... | @@ -75,10 +75,6 @@ experiments](https://www.ohwr.org/project/white-rabbit/uploads/c53d97afcb8b91fef |
... | @@ -75,10 +75,6 @@ experiments](https://www.ohwr.org/project/white-rabbit/uploads/c53d97afcb8b91fef |
|
|
|
|
|
### 2012
|
|
### 2012
|
|
|
|
|
|
[White Rabbit Switch stress
|
|
|
|
tests](https://www.ohwr.org/project/white-rabbit/uploads/9ff8b1c387cc070bfc969dc87ac0894c/tortureReport2-byBenoit.pdf)
|
|
|
|
*Benoit RAT, Seven Solutions, December 2012*
|
|
|
|
|
|
|
|
*Implementation and Evaluation of a PTP Transparent Clock Based on
|
|
*Implementation and Evaluation of a PTP Transparent Clock Based on
|
|
White Rabbit Technology**
|
|
White Rabbit Technology**
|
|
*Cesar Prados, ISPCS2012, San Francisco, USA, 2012*
|
|
*Cesar Prados, ISPCS2012, San Francisco, USA, 2012*
|
... | @@ -111,10 +107,6 @@ controls](http://prst-ab.aps.org/pdf/PRSTAB/v15/i8/e082801) |
... | @@ -111,10 +107,6 @@ controls](http://prst-ab.aps.org/pdf/PRSTAB/v15/i8/e082801) |
|
Lewis, J. Serrano, T. Wlostowski, Phys Rev Spec Top Acc Beams 15 (2012)
|
|
Lewis, J. Serrano, T. Wlostowski, Phys Rev Spec Top Acc Beams 15 (2012)
|
|
082801*
|
|
082801*
|
|
|
|
|
|
[Torture
|
|
|
|
Report](https://www.ohwr.org/project/white-rabbit/uploads/9499d6742a17ba43ee4c7daa1ebd68fb/tortureReport.v3.2.pdf)
|
|
|
|
*Maciej Lipinski*
|
|
|
|
|
|
|
|
[How to setup a mini WhiteRabbit network with two SPEC cards (Master ↔
|
|
[How to setup a mini WhiteRabbit network with two SPEC cards (Master ↔
|
|
Slave)](https://www.ohwr.org/project/spec/wikis/WRw2SPEC)
|
|
Slave)](https://www.ohwr.org/project/spec/wikis/WRw2SPEC)
|
|
*Martin Bruckner, Ralf Wischnewski*
|
|
*Martin Bruckner, Ralf Wischnewski*
|
... | @@ -233,5 +225,5 @@ Christchurch, New Zealand* |
... | @@ -233,5 +225,5 @@ Christchurch, New Zealand* |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
18 June 2014
|
|
14 August 2014
|
|
|
|
|