|
# [White-Rabbit](White-Rabbit) -\> Status
|
|
# [White-Rabbit](White-Rabbit) -\> Status
|
|
|
|
|
|
|
|
The White Rabbit project was started in 2008 by Javier Serrano and his
|
|
|
|
colleagues. From the start it has been a collaborative effort where
|
|
|
|
everyone works together to make a working solution.
|
|
|
|
|
|
|
|
By summer 2012 we have built 18-port switches and use the SPEC hardware
|
|
|
|
as end nodes. The switches are available from industry with a delivery
|
|
|
|
time of three to six months, while the SPEC boards are usually available
|
|
|
|
from stock.
|
|
|
|
|
|
|
|
For small systems where a single end node is sufficient, software has
|
|
|
|
been written to run the White Rabbit protocol between two SPEC boards
|
|
|
|
and associated digital I/O FMC mezzanines.
|
|
|
|
|
|
|
|
# Status
|
|
|
|
|
|
|
|
<table>
|
|
|
|
<tbody>
|
|
|
|
<tr class="odd">
|
|
|
|
<td><strong>Date</strong></td>
|
|
|
|
<td><b> Event </b></td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>15-02-2008</td>
|
|
|
|
<td><a href="http://indico.cern.ch/conferenceDisplay.py?confId=28233">White Rabbit workshop 1</a>. Project start.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>27-10-2008</td>
|
|
|
|
<td>[White Rabbit workshop 2](http://indico.cern.ch/conferenceDisplay.py?confId=43741).</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>20-07-2009</td>
|
|
|
|
<td><a href="Workshop3">White Rabbit workshop 3</a>. Demonstration of a stabilized link.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>01-04-2010</td>
|
|
|
|
<td><a href="WhiteRabbitSwitch">Switch MCH</a> card v2 PCB ready.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>22-09-2010</td>
|
|
|
|
<td>Enclosure for mini-backplane and MCH v2 ready.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>10-12-2010</td>
|
|
|
|
<td>First <a href="Dec2010Meeting">developer meeting</a>. Basic Ethernet switching demonstrated.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>14-04-2011</td>
|
|
|
|
<td><a href="Apr2011Meeting">4th WR Workshop</a>. PTP working on a WR node.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>19-09-2011</td>
|
|
|
|
<td>[5th WR Workshop](Sep2011Meeting).</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>22-03-2012</td>
|
|
|
|
<td>[6th WR Workshop](Mar2012Meeting).</td>
|
|
|
|
</tr>
|
|
|
|
</tbody>
|
|
|
|
</table>
|
|
|
|
|
|
|
|
-----
|
|
|
|
|
|
|
|
29 June 2012
|
|
|
|
|