equivalent rms of 1 ps over time scales of
|
|
|
10-15 mins. This can be done by using go and return signals on
|
|
|
optical fibre. In addition time at the dishes and stations need
|
|
|
to be known to a few ns. The latter could be done by a network
|
|
|
of GPS receivers, NPT or White Rabbit. White Rabbit looks good
|
|
|
in terms of cost/performance.
|
|
|
|
|
|
- [Universiteit van Amsterdam](http://www.uva.nl/en/home),
|
|
|
[API](http://www.astro.uva.nl),
|
... | ... | @@ -673,8 +657,6 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
facilities
|
|
|
([presentation](http://indico.cern.ch/event/192695/session/14/contribution/152/material/slides/0.pdf))
|
|
|
|
|
|
<!-- end list -->
|
|
|
|
|
|
- [Vrije Universiteit Amsterdam, dept of Physics and
|
|
|
Astronomics](https://www.nat.vu.nl/en/index.aspx), The Netherlands
|
|
|
- [SuperGPS through optical
|
... | ... | @@ -682,8 +664,7 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
- [Workshop on Optical Networks for Accurate Time and Frequency
|
|
|
Transfer](http://www.ptb.de/emrp/1328.html)
|
|
|
- Partners
|
|
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3)
|
|
|
)
|
|
|
- Dutch Metrology Institute ([VSL Delft](http://www.vsl.nl/3))
|
|
|
- [Slides of
|
|
|
plans](https://www.ohwr.org/project/white-rabbit/uploads/40120120076ce7618e8a88d410350e95/130715_VSL.pdf).
|
|
|
5 km link working (14/8/2013)
|
... | ... | @@ -750,14 +731,6 @@ Transfer](https://www.ohwr.org/project/cngs-time-transfer/wiki) |
|
|
Technology of China, China (Oct 2012)
|
|
|
- Upgrade of the timing and control systems of accelerators. Will
|
|
|
build demo to assess the feasibility.
|
|
|
- [SKA - Square Kilometre Array](http://skatelescope.org).
|
|
|
- The dish receivers have to maintain coherence - which means
|
|
|
phase stability to an equivalent rms of 1 ps over time scales of
|
|
|
10-15 mins. This can be done by using go and return signals on
|
|
|
optical fibre. In addition time at the dishes and stations need
|
|
|
to be known to a few ns. The latter could be done by a network
|
|
|
of GPS receivers, NPT or White Rabbit. White Rabbit looks good
|
|
|
in terms of cost/performance.
|
|
|
- [SPring-8](http://www.spring8.or.jp/en) (Japan) (Nov 2014)
|
|
|
- An evaluation system for a new trigger and tag information
|
|
|
distribution system using White Rabbit.
|
... | ... | @@ -1162,5 +1135,5 @@ _Experience is excellent (\!\!)._ (DESY, 28/10/13) |
|
|
|
|
|
-----
|
|
|
|
|
|
9 December 2019
|
|
|
26 February 2020
|
|
|
|