... | @@ -74,7 +74,7 @@ following projects: |
... | @@ -74,7 +74,7 @@ following projects: |
|
|28-06-2018|[2st WR Tutorial Workshop](Jun2018Meeting), Beijing (China)|
|
|
|28-06-2018|[2st WR Tutorial Workshop](Jun2018Meeting), Beijing (China)|
|
|
|June-2018| The first major beam time using WR-based timing system at GSI (134 WR nodes, 32 WR switches)|
|
|
|June-2018| The first major beam time using WR-based timing system at GSI (134 WR nodes, 32 WR switches)|
|
|
|06-10-2018|[10th WR Workshop](Oct2018Meeting), Geneva (Switzerland)|
|
|
|06-10-2018|[10th WR Workshop](Oct2018Meeting), Geneva (Switzerland)|
|
|
|16-06-2020| [IEEE1588-2019](https://standards.ieee.org/standard/1588-2019.html) published, it incorporates White Rabbit as High Accuracy Profile/Options |
|
|
|16-06-2020|[WR standardization](https://ohwr.org/project/wr-std/wikis/Home) is completed. The [IEEE1588-2019](https://standards.ieee.org/standard/1588-2019.html)is published and it incorporates White Rabbit as High Accuracy Profile/Options |
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
... | | ... | |