... | ... | @@ -28,9 +28,8 @@ There is still a lot of work to be done, but globally the main work is |
|
|
in the following projects:
|
|
|
|
|
|
- finalise the firmware of the switch
|
|
|
- create more easy to produce switch hardware
|
|
|
- finalise and support a WR demonstrator program using two SPEC boards
|
|
|
- work on standardisation of the protocol
|
|
|
- work on standardisation of the protocol ([WR Standardization
|
|
|
project](https://www.ohwr.org/project/wr-std/wiki))
|
|
|
- WR enable different mezzanine cards
|
|
|
([TDC](https://www.ohwr.org/project/fmc-tdc/wiki),
|
|
|
[ADC](https://www.ohwr.org/project/fmc-adc-100m14b4cha/wiki), [Fine
|
... | ... | @@ -114,10 +113,14 @@ in the following projects: |
|
|
<td>White Rabbit PTP extension proposed to be included in revision of IEEE PTP standard at <a href="http://www.ispcs.org/2012/">ISPCS</a> (<a href="https://www.ohwr.org/project/white-rabbit/uploads/b0c0f513bf8734bc856f6860fa693201/ISPCS2012-specialSession-final.pdf">document</a>, [presentation](https://www.ohwr.org/project/white-rabbit/uploads/442e2b2eca547f69b85c28ff465ce240/WRspecialSession_Maciej_ISPCS2012.pdf)).</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>27-10-2012</td>
|
|
|
<td><a href="Nov2012Meeting">7th WR Workshop</a>. Showing the final production version of the switch.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>17-01-2013</td>
|
|
|
<td><a href="https://www.ohwr.org/project/wr-starting-kit/wiki">White Rabbit Starting Kit</a> available.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<tr class="even">
|
|
|
<td>24-01-2013</td>
|
|
|
<td>White Rabbit switch V3.3 passes all CE marking tests (power, electrical safety, labels, EMI).</td>
|
|
|
</tr>
|
... | ... | @@ -126,5 +129,5 @@ in the following projects: |
|
|
|
|
|
-----
|
|
|
|
|
|
24 January 2013
|
|
|
5 February 2013
|
|
|
|