... | @@ -75,7 +75,9 @@ following projects: |
... | @@ -75,7 +75,9 @@ following projects: |
|
|June-2018| The first major beam time using WR-based timing system at GSI (134 WR nodes, 32 WR switches)|
|
|
|June-2018| The first major beam time using WR-based timing system at GSI (134 WR nodes, 32 WR switches)|
|
|
|06-10-2018|[10th WR Workshop](Oct2018Meeting), Geneva (Switzerland)|
|
|
|06-10-2018|[10th WR Workshop](Oct2018Meeting), Geneva (Switzerland)|
|
|
|16-06-2020|[WR standardization](https://ohwr.org/project/wr-std/wikis/Home) is completed. The [IEEE1588-2019](https://standards.ieee.org/standard/1588-2019.html) is published incorporating White Rabbit <br/> as High Accuracy Profile/Options |
|
|
|16-06-2020|[WR standardization](https://ohwr.org/project/wr-std/wikis/Home) is completed. The [IEEE1588-2019](https://standards.ieee.org/standard/1588-2019.html) is published incorporating White Rabbit <br/> as High Accuracy Profile/Options |
|
|
|
|
|06-10-2021|[11th WR Workshop](Oct2021Meeting), online|
|
|
|
|
|08-10-2022|[12th WR workshop](Oct2022Meeting), Geneva (Switzerland).|
|
|
|
|
|21-03-2024|[13th WR workshop and WR Collaboration Launch](Mar2024Meeting), Geneva (Switzerland).|
|
|
-----
|
|
-----
|
|
|
|
|
|
17 June 2020
|
|
17 June 2020
|
... | | ... | |