|
|
|
# masterFIP Users
|
|
|
|
|
|
|
|
All the Alstom masters installed in the LHC will be **migrated** to the
|
|
|
|
new masterFIP in 2018, at the beginning of LS2.
|
|
|
|
The applications that are concerned are listed in the table below, along
|
|
|
|
with the migration date of their software.
|
|
|
|
|
|
|
|
<table>
|
|
|
|
<tbody>
|
|
|
|
<tr class="odd">
|
|
|
|
<td><strong>Application</strong></td>
|
|
|
|
<td><b><strong>Sw midration date</strong> </b></td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td><strong>Cryogenics</strong></td>
|
|
|
|
<td>06-2016</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td><strong>Radiation Monitoring</strong></td>
|
|
|
|
<td>09-2016</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td><strong>Quench Protection System</strong></td>
|
|
|
|
<td>10-2016</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td><strong>Function Generator Controller</strong></td>
|
|
|
|
<td>02-2017</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td><strong>Beam Instrumentation</strong></td>
|
|
|
|
<td>03-2017</td>
|
|
|
|
</tr>
|
|
|
|
</tbody>
|
|
|
|
</table>
|
|
|
|
|