# [White-Rabbit](White-Rabbit) -\> Status
|
|
# [White-Rabbit](White-Rabbit) -\> Status
|
|
|
|
|
|
|
|
# Status
|
|
|
|
|
|
The White Rabbit project was started in 2008 by Javier Serrano and his
|
|
The White Rabbit project was started in 2008 by Javier Serrano and his
|
|
colleagues. From the start it has been a collaborative effort where
|
|
colleagues. From the start it has been a collaborative effort where
|
|
everyone works together to make a working solution.
|
|
everyone works together to make a working solution.
|
|
|
|
|
|
By summer 2012 we have built 18-port switches and use the SPEC hardware
|
|
By summer 2012 we have built 18-port switches and use the SPEC hardware
|
|
as end nodes. The switches are available from industry with a delivery
|
|
as end nodes and have made a demonstration program where one can see
|
|
time of three to six months, while the SPEC boards are usually available
|
|
that the WR protocol lives up to its promises. For small systems where a
|
|
from stock.
|
|
single end node is sufficient, software has been written to run the
|
|
|
|
White Rabbit protocol between two SPEC boards and associated digital I/O
|
|
|
|
FMC mezzanines.
|
|
|
|
|
|
For small systems where a single end node is sufficient, software has
|
|
Many institutes (notably GSI) have also built WR end nodes, while the
|
|
been written to run the White Rabbit protocol between two SPEC boards
|
|
company National Instruments is designing a WR receiver for their PXI
|
|
and associated digital I/O FMC mezzanines.
|
|
measurement systems.
|
|
|
|
|
|
# Status
|
|
[Many users](WRUsers) are building small test systems to evaluate the
|
|
|
|
performance for use in their upcoming applications.
|
|
|
|
|
|
|
|
The switches are available from industry with a delivery time of three
|
|
|
|
to six months, while the SPEC end node boards are usually available from
|
|
|
|
stock.
|
|
|
|
|
|
|
|
There is still a lot of work to be done, but globally the main work is
|
|
|
|
in the following projects:
|
|
|
|
|
|
|
|
- finalise the firmware of the switch
|
|
|
|
- create more easy to produce switch hardware
|
|
|
|
- finalise and support a WR demonstrator program using two SPEC boards
|
|
|
|
- work on standardisation of the protocol
|
|
|
|
- WR enable different mezzanine cards (TDC, ADC, Fine Delay)
|
|
|
|
- document and support users of White Rabbit
|
|
|
|
- the [6th WR
|
|
|
|
workshop](https://www.ohwr.org/white-rabbit/wikis/Mar2012Meeting)
|
|
|
|
created a rather complete [To-do
|
|
|
|
list](https://www.ohwr.org/project/white-rabbit/uploads/c9fca12af3471f92c023bf086b891bb2/todo.txt)
|
|
|
|
|
|
|
|
# Major events
|
|
|
|
|
|
<table>
|
|
<table>
|
|
<tbody>
|
|
<tbody>
|
... | @@ -42,30 +67,42 @@ and associated digital I/O FMC mezzanines. |
... | @@ -42,30 +67,42 @@ and associated digital I/O FMC mezzanines. |
|
<td><a href="WhiteRabbitSwitch">Switch MCH</a> card v2 PCB ready.</td>
|
|
<td><a href="WhiteRabbitSwitch">Switch MCH</a> card v2 PCB ready.</td>
|
|
</tr>
|
|
</tr>
|
|
<tr class="odd">
|
|
<tr class="odd">
|
|
|
|
<td>28-06-2010</td>
|
|
|
|
<td><a href="https://www.ohwr.org/news/6">Report on measuring propagation delay in FPGAs</a> builds groundwork.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
<td>08-10-2010</td>
|
|
<td>08-10-2010</td>
|
|
<td>[WR switch PTP compliance tested in ISPCS 2010 plugfest](https://www.ohwr.org/news/8).</td>
|
|
<td>[WR switch PTP compliance tested in ISPCS 2010 plugfest](https://www.ohwr.org/news/8).</td>
|
|
</tr>
|
|
</tr>
|
|
<tr class="even">
|
|
<tr class="odd">
|
|
<td>10-12-2010</td>
|
|
<td>10-12-2010</td>
|
|
<td>First <a href="Dec2010Meeting">developer meeting</a>. Basic Ethernet switching demonstrated.</td>
|
|
<td>First <a href="Dec2010Meeting">developer meeting</a>. Basic Ethernet switching demonstrated.</td>
|
|
</tr>
|
|
</tr>
|
|
<tr class="odd">
|
|
<tr class="even">
|
|
<td>14-04-2011</td>
|
|
<td>14-04-2011</td>
|
|
<td><a href="Apr2011Meeting">4th WR Workshop</a>. PTP working on a WR node.</td>
|
|
<td><a href="Apr2011Meeting">4th WR Workshop</a>. PTP working on a WR node.</td>
|
|
</tr>
|
|
</tr>
|
|
<tr class="even">
|
|
<tr class="odd">
|
|
<td>02-09-2011</td>
|
|
<td>02-09-2011</td>
|
|
<td><a href="https://www.ohwr.org/project/spec/wikis/Software#Software">WR Demonstration package</a> documented (SPEC-Switch-SPEC).</td>
|
|
<td><a href="https://www.ohwr.org/project/spec/wikis/Software#Software">WR Demonstration package</a> documented (SPEC-Switch-SPEC).</td>
|
|
</tr>
|
|
</tr>
|
|
<tr class="odd">
|
|
<tr class="even">
|
|
<td>19-09-2011</td>
|
|
<td>19-09-2011</td>
|
|
<td>[5th WR Workshop](Sep2011Meeting).</td>
|
|
<td>[5th WR Workshop](Sep2011Meeting).</td>
|
|
</tr>
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>05-03-2012</td>
|
|
|
|
<td>CERN received 4 WR V3 switches.</td>
|
|
|
|
</tr>
|
|
<tr class="even">
|
|
<tr class="even">
|
|
<td>22-03-2012</td>
|
|
<td>22-03-2012</td>
|
|
<td>[6th WR Workshop](Mar2012Meeting).</td>
|
|
<td>[6th WR Workshop](Mar2012Meeting).</td>
|
|
</tr>
|
|
</tr>
|
|
<tr class="odd">
|
|
<tr class="odd">
|
|
|
|
<td>23-05-2012</td>
|
|
|
|
<td><a href="https://www.ohwr.org/project/wr-std/news">White Rabbit presented at IEEE 802.1 (AVB Gen 2) meeting</a> in view of standardization.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
<td>08-06-2012</td>
|
|
<td>08-06-2012</td>
|
|
<td><a href="https://www.ohwr.org/project/spec/wikis/Software#Software">Mini WhiteRabbit network with two SPEC cards</a> documented (SPEC-SPEC).</td>
|
|
<td><a href="https://www.ohwr.org/project/spec/wikis/Software#Software">Mini WhiteRabbit network with two SPEC cards</a> documented (SPEC-SPEC).</td>
|
|
</tr>
|
|
</tr>
|
... | | ... | |