# masterFIP Users
|
|
|
|
|
|
All the Alstom masters installed in the LHC will be **migrated** to the
|
|
|
new masterFIP in 2018, at the beginning of LS2.
|
|
|
The applications that are concerned are listed in the table below, along
|
|
|
with the migration date of their software.
|
|
|
All the Alstom masters (~500) installed in the LHC will be **replaced**
|
|
|
by the new design in 2019, at the beginning of CERN's Long Shutdown 2.
|
|
|
|
|
|
<table>
|
|
|
<tbody>
|
|
|
<tr class="odd">
|
|
|
<td><strong>Application</strong></td>
|
|
|
<td><b><strong>Sw midration date</strong> </b></td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td><strong>Cryogenics</strong></td>
|
|
|
<td>06-2016</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td><strong>Radiation Monitoring</strong></td>
|
|
|
<td>09-2016</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td><strong>Quench Protection System</strong></td>
|
|
|
<td>10-2016</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td><strong>Function Generator Controller</strong></td>
|
|
|
<td>02-2017</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td><strong>Beam Instrumentation</strong></td>
|
|
|
<td>03-2017</td>
|
|
|
</tr>
|
|
|
</tbody>
|
|
|
</table>
|
|
|
Since 2016 we have replaced **lab installations**, of some of the most
|
|
|
critical LHC users, as listed in the table below.
|
|
|
| **Application**| \***Midration date** \*|
|
|
|
|**Cryogenics**| 06-2016 |
|
|
|
|**Radiation Monitoring**| 09-2016 |
|
|
|
|**Quench Protection System**| 10-2016 |
|
|
|
|**Function Generator Controller**| 02-2017 |
|
|
|
|**Beam Instrumentation**| 03-2017 |
|
|
|
|
|
|
Currently, there are also few installations **in operation**:
|
|
|
| **Application**| \***Facility** **|Date** \*|
|
|
|
|**Rad-Mon**| CHARM| 04-2017 |
|
|
|
|**Rad-Mon**| AWAKE| 06-2017 |
|
|
|
|
|
|
-----
|
|
|
|
|
|
-----
|
|
|
|
|
|
*E.Gousiou, 08 March 2017*
|
|
|
*E.Gousiou, 20 June 2017*
|
|
|
|